EPSI: Status Report E. Iacopini CSN1: Assisi 21 settembre 2004 Nuovi recenti risultati da NA48/n Run 2004 (NA48/2) Run 2004 (NA48/2) Possibili sviluppi.

Slides:



Advertisements
Presentazioni simili
NA48 status report INFN-CSN1 Lecce E. Iacopini 22 Settembre 2003.
Advertisements

24 settembre 2004Commissione Scientifica Nazionale I 1 KOPIO: Relazione dei referee Anna Di Ciaccio, Enrico Graziani Commissione Scientifica Nazionale.
Esperimenti di fisica delle alte energie 1 Esperimenti di Fisica delle Alte Energie Periodo didattico : II semestre CFU : 6 Ambito disciplinare : FIS/04.
Decadimenti di mesoni K per la ricerca di nuova fisica oltre il Modello Standard Mauro Piccini INFN Perugia Perugia – 30 Marzo 2011.
Consiglio di Sezione INFN di Perugia
Queuing or Waiting Line Models
Lesperimento NA48 E. Iacopini: Bologna 24 Marzo 2005 …Passato Presente Futuro …
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Motor Sizing.
A man has decided to include in his home intelligent systems to monitor the home. He installed two water pulse counters into the central water system.
I giorni della settimana
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
E. Iacopini, CSN1: 5 febbraio 2007 It's a long long way to Tipperary, But my heart's right there. Argomenti:  Stato degli R&D i) GigaTracker ii) Veti.
1 s d CSN1: E. Iacopini, 15 Maggio Ultimi risultati di NA48/2 Ultimi risultati di NA48/2 P326 R&D: P326 R&D: i) I tests previsti nel 2006; i)
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
Ontologia AA F. Orilia. Lez. 16 Discussione dell'approccio controfattualista di lewis condotta da Antonio De Grandis.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
MUG-TEST 1 L’esperimento MEG A. Baldini 17 settembre 2002
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
COMPASS marzo 2006 COmmon Muon and Proton Apparatus for Structure and Spectroscopy NA58 Czech Republic, Finland, France, Germany, India, Israel, Italy,
Il progetto Precision Proton Spectrometer
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations.
Novembre 11, 2003A. Ceccucci, Commissione I1 Possibile futuro per fisica dei K al CERN Augusto Ceccucci/CERN Decadimenti rari dei K ed il modello standard.
Metodi di indagine di molecole biologiche 2008 Piccioli-Turano Spettroscopia NMR di molecole Biologiche. Aspetti fondamentali della tecnica (Recupero nozioni.
Lezione 6: gamma Matrice CKM e unitarietà Misura di precisione di sin2  Media mondiale ± Misura di  in decadimenti senza charm Misura diretta.
Accoppiamento scalare
SUMMARY Time domain and frequency domain RIEPILOGO Dominio del tempo e della frequenza RIEPILOGO Dominio del tempo e della frequenza.
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
THE LIGHT How does the light propagate?. 1)To verify that light propagates in straight lines 2)To compare an object with its projection on a rigid screen.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
Dottorato in Fisica XXV Ciclo Padova 19 Aprile 2011 Ezio Torassa Corso avanzato di fisica del Modello Standard e di nuova fisica alla scala elettrodebole.
EPSI Relazione dei referee Maria Curatolo Anna Di Ciaccio Valerio Vercesi CSN1 - Assisi Settembre 2004.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
NA48 status report Catania 17 Settembre 2002 E. Iacopini.
Polarized target magnet New target magnet SMC (70 mrad)  COMPASS (180 mrad) Field homogeneity of ~ 3 × Saclay Test ripetuto al CERN:
MUG-TEST A. Baldini 29 gennaio 2002
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
CSN1, 17 settembre 2002 COMPASS prospettive verso la fase 2: tempi ed impegni italiani previsti F. Bradamante attivita’ della collaborazione per la fase.
1.STATO DELL'ANALISI DEI DATI RUN FASE 2 CSN1, 23 settembre 2003.
Mara Martini Università di Ferrara Un Gigatracker per NA48/3 – P326.
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
SUMMARY Real operational amplifiers RIEPILOGO Amplificatori operazionali reali RIEPILOGO Amplificatori operazionali reali.
Fotonica 3D.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Franco Bradamante CSN1, Ferrara, 17 settembre 2009 run 2009 pubblicazioni in preparazione interazioni con il CERN e stato delle proposte per nuove misure.
Attività 2014 LNS  Presa dati e analisi  Gestione fondi PON (Acquisizione materiale, commesse, formazione…)  Completamento progettazione e avvio realizzazione.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
CROMATOGRAFIA LIQUIDA (L.C.) Gel filtrazione (Size-exclusion chromatography) Scambio ionico (Ion exchange chromatography) Affinità (Affinity chromatography)
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
Richieste IFR 2011 Roberto Calabrese Università e INFN – Ferrara Marzo 2011.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Michele Iacovacci (Napoli),
The scattering vector from a single atom is known as the atomic scattering factor. It is denoted f, and has length |f| and phase . The resultant.
Lepton Flavour MEG A. Baldini CSN1 22 Nov. 2011: GGI.
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Gigi Cosentino - LNL 20 ottobre 2016
Accelerator Disision March 3rd 2015
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Atlas Milano Giugno 2008.
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
A comparison between day and night cosmic muons flux
P. Rossi JLAB12 Collaboration Meeting Roma, 9 Giugno 2011
Transcript della presentazione:

EPSI: Status Report E. Iacopini CSN1: Assisi 21 settembre 2004 Nuovi recenti risultati da NA48/n Run 2004 (NA48/2) Run 2004 (NA48/2) Possibili sviluppi futuri Possibili sviluppi futuri

Nuovi recenti risultati …

L’unitarietà della matrice CKM

V us dal K 0 e3

K 0 e3 Data/MC comparison

V us dal K 0 e3 BR(K L →3   ) = ±0.0070…

V us dallo   beta decay

V us dal K + e3

V us da NA48/n

Altri risultati …

… e altri ancora …

NA48/2 (risultati dal run 2003)

 Direct CP violation in K ±   ±  +  , K ±   ±  0  0 M (u )  1 + g  u, u= (2m K /m  2 ) (m K /3 – E*  -odd ) M (u )  1 + g  u, u= (2m K /m  2 ) (m K /3 – E*  -odd )  (A g ) < 2  10 – 4 (limited by statistics) g + - g - A g = ———— g + + g -   Rare decays: to test  PT & search for A CP K e4  -  scatt. length  ( ) 10 6 events) K      , K     e + e , K      +  , K  e2, K   l  l + l , K      0 , K      0 l + l , … etc.   Semileptonic decays: K  e3, K   3 contribution to the measurement of |V us | search for f T, f S The Goals of NA48/2

E.Shabalin-98 I.Scimemi-04 A g : theory & experimental limits 1.0E E E E E SUSY SM |Ag||Ag| new physics G.D’Ambrosio-97 G.D’Ambrosio,G.Isidori, G.Martinelli-99 L.Maiani,N.Paver-95 E.Shabalin-01,-04 NA48/2 experiments by 2002

1cm DFDF Quadrupole 2 nd Quadruplet ACHROMAT FRONT-END ACHROMAT 10 cm m vacuum tank He tank + spectrometer magnet B+/- K+K+ K-K- K+K+ K-K- focusing beams NA48/2 experiment configuration 114m decay volume beams coincide within <1mm FDFD P K spectra, 60  3 GeV/c The simultaneous K + and K - beamsNA48 Set-Up not to scale TAX 17 TAX 18

1cm DFDF Quadrupole 2 nd Quadruplet ACHROMAT FRONT-END ACHROMAT 10 cm m vacuum tank He tank + spectrometer magnet B+ K+K+ K-K- K+K+ K-K- focusing beams The simultaneous K + and K - beamsNA48 Set-Up NA48/2 experiment configuration alternate magnet polarity daily (’03) 3-4h (’04) FDFD not to scale TAX 17 TAX 18

