CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 1 ECA Barrel ECC.

Slides:



Advertisements
Presentazioni simili
L.Mandelli _CSN1_Settembre 02 LAr 2003 Stato della calorimetria Elettromagnetica Stato delle responsabilità INFN. Attività e responsabilità future del.
Advertisements

1 La farm di ATLAS-Napoli 1 Gb/s 7 nodi con 2 CPU PIII a 1 GH, RAM 512 MB, 2 schede di rete a 100 Mb/s. Server con 2 CPU PIII a 1 GH, RAM 1 GB, 2 schede.
Gianni Masetti Università di Bologna - INFN 21/2/2008 – DT Bologna meeting Stato del Commissioning delle DT Bologna DT crew.
TISB Firenze 15 – 16 Gennaio 2003 Ricerche di SUSY con CMS: alcuni commenti e idee… Alessia Tricomi Dipartimento di Fisica and INFN Catania.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
1 DAQ Layout VME Readout Unit (XDAQ) TTCvi TTCex TRG BSY Builder Unit (XDAQ) Monitor (ORCA) BSY TRG CCB MiniCrate DT Chamber 1 ROB CCB MiniCrate DT Chamber.
Stato dei sistemi di High Voltage Low Voltage Detector Control system.
Paolo Bagnaia - 10 January invecchiamento. elettronica di read-out; shielding (MDT, RPC, …); HLT + DAQ; _________________________ NB :non include.
Few considerations on the Perspectives for early discoveries BSM non SUSY at LHC Giovanni Franzoni University of Minnesota Lorenzo Menici Univerista’ La.
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
1 referee-ATLAS CSN I, Roma 2-3/4/2007 RELAZIONE DEI REFEREE DI ATLAS F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 3 aprile 2007.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
CSN1, 14 maggio 2007 Calorimetria EM a LAr di ATLAS 1 ECA Barrel ECC.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
G. Costa, Roma 16 maggio 2006 Commissione I LAr: status report 1.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
1 Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - Napoli 23 Settembre Angelo Scribano TOTEM – settembre 2005.
4/20/20151 Metodi formali dello sviluppo software a.a.2013/2014 Prof. Anna Labella.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
Produzione di Z + jet (b) ad LHC Monica Verducci CERN IFAE Catania 2005 (In collaborazione con A.Tonazzo RomaTre)
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
ATLAS Status Report S. Patricelli 6 aprile Sommario Commissione Scientifica Nazionale I 5-6 aprile 2004 S. Patricelli Highlights and concerns dei.
Accoppiamento scalare
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
SUMMARY Quadripoles and equivalent circuits RIEPILOGO Quadripoli e circuiti equivalenti RIEPILOGO Quadripoli e circuiti equivalenti.
Relazione Referee ATLAS F.Bedeschi, S. Dalla Torre, N.Pastrone, A.Zoccoli 17 Maggio 2005 Tiles L Ar MDT Aggiornamenti: Pixels RPC LVL1.
23 Settembre 2004Nino Del Prete1 TileCal, Stato del rivelatore Stato dei lavori in corso: Commissioning/Installazione Test Beam Combinato Analisi Cosa.
Lecce, 25 Settembre 2003 Gruppo I C.Roda for the Pisa ATLAS group 1 ATLAS – TileCal Sommario : Verso un Tile calorimeter intero: preassemblaggio e commissioning;
Polarized target magnet New target magnet SMC (70 mrad)  COMPASS (180 mrad) Field homogeneity of ~ 3 × Saclay Test ripetuto al CERN:
MUG-TEST A. Baldini 29 gennaio 2002
L.Mandelli _CSN1_Sept_03 ATLAS_LAr 2004 Status della calorimetria Elettromagnetica. Aggiornamento del programma di lavoro di Milano Calibrazione e misure.
Halina Bilokon ATLAS Software di fisica DC1 – DC2 DC1 aprile fine 2003 (versioni di software  3.x.x – 7.x.x)  Validation del Software  Aggiornamento.
RIEPILOGO Motori lineari
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
SUMMARY Transmission and distribution of the electric energy RIEPILOGO Trasmissione e distribuzione dell’energia elettrica RIEPILOGO Trasmissione e distribuzione.
RPC Status Outline Barrel installation and commissioning status
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
Filtri del secondo ordine e diagrammi di Bode
 SLP Tests in VME test stand: Saverio – Pierluigi (Daniel)  New test stand: Enrico (Saverio – Pierluigi)  VME Tests versus new test stand tests (Enrico-Saverio-Pierluigi)
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
L. Carminati - P. GovoniIII Workshop sull fisica di ATLAS-CMS1 sessione di discussione uno spunto: la calibrazione in situ dei rivelatori CALORIMETRI ELETROMAGNETICI:
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Atlas status report. Status of the Atlas detector The detector is fully installed (leaving out only parts staged according to 2004 plan : TRT wheel C,
Km3 – KM3NeT: stato delle attività Torre di NEMO – Fase2 Costruzione delle 8 Torri e della rete di fondo (M. Anghinolfi) Preparazione della costruzione.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
Firmware per il Trigger del RICH Cristiano Santoni Università degli studi di Perugia INFN - Sezione di Perugia Meeting generale GAP 13/01/2014.
Richieste IFR 2011 Roberto Calabrese Università e INFN – Ferrara Marzo 2011.
Architettura Energy (sviluppo del nodo)
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
Totale FTE tecnico elettronico 1 tecnico meccanico G.C.Barbarin o P.O.KM350% P.Migliozzi1 Ric. INFNKM380% C.MolloAssegno KM3KM380% G.DerosaRic. UKM330%
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Michele Iacovacci (Napoli),
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
Atlas Milano Giugno 2008.
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
ATLAS calorimeter system
Transcript della presentazione:

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 1 ECA Barrel ECC

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 2 Barrel Barrel in truck position in pit Infrastructure installation finished Electronics installation delayed by availability of components LV PS: Delays from manufacturer (MDI) First two proto failed load test (failing SMD capacitor) FEB: QPLL problem solved but still OTx problems 6 month delay: half should be recovered by new production/testing schedule All barrel FEBs by August (EC FEBs by November) Goal: install all electronics before moving to the IP? Cool down in IP: Start of cool down on 22/11/05 Barrel cold (will take 6 weeks) by end of December 2005 LArg filling beginning of Jan ‘06 Cryo ready for cold tests by mid Jan Then cold forever… Milano involvement: HV system commissioning

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 3

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 4 Endcap Calorimeters Endcap C Endcap A

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 5 Endcap C: Cold Test Cool-downWarm-up Normal working temperature (9 weeks)(7 weeks)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 6 Endcap C: cold test results Cold test successfully performed Electromagnetic (EMEC): 6/31872 (0.19‰) dead channels: 5 EMEC (3 strips, 2 back) + 1 PS 16 HV problems (1408 lines): 13 sectors can be biased only on half of the semi-gaps (can be corrected SW: no acceptance loss) 2 sectors shorted together along  1 sector problems on both sides (x=0.2x0.2) at =2.3 (0.2%): could be operated at ~500V (half nominal voltage) Hadronic Endcap (HEC): 2/3072 dead channels (0.65‰) Forward (FCAL): 11 shorts (0.19%) Cryostat warm now: Start decabling and leave cryogenic system to Endcap A cold test Milano involvement: HV tests Time Domain Reflectometer (TDR) measurements: characterization of calibration lines (March ’05)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 7

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 8 Endcap A Cold cover closed Feb 9 FCAL inserted, cabled and tested Welding of cold cover, purging of cold vessel, leak test, covers closed Cryostat displaced to cold test station ECA ready for cool down Cabling started last week Start of cool down: June 13 Cool down: 9 weeks Start of cold test: August 15 Cold test period: 6 weeks Milano involvement: HV set-up and tests TDR measurements

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 9

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 10 HV system status Milano is responsible of the HV control SW: Stable version since a while used for all tests up to now (CBT, Barrel/EC cold tests,…) Next step: integration with the rest of the DCS system Integration in the ATLAS DCS hierarchical system FSM: main tool for the implementation of the full control hierarchy in ATLAS, handle the states and transitions of the different parts of the detector. FSM: main tool for the implementation of the full control hierarchy in ATLAS, handle the states and transitions of the different parts of the detector. Iseg SW: Firmware and OPC server Iseg SW: Firmware and OPC server Unstable so far (v2.x, v3.x) Unstable so far (v2.x, v3.x) New version (v4.0) under test now, should fix bugs and instabilities New version (v4.0) under test now, should fix bugs and instabilities Will test new SW during ECA cold test starting in June Will test new SW during ECA cold test starting in June

