STATO CMS: ATTENDE (LHC)

Slides:



Advertisements
Presentazioni simili
GuidoTonelli/Università di Pisa ed INFN/Gruppo1/Roma Cosa contengono Stime/richieste per il 2003 suddivise per sub-detector Criteri di suddivisione.
Advertisements

Stato dell’esperimento CMS 2008
R&D muoni. Stato dell’arte Il gruppo ha appena cominciato il lavoro – Prospettiva: preparazione workshop Definizione temi del workshop Analisi stato dell’arte.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
Preparazione RRB Commissione Scientifica Nazionale I 1-2 aprile 2003 S. Patricelli Consuntivo fondi M&O 2002 Divisione tra subdetectors dei fondi extra-CORE.
LHCb – RRB aprile 2006 MoF-A (previsioni 2007) MoF-B Stato finanziario dell’esperimento Stato dei finanziamenti INFN e necessita’ CSN1 – 4 aprile.
GuidoTonelli /Gruppo1/Roma/16Maggio RRB20 Stime preliminari per il budget di costruzione del Piano finanziario. M&O-A e B Stime.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
25 giugno 02S. Patricelli - CSN1 - Frascati1 zCosa coprono i MOF-B per ATLAS zCriteri di suddivisione tra le Funding Agencies zCome si gestiscono zQuote.
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
Presentazione documenti inviati al RRB e piani futuri Commissione Scientifica Nazionale I 13 ottobre 2003 S. Patricelli Punti principali in discussione.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Referees di ATLAS-CMS: commenti sulle attività di upgrade M.Grassi S.Miscetti A.Passeri D.Pinci V.Vagnoni Sulla base di quanto presentato nell’incontro.
ATLAS Relazione dei referees A. Cardini, M. Grassi, D. Lucchesi, G. Passaleva, A. Passeri.
CSN1 Pisa M. Diemoz LO STATO DI CMS Settembre 2008 Era più bello prima!...
CSN1 - CMS Referee Report P.Giannettii - INFN / Pisa Ferrara, 20 maggio 2007 CMS - Relazione dei Referee A. Cardini, G. Darbo, P. Giannetti, P. Lubrano,
REF CMS Roma M. Diemoz CMS ATTENDE (LHC).
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
CSN1 - CMS Referee Report P.Giannettii - INFN / Pisa Ferrara, 20 maggio 2007 CMS - Relazione dei Referee G. Bruni, A. Cardini, P. Giannetti, M. Grassi,
Riunione del CSN3 Roma settembre 2012 a cura di C.Agodi e D. Di Bari.
Introduzione al Workshop di Fisica ATLAS Italia M. Cobal, S. Giagu Università di Udine e INFN, Università di Roma I e INFN Napoli, Maggio 2011.
Comunicazioni ATLAS Italia Bologna 6/5/2010 Similfellow – 2010 II Conferenze (SIF e IFAE) Telefoni CERN CSN1 (Torino e riunione referee) Info Sestri Levante.
Piano finanziario 2010 e incontro con i referee 6/17/20091L. Rossi – Bologna – ATLAS Italia.
TOTEM referee C.Bini, P.Paolucci, A.Tricomi. Considerazioni generali - I 2011 anno molto positivo per TOTEM: – fine installazione rivelatore – primi risultati.
Riunione CSN1, Roma, Aprile 2011F. Bedeschi, INFN-Pisa 1 CMS Upgrades Relazione referees  Commenti generali  Proposte dettagliate:  Pixels  RPC  DT.
Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie (aggiornamenti) Domenico Elia Riunione Referee Calcolo LHC / Bologna, Riunione con.
Michele Iacovacci (Napoli),
CMS – Relazione dei referee su MOFA, Similfellow e Milestones
Lepton Flavour MEG A. Baldini CSN1 22 Nov. 2011: GGI.
Indagine preliminare similfellow
MEG Relazione dei referee
Elezione Responsabile Nazionale ATLAS
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
LHCB : proposte dei referees
Calorimetro LAr F. Tartarelli Incontro con i referee, Roma, 07/09/2016.
Gagliardi Università degli Studi e INFN Torino
Top status and plans Note sul top per le winter conferences (drafts e non): Measurement of top quark pair production cross-section in dileptons; Search.
Daniele Pedrini INFN Milano-Bicocca
Comunicazioni Riunione ATLAS-Italia
LO STATO DI CMS CMS-Padova M. Diemoz.
Analisi dei dati dell’Esperimento ALICE
CMS - Relazione dei Referee
LHCB : proposte dei referees
Gigi Cosentino - LNL 20 ottobre 2016
IV Physics workshop ATLAS Italia
CMS Relazione dei referees
Stato del rivelatore di Mu Gruppo 1 – Pisa – Settembre 2008
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
Accelerator Disision March 3rd 2015
LHCb: Stato del Rivelatore di Muoni
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
L. Rossi – CERN – ATLAS Italia
Atlas Milano Giugno 2008.
STATO DI CMS Bari M. Diemoz.
Dr. Pierluigi Paolucci - INFN di Napoli
Dr. Pierluigi Paolucci - INFN di Napoli
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
Physics: Produzione risonante di ZV in ll+jets
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