1cm DFDF Quadrupole 2 nd Quadruplet ACHROMAT FRONT-END ACHROMAT 10 cm m vacuum tank He tank + spectrometer magnet B- K+K+ K-K- K+K+ K-K- focusing beams The simultaneous K + and K - beamsNA48 Set-Up NA48/2 experiment configuration alternate magnet polarity daily (’03) 3-4h (’04) FDFD not to scale TAX 17 TAX 18

1cm DFDF Quadrupole 2 nd Quadruplet ACHROMAT FRONT-END ACHROMAT 10 cm m vacuum tank He tank + spectrometer magnet K+K+ K-K- K+K+ K-K- focusing beams The simultaneous K + and K - beamsNA48 Set-Up NA48/2 experiment configuration alternate the beam lines (weekly) FDFD not to scale TAX 17 TAX 18

1cm DFDF Quadrupole 2 nd Quadruplet ACHROMAT FRONT-END ACHROMAT 10 cm m vacuum tank He tank + spectrometer magnet K-K- K+K+ K-K- K+K+ focusing beams The simultaneous K + and K - beamsNA48 Set-Up NA48/2 experiment configuration alternate the beam lines (weekly) FDFD not to scale TAX 17 TAX 18 Supersample

… Alcune definizioni … dove u = ( S 3 – S 0 ) / M   e S i : (P K - P  i ) 2 = M K 2 + M  M K E *, S 0 =  S i /3 = M       → u=(2M k /3M  2 )(M K - 3 E * ) K+ K- u distributions for K+ e K-

A g measurement A g measurement (acceptance cancellation) Physical asymmetries: Physical asymmetries:  A S → slope of ratio U(K + B+) / U(K - B-)  A J → slope of ratio U(K + B-) / U(K - B+) Z axis (beam direction) Saleve Jura X axis Top view of the setup Apparatus-induced asymmetries: A + → slope of ratio U(K + B+) / U(K + B-) A  → slope of ratio U(K - B+) / U(K - B-) A SJ = (A S +A J )/2   g = A g  2g physics asymmetries (to mask the results A SJ,A S & A J are presented with OFFSETS !)  A ± = (A + +A  )/2 = (A S -A J )/2 asymmetry induced by the experimental setup asymmetry induced by the experimental setup ( many of the effects observed in A ± cancel in A SJ ) ( many of the effects observed in A ± cancel in A SJ )

recorded events, 10 6 # of Super- Samples run K    -  +   K    0  0   (complete cycles) 2003 (I) 2003 (I) ~ 600 ~20 non-stable conditions 2003 (II) (analyzed) 2003 Statistics ~ 1 month of data taking in 2003 at stable conditions have been analyzed

|V| U Dalitz plot for K      +  - & M(3  ) odd pion in beam pipe even pion in beam pipe M 3π, GeV/c 2 Events KK K+K+ SS1-3 data: > 1120 million events selected

Asymmetry vs. P K Asymmetry vs. P K ( 1 month ’03 data): preliminary Statistical error of A : 2, Statistical error of A g : 2.7*10 -4  2 /ndf 6/11 A SJ + offset = 0 ± 0.117*10 -3  2 /ndf 6.7/11 A  = (0.131 ± 0.117)*10 -3 K±±+-K±±+- P K, GeV/c A S +offset A J +offset A+A+ A-A- (A S +A J )/2 + offset (A + +A - )/2 A g =A SJ /2g =A SJ * 2.304, essendo g = ±0.007

Asymmetry vs. time Asymmetry vs. time ( 1 month ’03 data): preliminary  2 /ndf 5.6/12  2 /ndf 13.5/12 A S +offset A J +offset A+A+ A-A- (A S +A J )/2 + offset (A + +A - )/2 Day-sample pair K±±+-K±±+-