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 11 Operator IF Data Viewer Alarm IF DCS_IS DIP Magnet CERN LHC DSS DAQ IS DAQ MRS DAQ RC CIC Global Control Station (GCS) Tile PixelSCTTRTLArMDTTGCRPC(CSC) LCS HEC LV LCS Temp LCS HV OPC LCS FE Crates HV/ LV PC Purity PVSS CAN DDC Local Control Stations (LCS) Subdetector Control Stations (SCS) Iseg HV modules Condition DB

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 12 Iseg HV modules HW responsibility: CERN, KTH, Wüppertal Modules still unstable During barrel cold test (August 2004) about half of the modules failed in going to 2kV: Problem traced to a bad batch of 10 nF/3 kV filter capacitors capacitors Capacitors replaced on all modules During Endcap C cold test (February ‘05) still several failures at V>2300 Volts: Failure of the voltage regulator Task force in action to investigate the problem and interact with the company: Three Milano people involved Meeting at CERN last week (also with Iseg people)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 13 Iseg HV modules Tests performed in Milano, CERN, Iseg We built 8 load boxes (32 channels each) to do a systematic qualifying test of all modules at CERN: 1.5 F and 150 k in series on each channel to mimic a typical calorimeter HV channel Long duration tests Boxes at CERN since last week Iseg examined defective modules: opto-coupler failure in the regulation circuitry opto-coupler replaced (3 kV → 7 kV) on 30 modules But origin of fault not fully understood New modules at CERN since May 9: Modules under test w/ and w/o load boxes at maximum voltage (2500 V) So far so good Unforeseen and very urgent activity

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 14 CBT: list of data collected Low energy & linearity study: e - +  (no inner detector) E=1->9 GeV eta=0.2, 0.25, 0.35, 0.45, 0.55, 0.65 magnetic field ON for some runs 1/2/3 Al plate(s) in front of LARG: eta=0.4 LARG HV scan: e GeV eta= , 1500, 1000, 500, 250, 125 & 0 Volts on one side of the drift gap e GeV eta= , 50, 100, 150, 200, 400 & 700 Volts on both sides of the drift gap Phi-scan of sector 4 with dead electrodes: e GeV, eta=0.7 Fine eta scan 180 GeV with scintillator between LAr & Tiles e + &  180 GeV Fine eta scan 250 GeV e - &  250 GeV Magnet scan at eta=0.45,  250 GeV 25ns data (basically no physics data) protons 350 GeV: data with physics code in DSP: Material study with all subdetectors (e -, e + ) E=1->9 GeV E=20, , 150, 180 GeV eta=0.35, 0.4, 0.45, 0.5, 0.55, material between pixel & SCT, SCT & TRT, B-field ON/OFF Special studies for TRT, pions in magnetic field + lead absorber  20, 50, 100 GeV – B-field varied Vary B-field µ 150 GeV eta=0.45 e + 20, 50, 100 GeV eta=0.45 Study with muon chamber in front of LARG: e GeV eta=0.1,0.2,0.3,0.4,0.5,0.7,0.6 Photon run with tracker in: e GeV (e + ~= 150 GeV,  ~= 30GeV) Photon run with only LARG & TRT: e GeV (photon energies varied using B-field MBPL-H & V E  between 10 and 130 GeV) Non pointing photons - only LARG: Incoming e GeV -> E γ =50 GeV nominal eta=0.3 - displacement -20cm, 20, 40 and 60 cm

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 15 CBT: analysis Slow start-up of the analysis Delay runs collected in August-September Several software problems in switching from stand- alone framework to Athena Several problems with DB Lack of manpower End of February DB is finally full: Delay runs Master Waveform Calculation of optimal filtering coefficients can start single DAC calibration waves master waveform

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 16 Signal reconstruction and CBT RTM OFC (Milano Method) ready for all EMB module (all samplings) in DB Need to select the right OFC set (0,24) from TDC TDC needs to be calibrated Phase information from TDC is corrected with time offsets (found via iteration on data): Global: single value, related to general setup FEB: 1 value/FEB (16) Gain dependence TDC corrections finally available for all run periods Results for hi-p T electrons Energy scale still to be fixed Other corrections to be implemented: dead material, out-of-cone, leakage σ E / =0.97% E=250 GeV Expect:~0.7% = 182 GeV  / =0.87% E=180 GeV

