Status di EMC (forward) e richieste finaziamenti C. Cecchi Università di Perugia e INFN - Physics analysis - Mechanical test - Electronics - Simulation.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

R P Rivelazione Acustica Particelle A bassa temperatura e in Superconduttori Sommario problematica e risultati Nautilus Attivita svolta Programma del prossimo.
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
Istruzione, Tirocinio e Lavoro
Il Futuro The Future Tense.
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
INSIDE UPDATES M. Giuseppina Bisogni PISA, 16/09/2014.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
1 CSN1 - Lecce 22/09/2003 Babar Relazione e proposte finanziarie Referee: M. de Palma, P. Lubrano, C. Luci, L. Perini,A. Staiano.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
Metodi Quantitativi per Economia, Finanza e Management Lezioni n° 7-8.
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
B.Borgia 26/3/20081 Stato elettronica UG controllo TRD 26 Marzo 2008 A.Bartoloni, B.Borgia, F.Spada.
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
Viruses.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
MUG-TEST A. Baldini 29 gennaio 2002
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
R.N. - Referees LHCB - CSN1 06/021 LHCB : proposte dei referees Giulio D’Agostini Chiara Meroni Rosario Nania.
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
15.11,2005 LNFMarcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa ROADMAP B and SUPER B in Italia Gruppo1 LNF 15Novembre, 2005.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
Timing and pixel Diamond Plans for phase I and II
Proposta Upgrade activities for Rome in 2014 Francesca 1.
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
L. Carminati - P. GovoniIII Workshop sull fisica di ATLAS-CMS1 sessione di discussione uno spunto: la calibrazione in situ dei rivelatori CALORIMETRI ELETROMAGNETICI:
1 CSN1 - Lecce 26/09/2003 TOTEM Relazione e proposte finanziarie Referee: G: Chiefari, M. Curatolo, M. de Palma.
SuperB – referee report W. Bonivento, M.Masera, D. Pedrini, L. Rossi, C. Troncon 21/01/13Leonardo Rossi1.
SuperB – referee report W. Bonivento, M.Masera, D. Pedrini, L. Rossi, C. Troncon 17/7/12Leonardo Rossi1.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
1 referee-BaBar CSN I, LNF giugno 2007 RELAZIONE DEI REFEREE DI BaBar M.De Palma, C.Luci, C.Troncon, B.Gobbo(calcolo) 26 giugno 2007.
Buon giorno, ragazzi oggi è il quattro aprile duemilasedici.
RPC R&D ATLAS-CMS WG4 D. Piccolo, B. Liberti per il WG4 1.
The Project Francesco Forti, INFN and University, Pisa Commissione Scientifica Nazionale 1 29 Giugno 2009 Status update.
1 referee-BaBar CSN I, Roma Gennaio 2008 RELAZIONE DEI REFEREE DI BaBar e SuperB M.De Palma, C.Luci, C.Troncon, B.Gobbo(calcolo),D. Pedrini
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
G-2 It G. Venanzoni LNF/INFN G-2 IT Meeting, Fiume Ottobre
1 Stato del PID a Padova e richieste. 2 Update sul PID a Padova  Costruzione camere termostatiche  Box in alluminio coibentato, raffreddato con peltier.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
Richieste IFR 2011 Roberto Calabrese Università e INFN – Ferrara Marzo 2011.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
SuperB Relazione dei Referees M.De Palma, C.Luci, C.Troncon, B.Gobbo, D. Pedrini.
Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie (aggiornamenti) Domenico Elia Riunione Referee Calcolo LHC / Bologna, Riunione con.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Riunione ALICE Italia - Referee stato e richieste finanziarie
Roberto Calabrese Università e INFN - Ferrara
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Daniele Pedrini INFN Milano-Bicocca
Assegnazione risorse Stato INFN CNAF,
PixFEL PV Personale partecipante e richieste finanziarie
R&D fase 2 – RPC 4st meeting
Gigi Cosentino - LNL 20 ottobre 2016
Programma di attività e preventivo di spesa 2013
SuperB – Richieste Sblocchi 2008
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
Proposal for the Piceno Lab on Mediterranean Diet
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

