LUNA
The Ne-Na Cycle 22 Ne(p, g ) 23 Na Q=8.8 MeV Only upper limits (μeV) on the strength of the 14 possible resonances below 400 keV (factor 2000 on the rate) Ne, Na, Mg and Al yield in AGB and Novae (up to a factor 100) The strength of 6 resonances measured in the first 3 months of the experiment with a neV sensitivity Tesi dottorato R. Depalo+ tesi specialistica A. Slemmer
BBN D(α, g ) 6 Li Q=1.47 MeV Possible nuclear explanation of the 6 Li problem? M.Anders, D.Trezzi, R.Menegazzo et al., “First Direct Measurement of the Cross Section D(α, g ) 6 Li at Big Bang Energies and the Primordial Lithium Problem”, accepted by PRL A.Di Leva, D.Scott, A.Caciolli et al., “Underground study of the 17 O(p, g ) 18 F reaction relevant for explosive hydrogen burning”, PRC A.Formicola, C.Bruno, A.Caciolli et al., “Cross-section measurements at astrophysically relevant energies: The LUNA experiment”, NIM A742, 258 Articoli in preparazione: 22 Ne(p, g ) 23 Na, EPJA topical issue on underground physics (Borexino+Luna), editors: CB+2 guest editors
Misure per completare proposal in corso: 18 O(p, ) 19 F 18 O(p, ) 15 N 22 Ne(p, ) 23 Na, BGO set-up 23 Na(p, ) 24 Mg LUNA 400 kV new program , a bridge toward LUNA MV: 13 C( ,n) 16 O – neutron source (LUNA MV) 12 C(p, ) 13 N and 13 C(p, ) 14 N – relative abundance of 12 C- 13 C in the deepest layers of H- rich envelopes of any star 2 H(p, ) 3 He – 2 H abundance in BBN 22 Ne( , ) 26 Mg – competes with 22 Ne( ,n) 25 Mg neutron source (LUNA MV) 6 Li(p, ) 7 Be – improves the knowledge of 3 He( , ) 7 Be key reaction of p-p chain
Astrofisica * Astro-10B: 10 B(α,n) 7 e CN, interesse x combustibili nucleari e prima misura con gruppo Catania (Trojan Horse), assegno universitario senior di A.Caciolli * CARTA (Carbon Target): per determinare purezza in 13 C ottenibile in bersagli di Carbonio (Luna-MV)
Gruppo Padova : C. Broggini 80%, R. Depalo 100%, R. Menegazzo 40% 2.2 FTE (Caciolli associato LNL) Missioni: 24.5 kE commissioning al Gran Sasso+turni misura, meetings+gruppi di lavoro+LUNA-MV, misure ancillari a Legnaro e Caserta Inventariabile: kE PC per sviluppo DAQ, HV per HpGe, impulsatore random, 3 rivelatori Silicio, pompa da vuoto Consumo: kE camera scattering, passante movimentazione rivelatori, materiale bersagli, cavi e passanti HV, attrezzatura lab. Totale: 77.2 kE Elettronica: 1 m.u., Meccanica: 2 m.u., Progettazione: 1 m.u.
7 LUNA site LUNA 1 ( ) 50 kV LUNA 2 (2000 – …) LUNA MV (approved) U terminal = 350 – 3500kV I max = 500 A (on target) E = 0.7keV Allowed beams: H +, 4 He LUNA-MV U terminal = 50 – 400kV I max = 500 A (on target) E = 0.07keV Allowed beams: H +, 4 He, ( 3 He) South side of Hall C: definitely assessed in early 2014
15/05/2014 presentazione M. Junker al MAC : ok dei referees Rifuggiato e Bisoffi. Verbale trasmesso alla Giunta 13/06/2014 Da avvio gara per acceleratore ad acceleratore LUNA MV funzionante in sala C: 39 mesi Preparazione sito: 12 mesi Ottenimento nulla osta Prefettura: mesi Previsione smontaggio OPERA: area libera a dicembre 2016 Da luglio 2014: S. Gazzana ingegnere nucleare con esperienza nel coordinamento cantieri e sicurezza (GLIMOS) per seguire anche lo smontaggio di OPERA