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 17 CBT analysis Pedestal, ramps, delay & timing analysis finished and available in DB OFC: sets available and being tested: NTUPLE & ESD production using OFC starting First look at uniformity =0.4% Other studies: linearity (material studies) photon & muon runs pions Soon ready for combining track & calo for particle ID studies ±0.4%

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 18 Endcap Services Design phase completed in Milano Official drawings under finalization Milano is responsible for the installation of the Endcap services (ECC and ECA). Procurement of material starting (BNL, CERN) To minimize costs some materials will be shipped to Milano where they will be preassembled and tested Will bring in Milano mock- up/structure now in B180 help in the preparation of the various pieces Complicate service design All pieces are different from each other

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 19 Endcap services 13 electronic crates 4 differenti topologie di servizi: FCAL, EMEC, HEC/EMEC- special, Crates-feet Operazioni: PS: montaggio, cavi, schermi installazione water manifolds cooling FEB e PS cavi LV, cavi di trigger installazione delle box delle ELMB Installazione optical-boxes installazione parziale fibre TTC cavi di trigger test water lines ELMBLV PS Optical box HEC PS

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 20

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 21 Barrel Services

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 22 Calibration Calibrate em objects On DC2 samples Geant 4 Calibration hits: energy lost in dead materials (upstream, downstream, absorbers) Study various basic quantities: intrinsic response of the accordion Lateral containment Longitudinal leakage Energy lost between PS and strips... Goal is to parametrize these quantities as a function of a minimal set of observables Get to an em calibration scheme

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 23 Higgs analysis Complete analysis on inclusive channel H →  LOon DC1 samples ATLAS note under submission Also performed analysis on VBF channel: Low luminosity so far Higgs signal significance increases combining the two analysis: 10% improvement Next steps: Started validation of DC2 samples NLO analysis

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 24 E T miss,  reconstruction Study of Z →  → lep+had Control sample for reconstruction of ’s and for calibration of E T miss during commissioning: (M Z ) (E T miss ) 33k evts (Rome data) Digitized with noise in calorimeter Analysed from AOD and CBNT ROOT ntuple E T miss reconstructed from all calo cells in ||<5 (H1-style weights) Also from topoclusters Muons contribution (Moore muons) Cryostat correction Analysis cuts: PT(lep), PT(t) > 15 GeV <2.7 Next: Tune cuts Reconstruct also lepton background

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 25 Milestones 30/06/2004 Software per la ricostruzione del segnale con il metodo di Milano pronto al Test Beam combinato, compresa l`analisi delle linee di calibrazione e dei delay runs. 31/07/2004 Acquisizione misure con il Time Domain Reflectometer sul Barrel freddo e analisi preliminare 31/12/2004 Studio dell`uniformità del modulo 0 EM Barrel esposto al Test Beam combinato. 31/08/05 Installazione SW e inizio tests HV in USA15 31/08/05 Inizio misure HV sul Barrel nell`IP Completamento misure HV e TDR di ECA (in B180) Analisi dei dati del test beam in via di finalizzazione 31/10/05 Inizio integrazione dei servizi su EC-C in UX15 → OK (March 05) → OK → NO → scrittura software iniziata → settembre → settembre cold test, ottobre warm-up → novembre

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 26 Richieste finanziarie

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 27 Commissioning and Installation High Voltage activity: ECC cold test in B180 (fatto, parte si è dovuta fare nel 2005) ECA cold test in B180 (June- September) Inizio attivita’ nel pit: test HV sul barrel nell’IP, ECC (e ECA?) nel pit Integrazione col DCS di Atlas Attivita’ extra: HV task force, interazioni con Iseg (CERN, Dresda), endurance test dei moduli con i load boxes al CERN TDR measurements: ECC cold test in B180 (fatto) ECA cold test in B180 (August/September) Installazione Servizi ECC: preparazione al CERN e installazione servizi Team di 3 tecnici e supervisione del team al CERN da ottobre a dicembre Ad oggi: 1.5 mu HV e TDR su ECC A luglio: 4 mu 2 mu HV: ECA, load box, Iseg.5 mu: servizi ECC, disegni, mock-up Ad agosto/settembre: 5.5 mu 1.5 mu: finalizzazione HV e TDR ECA A fine anno: 10 mu 2 mu HV: test HV barrel, ECC e ECA nel pit, integrazione DCS 2.5 mu: servizi ECC nel pit Richiesta: 5 mu aggiuntivi missioni estere