Results on A g one month of NA48/2 data taking in 2003:  K ±   +    ± A g c = (  2.7)∙10 -4  K ±   0  0  ± (36M events) A g 0 = (  5.0)∙10 -4 uncertainties dominated by the statistical errors! Other experiment data on A g c BNL (1970): (- 7.0 ± 5.3)∙10 -3 FNAL, HyperCP –2000 (preliminary) (2.2±1.5±3.7)∙10 -3 Serpukhov data on A g 0 I.V.Ajinenko et al., PLB567(2003)159.: (5.1 ± 2.8 )∙10 -3 G.A.Akopdzhanov, hep-ex/ prelim.: (0.2 ± 1.9 )∙10 -3

Run 2004

The startup  Technical run during the week of April 19 th Smooth startup as usual Start refurbishing old tagger FADC readout for Kabes  Some clouds appeared… PS startup delayed by one week PS startup delayed by one week Need to exchange all the water pipes to the booster Kevlar window was discovered broken Kevlar window was discovered broken  No further delays PS startup was in time with the revised schedule Protons to NA48 on Friday May 14 th Spare kevlar window put back in a record time …

Kevlar window broken (courtesy of Luigi di Lella)

First period 15/5-8/6  Supersample 4 Start data taking … B field inverted every 30 million triggers  A new problem… PS septum 16 broken (water leak in the vacuum) 5 days without beam Replaced with the only spare (remember this…) Coupled to a faulty bellow in TT20 transmission line

Scrubbing & 25 nsec structure  From 8/6 to 27/6 (19 days) Maintenance during the scrubbing runs 25 nsec time used for  runs + test session for the future Different timing (2.2/12.0 seconds) Bunched structure different istantaneous intensity Tight schedule for tests Commissioning of the resurrected FADC readout for Kabes Test of a Kabes station with 25  m mesh Test of an Alice pixel chip as a high rate beam tracker Commissioning of Lkr selective readout

Second period 27/6-7/7  Supersample 5 Alternate the achromat with 3 periods (i.e. down, up, down) Better control of the number of event for each class (u/d,+-) …  But black clouds were coming back…

Second period 27/6-7/7  On July 5 th the PS septum 16 broke Yes, it was the only spare installed in May… ! The original one was foreseen to be repaired in September after a proper cool-down period It was decided to repair the original one (3 weeks) Operate without cooling during this time 1 injection batch instead of 2 11  s beam substructure Half integral intensity at the same instantaneous rate  Beam back on July 6 th, evening, with an intensity gradually approaching the nominal one Twice the instantaneous rate

Third period 7/7-19/7  Supersample 6 Still with 11  s beam sub-structure, Implement selective Lkr and HAC readout 5/16 (then 6/16) of events with only 2VTX and 1VTX not readout Improve from 52k to 60k events/burst, keeping the good number of K   +  -   at 12k The period ended with the stop (5 days) for the PS septum installation  We got an extension/compensation time 2 weeks to be shared between asymmetry data taking and test for the future

Fourth and fifth period 23/7-11/8  Supersample 7 Go back to standard beam conditions Nominal instantaneous intensity  Supersample 8  Good operating conditions

Muon runs for alignment  Muon runs more frequent than in 2003 Get better control on the time dependence of the alignment Frequency of about ten days between muon runs (except at the early stage of the run) Alignment is very stable, unlike 2003

Statistics 2004 Statistics in 10 6 K 3  charged SSDatesA+B+A+B-A-B+A-B- 4 15/5 – 8/ /6 – 7/ /7 – 19/ /7 – 1/ /8 – 11/ Total Grand total: 2.15*10 9

Futuro… EOI CERN-SPSC del LOI sarà presentata a Villars (26 sett. 2004)

Possibili scenari dopo NA48/2 (>2005) … misurare BR di decadimenti rari, come E. Iacopini CSN1:28 Gennaio 2004

Perché misurarli ?

…dal solito triangolo dello SM: Perché misurarlo ?