STATO CMS: ATTENDE (LHC) Ferrara 16-09-09 M. Diemoz

CRAFT 08 25 articoli in via di pubblicazione (prima della partenza di LHC)! Test dell’efficienza del meccanismo di pubblicazione 9/25 editor sono INFN! Ferrara 16-09-09 M. Diemoz

UN RISULTATO TRA TANTI dE/dx torna la scala assoluta, intercalibrazione ok O(1%) Ferrara 16-09-09 M. Diemoz

CRAFT 09 320 Mtriggers B=3.8T 160 Mtriggers B=0T 23Lug- 31Ago, tutti dentro: Migliorare controlli ed efficienza 320 Mtriggers B=3.8T 160 Mtriggers B=0T Ferrara 16-09-09 M. Diemoz

CRAFT 09 Ferrara 16-09-09 M. Diemoz

Efficienza operativa Interruzione dei servizi Da migliorare nei prossimi mesi Interruzione dei servizi Efficiency % Ferrara 16-09-09 M. Diemoz

TK-CRAFT 09 1. Before CRAFT 2. Performance during CRAFT Completed refurbishment of cooling plants by mid June - work stably and leak tight. 2/180 cooling loops leaky along the way/inside Tracker Tracker recommissioned mid June - mid July Sub detectors are well synchronized Tracker tuned in deconvolution mode for first time. 2. Performance during CRAFT Stable - 98% of Tracker alive during CRAFT 100KHz trigger readout tested successfully. ~ 9 M muon Tracks collected (in Peak and Deconvolution) S/N as expected and stable during CRAFT. Very clean events. HV trips affected ~ 0.5% of Tracker last days of CRAFT – investigating. 3. To do between now and beam Consolidate Cooling System - Recover part of disconnected channels - Assess HV channel trips Ferrara 16-09-09 M. Diemoz

TK-CRAFT 09 Deconvolution readout mode (needed to for 25 ns bunch spacing and to deal with pile-up) commissioned Ferrara 16-09-09 M. Diemoz

TK-CRAFT 09 Ferrara 16-09-09 M. Diemoz

PIXEL CRAFT 09 Stable detector status: 99% for BPix 97% for FPix. No major problems. Collected 300M events Ongoing offline analyses: - hit efficiency, resolution - comparison with MC, - Lorentz angle calibration - time scan. Ferrara 16-09-09 M. Diemoz

TK-alignment CRAFT 09 Alignment in deconvolution Ferrara 16-09-09 M. Diemoz

ECAL CRAFT 09 Stabilità in temperatura Ferrara 16-09-09 M. Diemoz

ECAL CRAFT 09 Monitor della trasparenza stabile a meglio di 0.1% LED load test on EE- Data from a 300 h sequence RMS (APD/PN) (RMS) VPt/PN % Calibration sequence (laser & test pulse) run stably over CRAFT 09 Good data quality Stability measured with blue laser <0.1% Ferrara 16-09-09 M. Diemoz