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 28 Missioni Interne L’assegnazione di 14 k€ copre la ordinaria amministrazione e non tiene conto dei seguenti eventi: Liquid Argon week a Gargnano (12-16/09) organizzato da Milano Atlas Physics Workshop a Roma (6-11/06) Richiesta: 16 k€ aggiuntivi missioni interne 8 k€ per circa 8 persone a Gargnano 8 k€ per 5 persone a Roma

Back-up slides

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 30

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 31 Parameter analysis: Comparison with direct LC measurements (1) Systematic (mean) ~ 1% RMS ~ 2% Medium gain  extr =  meas for clarity Agreement with LC measured at cold is very good Reminder: 1% variation on LC leads to ~ 0.1% on peak reconstruction…

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 32 Parameter analysis: Calibration board parameters Medium gain L CB  8.8 H L CB  11.5 H R CB  2 

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 33 TDR measurements Length spread in each family 3  =1.5 ns (30cm). black TDR profile (TB ft=1,short line) green Z0=50 (Hspice simulation) red Z=Z0  2 (Hspice simulation)

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 34 TDR measurements cold pin carrier terminazione MB delay cavi di calibrazione baseplane vacuum cable warm cable warm pin carrier Blue: ionization signal Red: calibration signal

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 35 Ricostruzione del segnale: Strategia di calibrazione (2) Segnale di ionizzazione: Segnale di calibrazione: Funzione di trasferimento della catena di readout: Segnale di ionizzazione triangolare: Segnale di calibrazione “exponenziale”:

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 36 Ricostruzione del segnale: Strategia di calibrazione (3) Correzione per il punto di iniezione: LC Per completare l’equalizzazione delle celle, il guadagno di readout calcolato con il segnale di calibrazione… … va applicato a un segnale di ionizzazione che è stato corretto! Il segnale di ionizzazione triangolare generato nel gap di LAr è “normalizzato” quando corrisponde a un segnale di calibrazione unitario iniettato a livello della MB… Correzione per le diverse forme di corrente iniettata: T d, f step,  cali Le correzioni al segnale di ionizzazione sono implementate nella procedura di ricostruzione del segnale campionato…

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 37 A  Ricostruzione del segnale: “Optimal Filtering” L’ampiezza del segnale e il delay sono calcolati come combinazioni lineari dei campionamenti {S 1,…..,S N } I coefficienti a i e b i vengono calcolati a partire da: Forma “normalizzata” del segnale Autocorrelazione del noise Ampiezza del segnale delay Segnale “normalizzato” noise Il segnale è campionato ogni  t = 25 ns:

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 38 Ricostruzione del segnale: il metodo “Milano” 1.Obiettivo della procedura è l’estrazione di tutti i parametri utili alla predizione del segnale di ionizzazione dall’impulso di calibrazione  cali fit esponenziale sulla coda del segnale f step minimizazione  2 coda step response LCminimizazione  2 coda cosine response LCanalisi in frequenza FFT segnale 2.Il guadagno elettronico di ogni canale viene direttamente misurato attraverso una procedura di fit lineare (Master Waveform) ! OFC [ A/ADC ] 3.Il segnale di ionizzazione “normalizzato” viene predetto direttamente con una convoluzione numerica, senza l’utilizzo diretto di dati da segnali di fisica. concordano allo 0.5%

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 39 Ricostruzione del segnale: 32 samp. test-beam delay runs t (ns) y(t) = m(t) x DAC + DAC 0

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 40 Ricostruzione del segnale: Parametri dell’impulso di calibrazione P15 Middle FT0

CSN1, 17 maggio 2005 Calorimetria EM a LAr di ATLAS 41 Ricostruzione del segnale: Parametro  0 = 1/LC Misura diretta FFT del segnale di calibrazione: blackraw transform redexp. correction blueshaper correction