MPGD_NEXT Miscellanea: MILESTONES 2016 & 2017 SBLOCCO S.J. LIVELLO DI FINANZIAMENTO E SINERGIE 23/3/2017 MPGD_NEXT meeting SILVIA DALLA TORRE
MILESTONES 2016 31-12-2016 The Resistive-WELL detector: Small-size prototype of resistive segmented uRWELL, built and qualified PROPOSED 100% 31-12-2016 Fully resistive pattern detectors: measurements of the electrical transparency in 2 and 4 layer prototypes PROPOSED 100% 31-12-2016 High-gain hybrid MPGD: article about the detailed studies of the discharges and their propagation in the hybrid MPGD architecture submitted for publication PROPOSED: studies completed, paper being written: 50% 31-12-2016 MPGD-dedicated HV system: selection of FPGA and HV DC-to-DC converters based on the propedeutic studies PROPOSED: 100% 31-12-2016 FE developments for high space and time resolution MPGD: validation of full analog blocks with post-layout simulation of new FEE PROPOSED 100% 31-12-2016 High performance MICROMEGAS: Construction and extensive Tests of the first small microPad MM prototype PROPOSED 100% 23/3/2017 MPGD_NEXT meeting SILVIA DALLA TORRE
MILESTONES 2017 30-09-2017 Small-size prototypes with HIGH GAIN and bi-dimensional (pad) readout for HIGH RATE, built, tested and fully and qualified (task 1) 30-06-2017 Realization of prototypes for studies on the detector gain as a function of the resistivity of the sheets and the number of gaps and the detail of the cells (task 2). 31-12-2017 Test dei prototipi e studio del gain del detector in funzione di vari parametri (task 2). Design, Construction, and first test of MICROMEGAS with Embedded Readout Electronics (task 3) Disegno, costruzione e primo test di MICROMEGAS con nuova configurazione e layout resistivo (task 3) Construction and test of an improved version of resistive MICROMEGAS by discrete elements (task 4) Test del primo prototipo di FE electronics (task 5) Test della prima versione del chip di FE per misure di timing sul prototipo di fully resistive pattern detector Revision design based on the results of test of FEE coupled to the detectors (task 5). Revision design based on the results of FEE coupled to the detector with cosmics and test beam Realization and test of a first 10-channel prototype of the HV system (task 6) Realization and test of a first 1-channel prototype of the HV system, with design expandable to a multichannel system (task 6). 23/3/2017 MPGD_NEXT meeting SILVIA DALLA TORRE
s.j. MISSIONI Reminder Test beam schedulati: 5 keuro “Il SJ e' per i vari Test Beam, condizionato alla presentazione del calendario approvato dei test.» Test beam schedulati: Task 1, uR-WELL: PSI 19/6-2/7/2017 Task 3, High performance MICROMEGAS: CERN, H4, 7-19/7/2017 (RD51 common test beam) 23/3/2017 MPGD_NEXT meeting SILVIA DALLA TORRE
µ-RWELL: PSI test beam (sblocco s.j.) G. Bencivenni, LNF-INFN
Periodo test Beam Time request for test of new MPGD Dear Gianni, Mittente Ritt Stefan (PSI) Destinatario Giovanni Bencivenni Cc Deiters Konrad (PSI) Data 2017-01-30 17:01 Dear Gianni, I confirm the dates June 19th (Mon) to July 2nd(Sun). Best regards, Stefan
Obiettivo del test Test di alta rate: al PSI (M1 – line) si riesce ad arrivare a flussi di circa 20 MHz/cm2 su spot dell’ordine di 15-20 cm2 (precedente esperienza personale con GEM nel 2004). Misure: rate capability per versione u-RWELL doppio layer e, se possibile, test nuova versione alta rate semplificata spark rate integrazione di carica a livello di circa 1-2 anni di funzionamento in ambiente alta rate (1 MHz/cm2); test importante sopratutto per possibili effetti di ageing del DLC
Prototipi per test beam n. 2 u-RWELL doppio layer DLC (versione standard alta rata) n. 1 u-RWELL versione alta rate semplificata (nuova idea per superare difficolta di ingegnerizzazione doppio-layer) n. 1 u-RWELL single layer DLC (bassa rate) n. 1 triple-GEM (pad readout) per misura intensità del fascio ad alti flussi n. 2/3 scintillatori per misura intensità fascio a bassi flussi Tutti I detectors saranno letti in “current mode” (tranne scintillatori)
Richiesta Sblocco s.j. Il test al PSI ha un costo per (minimo) 4 pp per 14 gg di circa 10 k€ (stimando 1k€ di costo voli – servirebbe poi avere qualcosa dell’ordine di 2k€ per spedizione materiale e/o mezzo a noleggio) La Commissione-5 aveva finanziato questo item con 4 k€ s.j. di cui si richiede sblocco Ovviamente ci stiamo attivando a cercare la differenza (8 k€) altrove (c’è forse una possibilità di avere un aiuto dalla Commissione-1 nel framework di RD_FA).
TEST BEAM al CERN (task3) 23/3/2017 MPGD_NEXT meeting SILVIA DALLA TORRE
TEST BEAM al CERN (task2) Fri 7th of July and it will end on Wed 19th of July 23/3/2017 MPGD_NEXT meeting SILVIA DALLA TORRE
SINERGIE, LIVELLO DI FINANZIAMENTO Tutti i task con RD51 (networking culturale e infrastrutture) Task 1,2, 5 con CMS (finanziamento large size e ingegnerizzazione) Task 1, 5 con LHCb, RD_FA (finanziamento RD_FA per studi ingegnerizzazione high rate) Task 4 con COMPASS Task 4, 6 con RD_FA Task 3 con ATLAS per LHC HI-LU Task 1,4 con AIDA-2020 (supporto per manpower) Difficolta’ con l’attuale livello di finanziamento nei seguenti aspetti Missioni in generale, per test beam in modo particolare Mancanza finanziamenti task 2 Per iterazione prototipi chip 23/3/2017 MPGD_NEXT meeting SILVIA DALLA TORRE