RPC CRAFT 09 CRAFT-09 CRAFT-08 CRAFT08 Run 67647 9.3kV 230mV Swapped Cables were corrected Few Single Gap Chambers Better Syncronization CRAFT-08 CRAFT-09 Ferrara 16-09-09 M. Diemoz

RPC Radiography Improved statistics allows to have high resolution muongraphy CRAFT-08 CRAFT-09 RPC status Ferrara 16-09-09 M. Diemoz

DT CRAFT 09 CRAFT08 & 09 possibili grazie alla CRAFT08/09 data show the detector has the expected performance The detector runs very stably and efficiently; the on-line and off-line are performing well; the DQM data certification mechanism is reliable The detector control and safety systems have been expanded and strengthened No major concerns CRAFT08 & 09 possibili grazie alla readiness e all’organizzazione delle DT. Campagne cruciali per mettere a punto tutti i rivelatori di CMS! Ferrara 16-09-09 M. Diemoz

DTTF CRAFT 09 For part of the run the DT system was configured with LHC timing and bottom only sectors in the trigger and the DTTF (DT Track Finder) with R-phi pointing LUTs. accumulated 4.2M events with DT bottom only trigger and 8.6M with DT + RPC bottom trigger. R(cm) of closest approach vs Z(cm) OPEN LUTs – high quality tracks R(cm) of closest approach vs Z(cm) CLOSED LUTs – high quality tracks Ferrara 16-09-09 M. Diemoz

DTTF CRAFT 09 Ferrara 16-09-09 M. Diemoz

MoA - Servizi Il rivelatore è costruito, bisogna farlo funzionare e mantenerlo nel tempo: CMS chiede ad ogni firmatario 3 mesi di servizio all’anno (contato sull’Istituzione). 2009 per aggiustare. Es. Roma (ECAL+SW/COMP): 12 autori 36 mesi di servizio dovuti 39 mesi offerti date le responsabilità oggettive Breakdown dettagliato dei servizi e di chi li fa Bilanciamento tra servizio al CERN e a casa 2010 INFN 735 mu di servizi 63% al CERN Ferrara 16-09-09 M. Diemoz

Servizi MoA Ferrara 16-09-09 M. Diemoz

Servizi MoA Da fogli excel a DB, molto più gestibile! Richieste basate su questo sistema Ferrara 16-09-09 M. Diemoz

Prepararsi per l’analisi: azioni Gruppo per il Coordinamento dell’Analisi: favorire l'inserimento di chiunque voglia fare analisi (giovani e non) nei gruppi di fisica di CMS dando suggerimenti per una partecipazione utile, efficiente e coerente con l'attività di chi già lavora. seguire l’ attività dei similfellow in modo che questa sia utile a tutta la comunità italiana che fa analisi. armonizzare e filtrare gli abstract per la SIF organizzare i reharsal per i talk importanti a livello italiano (plenari SIF, IFAE, CSN1) organizzi il programma dei due workshop annuali CMS fisica/soft/comp sviluppi una serie di strumenti atti a valutare in modo oggettivo l'impatto della comunità italiana sull'analisi (es. % note CMS con nomi INFN, etc.) Ferrara 16-09-09 M. Diemoz

ANALISI Tools di monitor attività Ferrara 16-09-09 M. Diemoz

Attività INFN DPG DPG Perc. Coord. Ita ECAL 7/14 = 50% MUON DT 7/16 = 44% MUON RPC 6/13 = 46% TRACKER 5/16 = 31% Ferrara 16-09-09 M. Diemoz

Talks INFN in POG & PAG Una foto qualitativa delle attività nei gruppi di fisica nel periodo Dic ‘08- Giu ‘09 Ferrara 16-09-09 M. Diemoz

