Roma 2-4-2007S. Ragazzi Milano-Bicocca ECAL Aprile 2007.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

R P Rivelazione Acustica Particelle A bassa temperatura e in Superconduttori Sommario problematica e risultati Nautilus Attivita svolta Programma del prossimo.
CMS ECAL STATUS REPORT SCHEDULA PRODUZIONE CRISTALLI COSTRUZIONE MODULI NEI CR COSTRUZIONE SUPER MODULI ELETTRONICA E INTEGRAZIONE STATO IMPEGNI INFN.
G. Pugliese Bari, 20 May 2005 I rivelatori a Resistive Plate Chambers G. Pugliese per la Collaborazione CMS di Bari.
BRISCOLA GO ON AVANTI. Storia I giochi di carte hanno le origini più disparate e vengono collocati in differenti epoche, la Briscola risale al La.
Queuing or Waiting Line Models
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Distribuzione del numero di alleli condivisi da coppie di fratelli e di non-parenti tipizzati rispettivamente per 5, 9 e 13 markers.
Manufacturing and Technical Trainee Programme (MTTP)
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
Stato del progetto RPC Riunione Commissione I Roma 4/4/2006 R. Santonico.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
INSIDE UPDATES M. Giuseppina Bisogni PISA, 16/09/2014.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
Ontologia AA F. Orilia. Lez. 16 Discussione dell'approccio controfattualista di lewis condotta da Antonio De Grandis.
M. Diemoz – INFN Roma Catania 19 Settembre Gr I CMS ECAL STAUS REPORT Produzione Cristalli Produzione Moduli Produzione Supermoduli Stato Elettronica.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
GRI M. Diemoz - INFN Roma ECAL Maggio 2005.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
Metodi Quantitativi per Economia, Finanza e Management Lezioni n° 7-8.
Taccani1 7.4 Identification ANALISI DEI PERICOLI Hazard Analysis Identificazione Valutazione Misure di Controllo Control Measures Assessment.
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
Nicolo` Cartiglia Stato dell'elettronica di ECAL - La situazione e' in continua evoluzione. Entro l'estate si formalizzera` la decisione su quale elettronica.
GRI M. Diemoz - INFN Roma ECAL Settembre 2005.
ECAL (1) Torino intende assumersi la nuova responsabilita’ della costruzione completa delle Mother Boards per il VFE (gia` dati 30 kEuro nel 2003 per 100.
Un problema multi impianto Un’azienda dispone di due fabbriche A e B. Ciascuna fabbrica produce due prodotti: standard e deluxe Ogni fabbrica, A e B, gestisce.
Accoppiamento scalare
SUMMARY Time domain and frequency domain RIEPILOGO Dominio del tempo e della frequenza RIEPILOGO Dominio del tempo e della frequenza.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
M. DIEMOZ - GRI LECCE 25/09/03 CMS ECAL STATUS REPORT PRODUZIONE CRISTALLI COSTRUZIONE MODULI E SM NEI CR ELETTRONICA SISTEMA DI RAFFREDDAMENTO PROGRESSI.
Polarized target magnet New target magnet SMC (70 mrad)  COMPASS (180 mrad) Field homogeneity of ~ 3 × Saclay Test ripetuto al CERN:
MUG-TEST A. Baldini 29 gennaio 2002
Relazione Referee CMS C. Bozzi, G. Darbo, M. Dell’Orso → P. Lubrano, M.Morandin Roma, 4 Aprile 2006 Sommario: Stato dei sottorivelatori Richieste e sblocchi.
Trieste M. Diemoz - INFN Roma ECAL Settembre 2006.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
Frascati 14 Maggio Gr I M. Diemoz – INFN Roma CMS ECAL STATUS REPORT Produzione cristalli Produzione moduli Stato Elettronica Produzione SuperModuli.
Summary Module 1 – Unit 1 (Current, potential difference, resistance) RIEPILOGO Modulo 1 – Unità 1 (Corrente, tensione, resistenza)
Alessandra De Cugis Progetto Tempi e Orari del Comune di Milano Time in the cities, a holistic approach for urban time issues, the case of Milan Paper.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
Project Review Novembrer 17th, Project Review Agenda: Project goals User stories – use cases – scenarios Project plan summary Status as of November.
L. Carminati - P. GovoniIII Workshop sull fisica di ATLAS-CMS1 sessione di discussione uno spunto: la calibrazione in situ dei rivelatori CALORIMETRI ELETROMAGNETICI:
Geneva 30 November – 1 December 2015 Ministero delle Infrastrutture e dei Trasporti DIREZIONE GENERALE PER IL TRASPORTO STRADALE E L’INTERMODALITA ’ “To.
40 years of the Italian JPO Programme: an overview 14 dicembre Camera dei deputati - Roma Giovani italiani nelle Nazioni Unite: una storia lunga.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Buon giorno, ragazzi oggi è il quattro aprile duemilasedici.
Km3 – KM3NeT: stato delle attività Torre di NEMO – Fase2 Costruzione delle 8 Torri e della rete di fondo (M. Anghinolfi) Preparazione della costruzione.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
Richieste IFR 2011 Roberto Calabrese Università e INFN – Ferrara Marzo 2011.
Minimal Emergence of Darunavir Resistance at Treatment Failure: Are Interpretation Algorithms Adequate? Gaetana Sterrantino* 1, Mauro Zaccarelli 2, Maurizio.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Gigi Cosentino - LNL 20 ottobre 2016
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
A comparison between day and night cosmic muons flux
Transcript della presentazione:

Roma S. Ragazzi Milano-Bicocca ECAL Aprile 2007

Roma S. Ragazzi Milano-Bicocca Sommario Problema MB, e soluzione –Progresso nella integrazione e commissioning Risultati da test/commissioning –MTCC –Test beam H2 –Test beam H4 –Cosmici

Roma S. Ragazzi Milano-Bicocca Attività ECAL 2007 (v. MD 9/2006) Costruzione Moduli EB Centro Regionale (fase finale) Integrazione Super Moduli Bld27 (fase finale) Pre-calibrazione con Cosmici ad H4 (fase finale) Installazione e cablaggio ECAL Barrel in CMS Commissioning ECAL Analisi ECAL H4 Analisi dati H2 ECAL+HCAL PREPARARSI ALLA FISICA

Roma S. Ragazzi Milano-Bicocca ECAL integration progress in 2006 Spring ’05: first SM assembled with final MB Dec ’05: first SM assembled with final cooling Jan ’06: first problems appeared during MB installation May-July ’06: bad kapton batches delivered  rejected Sept-Oct ’06: SM validation test before Point 5  detected new disconnected channels at MB level Front-end electronics integration suspended in Oct ’06 Good health test of most of the already assembled SM Ageing test campaign on 300 MBs Creation of a task force Dec ’06: IBE decided to change MBs in as many SM as possible without interfering with CMS installation schedule

Roma S. Ragazzi Milano-Bicocca MB task force Members of the task force: A. Benvenuti with: A. Ball, P. Bloch, T. Camporesi, W. Lustermann, J.Nash, N. Pastrone, F. Pauss, P. Sharp,T. Virdee Task force meetings: October 31 st, November 15 th, 27 th and December 7 th The first meeting was dedicated to an overview of the problem, planning of the test campaign and procurement of a new generation of kapton cables. The other meetings were basically driven by the availability of the tests results

Roma S. Ragazzi Milano-Bicocca Faults happening at the level of the connection (hand soldering) between kaptons, VFE connectors and PCB on the Motherboards 1 MotherBoard = 25 channels 1 SuperModule = 68 MBs = 1700 channels

Roma S. Ragazzi Milano-Bicocca Ageing tests Sample of ~7500 ch spread over the whole MBs production from 4 dismounted SMs + extras –90 thermal cycles (-20ºC, 80ºC) Hp: > 10 LHC years operation checks done after cycles to study mortality – chemical stress: 80h at 80ºC and 80% humidity only on ½ sample to verify effect of residual soldering flux and kapton anomalies

Roma S. Ragazzi Milano-Bicocca B ch TO 21 ch Thermal cycles -20 to 80 0 C: B27 16 ch Channels Tested = 7850 (6750 from 4 SMs ) 80h C - 80% hum Channels Tested ~ 4225 B27 11 ch B27 8 ch B27 2 ch

Roma S. Ragazzi Milano-Bicocca “The MB tests done in Torino before and after the thermal stress cycles indicated that some of the faults (disconnected channels), 30% before the first test and 3-4% afterwards, were actually intermittent. Most of the faults ascribed to bad soldering occurred before the first thermal cycle suggesting that they probably broke during the removal/insertion operation. The faults ascribed to kapton occur during the thermal stress cycles more or less at the same rate within the limited statistics. The chemical stress test yielded only 2 faults/4225 channels Profile analysis of 6 MB that failed the thermal stress cycles presented a pattern of defective kapton manufacturing and soldering “ A. CMS Management Board Dec 8, 2006