Status di EMC (forward) e richieste finaziamenti C. Cecchi Università di Perugia e INFN - Physics analysis - Mechanical test - Electronics - Simulation - Test beam - Richieste finanziarie

Detector geometry working group Open questions on the overall detector geometry –Do we need a forward PID (eventually backward) ? –Do we need a backward EMC ? Which is the best choice for the internal geometry of the forward EMC (dead material and energy resolution...) –Which is the needed ammount of absorber on the IFR? –Which is the best choice for the internal geometry of SVT / space between SVT and DCH ? Use golden channels to answer Br, A CP (B  X s g) Br(B  t n)Br(B  X s l l ) Br(B  X s n n) S(K s p 0 g) b t  m g 11/03/2009 Claudia Cecchi

Exploting Recoil Physics In many BaBar analysis, one of the 2 B’s is reconstructed in hadronic or semileptonic modes: High statistic and clean sample Allow to search for rare decays with missing energy (RECOIL TECNIQUE) –B   –B  K ( * ) –B  invisible –..... SL Breco B  D (*) l HAD Breco B  D (*) n 1  n 2 K n 3 K s n 4  0 Y(4S) n K*K* n B sig B reco D (*) golden channels for the physics program reconstruction efficiency O(10 -3 ) 11/03/2009 Claudia Cecchi

Perugia’s contribution Implement the reconstruction of Hadronic B modes (Had Breco) in FastSim Study the impact of the different PID devices (DIRC, FW TOF, BW TOF) in the HAD Breco reconstruction Reconstruct rare decays (B->K (*), B->  ) recoiling against HAD Breco and evaluate the impact of –PID devices –backward EMC –different energy resolution due to different forward EMC geometry 11/03/2009 Claudia Cecchi

11/03/2009 Claudia Cecchi Mechanical test Some test already performed in Ancona: - measurement of elastic module via Laser Doppler Vibrometry (LDV), hammer with charge amplifier, non destructive test; - measurement of ultimate strength and of elastic module via compression test, destructive; E1= 131±12 GPa (Measured on PbWO 70 – 80 Gpa litterature 130 GPa) E2 ≈ GPa Ultimate strength 300 – 400 MPa, one order of magnitude bigger than in PbWO, 20 – 30 Mpa, (used a different technique, test has to be redone)

11/03/2009 Claudia Cecchi Mechanical test cont’d Small crystals bought to perform definitive tests: delivered from St. Gobain 13 pcs, 6 in Casaccia for annealing, test will start next week. Mechanical tests are very important for the definition of the mechanical structure, a first study has been accomplished by C. Gargiulo more is in definition.

February , Orsay Paris Claudia Cecchi University of Perugia and INFN

February , Orsay Paris Claudia Cecchi University of Perugia and INFN

February , Orsay Paris Claudia Cecchi University of Perugia and INFN

February , Orsay Paris Claudia Cecchi University of Perugia and INFN

11/03/2009 Claudia Cecchi

11/03/2009 Claudia Cecchi Mechanics More study is needed to understand the effect of the space between modules. - What about a whole structure not modular design? Not recommended by engineer ( problems of integration, handling, recovery) - Proposal from D. Hitlin maintain the Babar structure, putting inside a single hole 4 LSO crystals (dimensions of BaBar crystals are half of superB design) - What about a geometry with LSO crystals the same size of BaBar ones? All under investigation, first point with engineer, second and third need simulations and more detailed occupancy study (related to bkg events simulation).

11/03/2009 Claudia Cecchi Electronics First discussion between Rome1 and Perugia has started to study all the possible solutions for the readout and the electronics. First task readout and electronics for the BT, in parallel with the study and the design for the whole detector. Next/first “productive” meeting to prepare a to do list and a sharing of the tasks March 23 rd. Electronics for the BT will be CMS based, 25 channels available, power supply crate not available, range ADC has to be studied (saturation around 1.5 GeV).