Articoli iniziali: contributo INFN CON AUTORE INFN TOTALE QCD 1 8 EWK 7 11 TOP 2 B-physics 4 SUSY EXOTICA 3 13 HIGGS 6 Forward physics 5 TOTALE 22 61 Ferrara 16-09-09 M. Diemoz

ANALISI L’idea è di coordinare la nostra presenza in modo che le aree chiave siano coperte, Es. analisi di scoperta con “pochi” pb-1 Es. Higgs dall’inizio Ferrara 16-09-09 M. Diemoz

SIMILFELLOWS Nel 2009 23 borsisti al CERN (13 borse terminate) Similfellow 2010: 14 titoli proposti L’insieme delle condizioni al contorno e la diminuzione degli assegni di ricerca disponibili renderà a breve questo meccanismo difficoltoso. Ferrara 16-09-09 M. Diemoz

TEMI BORSE CERN ASS. QCD EXO HIGGS 1 EWK TOP 9 DPG DT& POG mu DPG ECAL+ POG e/g 6 + 1 EXO + 1 EWK DPG RPC 3 + 2 EWK DPG TK+ B-tag 4 + 1 EWK HIGGS 1 EWK 9 EXO TOP QCD Ferrara 16-09-09 M. Diemoz

MOF-A TETTO CMS: 840keuro=1260kCHF (2008-2%, in kCHF era 1320) Liste accuratamente riviste nel 2008. Nel 2009: 185 firmatari (14.1%) 1473 kCHF 1241 kCHF cash contribution + computing in-kind TETTO CMS: 840keuro=1260kCHF (2008-2%, in kCHF era 1320) Nel 2010 (previsione SG): assumendo 14.1% (si rivede in questi giorni) 1452 kCHF cash contribution Siamo fuori di ~20 firme Tristemente possiamo solo sperare che la nostra % diminuisca, ma nei prossimi anni nemmeno questo basterà. Bisogna trovare una soluzione. Ferrara 16-09-09 M. Diemoz

FIRME & MOF-A Dal DB 2010: CMS ha 18 tecnologi > 70% In altri esperimenti LHC questa categoria è inclusa nel pagamento dei MOF-A e firma gli articoli di fisica. CMS dovrà adottare dei criteri di rotazione. La diversità di trattamento non è cosa accettabile, ha creato e crea seri problemi all’esperimento e richiede un intervento fermo del management INFN. Ferrara 16-09-09 M. Diemoz

STEP 1 + 2 + 3 Sui 6.6 MCHF richiesti da CMS nel 2006 A plan in three steps was proposed (Table 2 CERN-RRB-2006-105). The first priority is to complete the low luminosity detector (Step 1). For this 17.5 MCHF are to be committed in 2007. The second priority is to complete the DAQ (Step 2). For this 8.4 MCHF are needed. The third priority is to upgrade to design-luminosity detector (Step 3). The total sum needed is 16.6 MCHF. All the Funding Agencies were kindly invited to reach a rapid agreement on the first two steps. Sui 6.6 MCHF richiesti da CMS nel 2006 l’INFN ha dato 1MCHF a fine 2008 (1+2) dopo averne promessi (likely su 1+2) 2.5 Ferrara 16-09-09 M. Diemoz

Considerazione Siamo una parte portante dell’esperimento, grazie a noi funzionano tutti i rivelatori vitali per CMS: DT, RPC, ECAL, TRACKER Abbiamo un impatto importante sull’analisi, siamo pieni di giovani brillanti di grande qualità Abbiamo espresso lo Spokesperson che sarà in carica nei prossimi 2 anni importanti per la fisica NON POSSIAMO RIPIEGARE ORA Ferrara 16-09-09 M. Diemoz

CONCLUSIONE Il rivelatore è pronto Noi siamo pronti Speriamo che l’INFN sostenga lo sforzo messo in LHC in modo da raccogliere l’output scientifico per il quale abbiamo lavorato. Ferrara 16-09-09 M. Diemoz