Roma S. Ragazzi Milano-Bicocca “The overall picture that emerges from the tests and the handling of the boards (intermittent contacts) is that the kapton cables and the soldering to the pcbs are weak spots of the MBs, that probably will deteriorate with time since cables and solder points are under stress. The best strategy is to replace as many MBs as possible within the financial and more important the schedule constraints of CMS Technical coordination has developed a scenario where EB is fully installed in UX, mostly in the shadow of the layout of the cooling ducts and power cables for the tracker. This allows for maximal flexibility for the refurbishing EB without macroscopic delays in the readiness for Tracker Installation. The task force recommends that plans are made to replace the MBs in the entire EB if this proves to be consistent with the CMS schedule” A. CMS Management Board Dec 8, 2006

Roma S. Ragazzi Milano-Bicocca New MB parameter definition Task force examined in detail all the possible improvement to the new production exploiting past experience: –Kapton design was mechanically improved –New tests during production were required due to tacker experience –New assemply technique were tried Two new company were selected Ageing tests of 44 new MBs OK

Roma S. Ragazzi Milano-Bicocca Schedule ( as from L. Veillet planning) First installation window: April 17-May8 Second installation window: may 15- June 6 (but still discussions on start date: likely that the whole period shift by at least one week, in Austin master plan this shift is indeed implemented) Last MB delivered on 11 May : this is the Critical path (last bare SM delivered 3rd week of April!)

Roma S. Ragazzi Milano-Bicocca New integration B867 MB & cooling assembly

Roma S. Ragazzi Milano-Bicocca Old integration B867 front-end integration & SM commissioning

Roma S. Ragazzi Milano-Bicocca Integration status March –18 “mibare” completed (MB and cooling only) 11 completed and commissioned 2 completed and ready for commissioning 3 are being integrated 2 waiting integration on schedule for finished SMs (even slightly ahead) 15 Institutes involved in the integration & commissioning

Roma S. Ragazzi Milano-Bicocca ECAL schedule 9 SMs/month Current schedule today

Roma S. Ragazzi Milano-Bicocca 2006: test beams+Cosmici+MTCC H4 H4-cosmici H2 MTCC

Roma S. Ragazzi Milano-Bicocca MTCC Shower in ECAL Per ECAL principalmente un esercizio di integrazione DAQ DCS e Data Quality Monitor (G. Della Ricca Ts) hanno funzionato bene ECAL ha funzionato per circa 2 mesi senza problemi: noise allo stesso livello osservato in H4

Roma S. Ragazzi Milano-Bicocca MTCC TB results confirmed noise/ch ~ 40MeV No B-induced changes in the pedestal RMS  RMS pedestals 0T-3.8T 3400 ch

Roma S. Ragazzi Milano-Bicocca H2 – TB combinato ECAL+HCAL Raccolti dati di ottima qualità: elettroni e pioni 1 – 300 GeV

Roma S. Ragazzi Milano-Bicocca H2 goals Disponibili solo risultati preliminari: non esistevano per questi task software e algoritmi consolidati su test precedenti 20GeV beam 00 00 H2 Combined calorimetry Electron (photon)/hadron separation with ECAL only (shape analysis etc.) pi0 reconstruction and study of in-situ calibration with pi0 linearity studies down to 1 GeV e -

Roma S. Ragazzi Milano-Bicocca Test beam H4 Attività coordinata con successo da Nicolò Cartiglia (TO) Provata l’intera catena: XDAQ, DQM, CMSSW 9 SM calibrati, di cui 1 x 2 H4 E anche: Irradiation (6 Xtals) Energy Scan & linearity ( GeV, in M1, M3, M4 and as a function of eta) Gap & cracks, corners & edges (at different energies, in several positions) Horizontal and vertical fine scan (every 2 mm) Gain ratio (at many energies) Trigger primitives Zero suppressions Synchronous running Muons Xtals Monitoring and Laser operation

Roma S. Ragazzi Milano-Bicocca SM22SM18SM16SM17 September SM24SM12 August October SM22 SM November SM6 SM13 25 ns period H4 test timeline

