C.Agodi, D.Calvo, A.Di Ciaccio, P.Iaselli, S.Pirrone

Slides:



Advertisements
Presentazioni simili
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Advertisements

REFEREE ALICE C.Agodi, D.Calvo, A.Di Ciaccio, P.Iaselli, S.Pirrone CSN3 – Roma, 18-giugno 2013.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
EPSI Relazione dei referee Maria Curatolo Anna Di Ciaccio Valerio Vercesi CSN1 - Assisi Settembre 2004.
3 febbraio 2003Commissione Scientifica Nazionale I 1 Anna Di Ciaccio NA48 /2 :Relazione dei referees Commissione Scientifica Nazionale I LNF 3-4 febbraio.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
1 referee-BaBar CSN I, LNF giugno 2007 RELAZIONE DEI REFEREE DI BaBar M.De Palma, C.Luci, C.Troncon, B.Gobbo(calcolo) 26 giugno 2007.
ATLAS e CMS Relazione dei referees A. Cardini, M. Grassi, G. Passaleva, A. Passeri, V.Vagnoni.
ATLAS Relazione dei referees A. Cardini, M. Grassi, D. Lucchesi, G. Passaleva, A. Passeri.
Referee ALICE C. Agodi, D. Calvo, L. Gialanella, P. Iaselli, S. Pirrone CSN3 – Cagliari - settembre 2015.
TOTEM referee report C.Bini, M.Rescigno, A.Tricomi Torino – 27 settembre /09/20121C.Bini - TOTEM referee report.
Referee ALICE C.Agodi, D.Calvo, A.Di Ciaccio, P.Iaselli, S.Pirrone CSN3 – Torino, 17 - settembre 2013.
TOTEM: rapporto dei referee C.Bini, M.Curatolo, P.Paolucci 21 settembre 2007.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
CSN5 meetingCatania luglio 2014 Referees: Giovanni Bisoffi LNL, Andrea Ghigo LNF, Danilo Rifuggiato LNS MAGIX.
CSN1 - CMS Referee Report P.Giannettii - INFN / Pisa Ferrara, 20 maggio 2007 CMS - Relazione dei Referee G. Bruni, A. Cardini, P. Giannetti, M. Grassi,
Riunione del CSN3 Roma settembre 2012 a cura di C.Agodi e D. Di Bari.
ATLAS / CMS M.Grassi, S.Miscetti, A.Passeri, D.Pinci, V.Vagnoni.
CSN1 - Ferrara 14/09/2009 P-SuperB proposte finanziarie Referee: M. de Palma, B.Gobbo, C. Luci, D.Pedrini, C.Troncon.
Sommario richieste CSN1 Consiglio di Sezione 28/06/2013 Attilio Andreazza.
COMPASS Relazione dei referee P. Cenci P. Branchini M. Sozzi.
TOTEM referee C.Bini, P.Paolucci, A.Tricomi. Considerazioni generali - I 2011 anno molto positivo per TOTEM: – fine installazione rivelatore – primi risultati.
Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie (aggiornamenti) Domenico Elia Riunione Referee Calcolo LHC / Bologna, Riunione con.
Riunione CSN1, Roma, Gennaio 2013F. Bedeschi, INFN-Pisa 1 Riunione CSN1  Comunicazioni  Consuntivi 2012  Premiali  PRIN/FIRB  Sblocchi SJ  Progetti.
Riunione CSN1, Torino, Settembre 2012F. Bedeschi, INFN-Pisa 1 Riunione CSN1  Comunicazioni  Bilancio 2011  Bilancio 2012 F. Bedeschi Torino, Settembre.
Michele Iacovacci (Napoli),
Dotazioni Gruppo 1 Milano, 11 luglio 2017
CMS – Relazione dei referee su MOFA, Similfellow e Milestones
Riunione ALICE Italia - Referee stato e richieste finanziarie
Report dei referee sulle richieste di OPERA referees: S. Bottai, B
ATLAS – CMS – RD-FAS2 Sblocchi e nuove richieste
MEG Relazione dei referee
M.Biasini, P. Checchia 23 Settembre Riunione CSN1
Elezione Responsabile Nazionale ATLAS
INFN-ITSupgrade meeting CERN, 13 Novembre 2013
C.Bini, P.Paolucci, A.Tricomi 18/09/2008
Riunione marzo Presidenza INFN- Roma 19/03/2012.
Introduzione : MEG + MEG 2
Richieste 2017 HMPID e LHC_IF
Considerazioni generali
Riunione giugno Roma 18/3/2013.
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
Attivita’ gruppo GE sul top
Gagliardi Università degli Studi e INFN Torino
Top status and plans Note sul top per le winter conferences (drafts e non): Measurement of top quark pair production cross-section in dileptons; Search.
Comunicazioni Riunione ATLAS-Italia
Riunione con i Referee Settembre 2016
Analisi dei dati dell’Esperimento ALICE
ALICE CALCOLO richieste finanziarie e proposte di assegnazione 2017
Resoconto CSN1 – Settembre 2015
relazione referee settembre 2009 p. branchini, s.ragazzi, m.sozzi
LHCB : proposte dei referees
IL CALCOLO DI ALICE IN ITALIA
Riunione CSN1: comunicazioni Roma 19 settembre 2016
KLOE: referee* Stato dell’arte (da Aprile ad oggi)
TOTEM: rapporto dei referee
Responsabile locale: F. Ferro
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Tesi di Laurea e di Dottorato
ATLAS Relazione dei referees
Sommario Riunione CSN1 Bilancio 2011 Bilancio 2012 Questioni aperte
SuperB – Richieste Sblocchi 2008
SuperB Richieste 2010 Francesco Forti Università e INFN, Pisa
C. Bini, P. Paolucci, A. Tricomi
Physics: Produzione risonante di ZV in ll+jets
Report dei referee di Kloe
RD_FA / Pisa Preventivi 2020
Transcript della presentazione:

C.Agodi, D.Calvo, A.Di Ciaccio, P.Iaselli, S.Pirrone REFEREE ALICE C.Agodi, D.Calvo, A.Di Ciaccio, P.Iaselli, S.Pirrone CSN3 – Roma, 18-giugno 2013

Status esperimento I referees si congratulano con la collaborazione ALICE per il raggiungimento di tutti gli obiettivi di fisica che si erano proposti. In particolare, il collegio dei referee esprime soddisfazione per i lavori pubblicati, sia sulla fisica pp che sulla fisica Pb-Pb nel corso del primo semestre del 2013: D meson elliptic flow in non-central Pb-Pb collisions at sqrts(s_NN) = 2.76TeV  ALICE Collaboration (B. Abelev (LLNL, Livermore) et al.). May 13, 2013. 17 pp.  CERN-PH-EP-2013-085  e-Print: arXiv:1305.2707  Mid-rapidity anti-baryon to baryon ratios in pp collisions at s√ = 0.9, 2.76 and 7 TeV measured by ALICE  ALICE Collaboration (E. Abbas (Cairo, Acad. Sci. Res. Tech.) et al.). May 7, 2013. 33 pp.  CERN-PH-EP-2013-080  e-Print: arXiv:1305.1562  Charmonium and e+e− pair photoproduction at mid-rapidity in ultra-peripheral Pb-Pb collisions at sNN−−−−√ = 2.76 TeV  ALICE Collaboration (E. Abbas (Cairo, Acad. Sci. Res. Tech.) et al.). May 7, 2013. 26 pp.  CERN-PH-EP-2013-066  e-Print: arXiv:1305.1467  Centrality dependence of the pseudorapidity density distribution for charged particles in Pb-Pb collisions at sqrt(sNN) = 2.76 TeV  ALICE Collaboration (Ehab Abbas (Cairo, Acad. Sci. Res. Tech.) et al.). Apr 1, 2013. 21 pp.  CERN-PH-EP-2013-045  e-Print: arXiv:1304.0347  J/ψ Elliptic Flow in Pb-Pb Collisions at sNN−−−−√=2.76 TeV  ALICE Collaboration (Ehab Abbas (Cairo, Acad. Sci. Res. Tech.) et al.). Mar 23, 2013. 16 pp.  CERN-PH-EP-2013-042  e-Print: arXiv:1303.5880  Centrality dependence of π, K, p production in Pb-Pb collisions at sNN−−−−√ = 2.76 TeV  ALICE Collaboration (Betty Abelev (LLNL, Livermore) et al.). Mar 4, 2013. 42 pp.  CERN-PH-EP-2013-019  e-Print: arXiv:1303.0737  Centrality determination of Pb-Pb collisions at sqrt(sNN) = 2.76 TeV with ALICE  ALICE Collaboration (Betty Abelev (LLNL, Livermore) et al.). Jan 18, 2013. 37 pp.  CERN-PH-EP-2012-368  e-Print: arXiv:1301.4361  Charge correlations using the balance function in Pb-Pb collisions at sqrt{s_{NN}} = 2.76 TeV  ALICE Collaboration (Betty Abelev (LLNL, Livermore) et al.). Jan 2013. 37 pp.  Published in Phys.Lett. B723 (2013) 267-279  CERN-PH-EP-2012-371  DOI: 10.1016/j.physletb.2013.05.039  e-Print: arXiv:1301.3756  Measurement of the inclusive differential jet cross section in pp collisions at s√=2.76 TeV  ALICE Collaboration (B. Abelev (LLNL, Livermore) et al.). Jan 2013. 17 pp.  Published in Phys.Lett. B722 (2013) 262-272  CERN-PH-EP-2012-301  DOI: 10.1016/j.physletb.2013.04.026  e-Print: arXiv:1301.3475 