11/03/2009 Claudia Cecchi Simulation Simulation of the EMC is well established and running. Different geometry have been investigated and others will be studied (see mechanics ad bkg studies ). Material in front of EMC has been simulated as a total amount of radiation length. Projective geometry is implemented in the simulation. Standalone G4 simulation is available for the BT Geometry of the EMC has been integrated as gdml description in the full simulation Missing: single particle shoot + background in the full simulation to study the occupancy (started)

TEST BEAM 11/03/2009 Claudia Cecchi 2 LSO crystals (already tested in the lab) will be tested at BTF first week of April (PMT, APD) and in June. TB with 25 crystals: - BTF end of MeV + tagged photons - CERN first half of 2010 up to 3.5 GeV Procurement of crystals: 8 pcs ordered in St. Gobain in 2008 (4.9 Keuro/pc T.V.A. not included) will be produced as soon as we give them final dimensions (in discussion with D.H.), 17 crystals missing, part from INFN part from USA. Mechanical structure: 32Keuro assigned to Perugia in 2009 Electronics: will use CMS, plus what has to be redone/adjusted according to our needs (under study)

Institutions involved in the EMC project BergenBackward EMC CaltechForward EMC (calibration, DG optimization, DAQ, crystals) PerugiaForward EMC (mechanics, electronics, simulation analysis) Roma1Electronics Barrel + forward Queen Mary, London

11/03/2009 Claudia Cecchi Perugia - people C. Cecchi30% P. Lubrano30% E. Manoni100% A.Rossi100 % (S. Germani)(50%) + officina meccanica ed elettronica + ingegnere elettronico (da confermare) 3.1 FTE

11/03/2009 Claudia Cecchi Perugia – richieste (consumo, MI e ME vedi tabella generale Forti) Sblocco di 59Keuro SJ (acquisto cristalli + realizzazione preamplificatori) Lo sblocco è SJ alla partecipazione economica da parte degli USA. In attesa di una risposta, auspicabile che arrivasse entro 30 Marzo. Item che potrebbe prevedere una partecipazione di finanziamento con i fondi della regione per R&D. Deadline per ordine cristalli inizio Giugno. MI: 2 riunioni italiane 3 persone TB BTF (Aprile, Giugno, fine anno) 3 persone 1 settiman ogni TB collaborazione con Roma ME: workshop fisica 1 persona general meeting SLAC 2 persone Aprile – Giugno test 2 cristalli con PMT e APD (scheda senza circuito stampato), per Giugno sarà pronta una scheda di lettura degli APD e nuovi PD (già ordinati) su circuito stampato. Fine anno TB con matrice 5x5

Roma 1 – contributi Partecipazione ad IFR (storica) ad esaurimento –Studi di irraggiamento dei SiPM al Frascati Neutron Generator dell’ENEA Partecipazione ad EMC (in stretta collaborazione con PG) –Design meccanica (Ing. Meccanico) –design elettronica barrel+endcap(Tecnologo Elettronico + officina elettronica). Con particolare focus sull’integrazione nel DAQ –Setup readout ed elettronica per il TB Si prevede di utilizzare 25 canali di APD di CMS –Manca crate per alimentazione e range dinamico ADC non appropriato –Necessita’ di stabilizzare in temperatura In alternativa un sistema a fotodiodi andrebbe attrezzato ex- novo 11/03/2009 Claudia Cecchi

Roma1 – finanziamenti (solo consumi come sopra) 11/03/2009 Schede valutazione elettronica per design DAQ (Xilinx): –Link ottici 2.5K –ADC 2.5K Elettronica 25 canali TB ad LNF (fine anno) –Use pin-diodes reusing L3 pre-amps pin diodes for 25 channels 3KEuro Schedine per preamp 3KEuro –Varie TB: meccanica e guide di luce 3KEuro