Roma S. Ragazzi Milano-Bicocca Test beam H4 - analisi alcuni tra i principali goal: –Calibrazione: precisione di intercalibrazione e riproducibilità (resp. P.Govoni Mi) dimostrata allo 0.2% viene usata come riferimento per: –misure light yeld in laboratorio –intercalibrazioni con cosmici –Contenimento e confronto con Geant4, scan in  : analisi in corso e risultati preliminari (Resp. C. Rovelli Rm) –Linearità: risultati preliminari (Resp. N. Pastrone)

Roma S. Ragazzi Milano-Bicocca H4: intercalibration precision

Roma S. Ragazzi Milano-Bicocca H4: intercalibration stability

Roma S. Ragazzi Milano-Bicocca H4 - electrons vs. LY

Roma S. Ragazzi Milano-Bicocca Test beam H4 Provata la solidità dell’intera catena di monitoring e calibrazione: –Light yield (misura in lab, prima di montaggio) –DQM –Calibrazione cosmici (commissioninng SM) –Calibrazione con elettroni (test beam) –Laser Chiare relazioni quantitative tra le informazioni raccolte con le diverse procedure: fondamentali per commissioning finale di tutti i SM

Roma S. Ragazzi Milano-Bicocca Calibrazioni con raggi cosmici E’ la procedura di intercalibrazione adottata per tutti i supermoduli a completamento del commissioning (resp. A.Ghezzi, Mi) –APD gain x 4 (200 invece di 50) controllato con laser –progressi in: confronto con intercalibrazioni su fascio (notare range dinamico) contributo di mu che attraversano due cristalli studio e riduzione di effetti sistematici calibrazione di cristalli di confine modulo-modulo e di bordo del supermodulo

Roma S. Ragazzi Milano-Bicocca Scintillatori di trigger posizionati in modo da massimizzare l’accettanza per  puntanti Cornice di scintillatori di tag sui bordi del SM, per assicurare che il  passi per il SM 10° SM inclinato di 10° per aumentare il rate di  puntanti a grande . Cosmics Setup

Roma S. Ragazzi Milano-Bicocca Comparison with the test beam Comparison of the relative calibrations to study the typical results on a SM. All the TB calibrated SMs (except SM24) are merged, to obtain the average behaviour. M4 M3 M2 M1 M1  ~ 1.25 % M2  ~ 1.28 % M3  ~ 1.32 % M4  ~ 1.81 %

Roma S. Ragazzi Milano-Bicocca Comparison with the TB  index Considering the whole  range and all the SMs:  =1.41 % whole SM All the SMs No SM24 including SM 24  =1.49% in the peak Similar results for all the SMs relative calibrations

Roma S. Ragazzi Milano-Bicocca Comparison with TB Comparing the global calibration gives a figure of the accuracy obtainable from the calibration with cosmic muons, and of the spread between SMs  =1.47 % including SM 24  =1.55% in the peak All the SMs No SM24 Similar results for all the SMs

Roma S. Ragazzi Milano-Bicocca Edge and intra modules crystals Overall agreement for the combined calibration of the intra-module crystals: M1||M2 ~ 1.5 % M2||M3 ~ 1.65 % M3||M4 ~ 2.1 %  =1.45 % Relative calib Including the intra modules All the SMs No SM24 For the edges: From pairs M1~2.2%, M2~2.4%, M3~ 2.7%, M4 ~4.4% From singles They will be combined

Roma S. Ragazzi Milano-Bicocca Cosmic calibration - summary The average agreement of the calibration with cosmics and at the TB, over a single SM is at the level of 1.4% (1.5% including SM24) If also the global calibration between the different SMs is taken into account the agreement is at the level of 1.5% (1.55% including SM24) This varies from about 1.3% in M1 to about 1.8% in M4

Roma S. Ragazzi Milano-Bicocca Conclusioni Il retrofitting delle MB procede secondo la schedule –nessuna sorpresa –test con cosmici di moduli retrofitted dimostrano la riproducibilità delle calibrazioni La campagna di test e analisi del dimostra: –intercalibrazioni determinate e riprodotte allo 0.2% –robustezza della procedura di: misura LY in laboratorio DQM (resp. Trieste: G.Della Ricca et al.) monitor laser calibrazioni cosmici –Altri importanti risultati nella pipeline di analisi confronto tra diverse procedure di calibrazione linearità confronto con Geant4 calibrazione con pi0

Roma S. Ragazzi Milano-Bicocca Conclusioni (2) Restava un solo problema... –la revisione della schedule per il retrofitting delle MB comportava la quasi cancellazione dell’ importante programma di commissioning in situ (DQM, HV, laser...) sembra che anche questo problema ora sia risolto, ma non è una buona notizia