Upgrade Per essere pronta a sfruttare al meglio le possibilità offerte dall’acceleratore LHC, la collaborazione ALICE ha iniziato uno studio di Upgrade che permetterà all’esperimento di migliorare le misure di Heavy-Flavours , di leptoni termici, di charmonio, delle proprietà dei jets, grazie all’alta statistica e a misure di precisione. ALICE Upgrade Il goal finale è di poter raccogliere dati a 50 KHz ( contro i 500 Hz attuali) con una capacità di trigger basata su una ricostruzione quasi online degli eventi. => necessari nuovo readout, nuovo DAQ Migliorare la capacità del vertice e del tracciamento => necessario un nuovo Inner Tracker In questo quadro, la L.o.I. di ALICE per l'upgrade 2018 e' stata Approvata dall’ LHCC a settembre 2012 Approvata dal Research Board a novembre 2012 : ”The Research Board approved the upgrade of ALICE for the physics case that has been made in the LoI, based on up to 10 nb-1 of data taken with lead ions, implying that the experiment will continue to run beyond 2018. The CERN accelerator departments should assess the feasibility of delivering the requested integrated luminosity.” NUPECC ha sottomesso un documento a Cracovia, dove sottolinea : “Stresses the commitment of the Nuclear Physics Community to the ALICE long term programs: top priority for European Nuclear Physics” Cracovia European Strategy Meeting “Heavy Ion Physics an integral part of the future LHC program till at least the mid 2020s”

Upgrade dell’Inner Tracking System L’upgrade dell’ITS è parte di una strategia di upgrade generale del Central Barrel in cui i gruppi INFN si candidano a svolgere un ruolo primario, in continuità con quanto fatto nell’attuale ITS. I Referee sottolineano il buon lavoro fatto da ALICE nella proposta di Upgrade, l’evidente stato di avanzamento dell’R&D e la forte e qualificata presenza italiana. I Referee supportano le motivazioni di fisica e gli scopi dell’Upgrade, raccomandando la preparazione del Technical Design Report entro la fine del 2013 ed auspicano, pertanto, l’approvazione scientifica da parte di tutta la CSN3.

Richieste finanziarie ALICE giugno - 2013 Sblocchi s.j. Richiesta Proposta Ba Missioni da s.j. Bo 15 k€ 10 k€ Bo Consumo da s.j. (congelato) 80 k€ (similfelow) 80 k€ Si finanziano gli spostamenti legati a ITS –UP, manutenzione straordinaria HMPID e ALICE week (Cina). Non si finanzia la richiesta di 6 conferenze, suggerendo di ricorrere alle dotazioni e rimandando la decisione alla commissione. Si suggerisce per il nuovo responsabile del calcolo, di utilizzare i fondi già assegnati al responsabile precedente. Viene accolta la richiesta degli blocchi s.j. sull’HMPID a Bari per gli interventi sull’elettronica di readout. Si fa eccezione per il portatile (per il software QUARTUS ), per cui si suggerisce di ricorrere alle dotazioni. Restituzioni Bo Consumo Residuo MoA 45.0k€ Ba Consumo Residuo da s.j.HMPID 20.0k€ LNF Inventario VHMPID 9.5k€

Richieste finanziarie suppletive ALICE- 2013 ITS Upgrade Le richieste finanziarie suppletive ALICE- 2013 per l’ ITS Upgrade sono finalizzate agli studi di fattibilità che consentano di individuare, entro la fine dell’anno, le soluzioni tecniche più adeguate. Di seguito sono illustrate le richieste della collaborazione e le proposte dei Referee.

Richieste finanziarie suppletive ALICE- 2013 ITS Upgrade Per tali richieste i Referee hanno seguito la logica seguente: 1) confermare i finanziamenti, a parte piccoli arrotondamenti, alle sedi pilota (Bari, Torino e Trieste); 2) mettere in stand by le altri sedi minori che comunque possono usufruire di risorse 2013 già allocate all'upgrade e non utilizzate. 3) dare un segnale a Frascati e assegnare i 5 kE richiesti per il sistema di test. Il finanziamento per l'infrastruttura è stato cancellato, come richiesto, in attesa delle decisioni ufficiali dei LNF.

ITS UPGRADE straordinarie 2013 ALICE RICHIESTA 200 K€ I Referee concordano per una PROPOSTA : 173 K€ Si suggerisce di concentrare il lavoro in poche sedi (test) e in caso di difficoltà economica in CSN3 di dividere il finanziamento dell’engineering run (BA consumo) tra giugno e settembre. 2 12 173

Sommario Il collegio dei Referee propone, pertanto, alla Commissione di dare parere favorevole per il proseguimento dell'R&D dell’ITS finalizzato alla produzione del modulo 0 con circa 170 K€ sul bilancio 2013, compatibilmente con le risorse reperibili tra giugno e settembre. Inoltre i Referee propongono che la Commissione dia un'approvazione scientifica all'impegno ALICE - INFN nell'upgrade, auspicando un’approvazione per un impegno economico che verrà concordato, al più presto, di concerto con la Giunta INFN.