Predizione (CKM Workshop): BR(K + →   ) = 8.0 ± 1.1 × Sono attesi miglioramenti nel calcolo NNLO  4 % error (Buras) K + →  + : Teoria L’ elemento di matrice adronico può essere estratto dal ben misurato K + →  0 e Non ci sono contributi “long distance” all’ampiezza QCD NLO Buchalla, Buras 1999

Beam: Present K12 (NA48/2) New HI K + > 2006 Factor wrt 2004 SPS protons per pulse1 x x Duty cycle (s./s.) 4.8 / Solid angle (  sterad)  0.40  1640 Av. K + momentum (GeV/c) 6075 Total : 1.35 Mom. band RMS: (  p/p in %)  4  1~0.25 Area at KABES (cm 2 )  7.0  20  2.8 Total beam per pulse (x 10 7 ) per Effective spill length (MHz) / … / cm 2 (KABES) (MHz) ~45 (~27) ~16 (~10) Eff. running time / yr (pulses) * K + decays per year *  40 Possible new high-intensity K + beam for ‘NA48/3’ (K + →   )

Principali decadimenti in competizione con K + →  +                         e  63 % 21 % 6 % 2 % 3 % (called K +  3 ) 5 % (called K + e3 ) Soppressione:  PID, kinematics  veto, kinematics CHV, kinematics  veto, kinematics  veto,  PID  veto, E/P Veti il più possibile ermetici e misure ridondanti sono una necessità assoluta, comunque l’alta energia dei K li semplifica …

golden zone Region I Region II

NA48/3: Experimental Layout 5 MHz Kaon decays Vacuum 800 MHz (  /K/p) Only the upstream detectors see the 800 MHz beam straw Gigatracker: 2 Spibes+FlashTPC

Acceptance 20 events per BR = (Region I) Acceptance Region IRegion II 75 GeV/c 80 events/year !! But populated by 3 body decays

2004 tests …. One of the two weeks of extension/compensation has been devoted to tests for the future  Small angle veto with crystals  Kabes readout with FADC  Pixels for beam tracker  Intensity scans for Kabes (25 and 50 mm meshes)  Quartz counters for a possible new hodoscope

Small angle photon veto PbWO 4 crystals (CMS) Dimension of crystals 2x2x23 cm 3 7 x 7 cm matrix ~ 25 X 0 Readout with light guides and PMT Hard to radiation damage

725µm thick ALICE chip 300µm thick sensor Mounted on thin test-PCB Material in beam: 3.78 % X 0 Chip=0.77% X 0 Sensor=0.32% X 0 PCB=0.8% X 0 V fd =21V V op =30V 2 x 8192 pixels Pixel Assemblies ALICE Pixel Assemblies tested in August 04 in NA48

Charged hodoscope Time resolution, together with CEDAR and Gigatracker ≈ 100ps We are considering a design in which the scintillator, orthogonal to the beam axis, is seen by PMs disposed along the beam Another possibility could be to look at the Cerenkov light from a slab of fused silica Glass RPC as ALICE ?

Cerenkov (CEDAR) K/  Cedar-W Cedar-N Test foreseen during October 2004 run, together with Compass Cerenkov differential counter Highly parallel beam

NA48/3: Veti per i fotoni Disegno KTeV/CKM Sandwich 1 mm piombo 5 mm scintillatore E` auspicabile, ma resta da dimostrare, che lavorando ad energie piu` alte si possano rilassare le richieste rispetto a CKM BR(K + →  +  0 ) ~10 10  BR(K + →  + ) Non c’e` rischio di enfatizzare troppo questo fatto:

Muon rejection Better than rejection inefficiency mandatory obtained by NOMAD We are designing a new detector (MAMUD) incorporating: Hadron calorimetry Muon Rejection Sweeping Magnet

Previsione sui tempi NA48/3 Tentative timescale: 2004 Definition of the new detectors and cost estimation 2005 Prototype tests of the new items Proposal for SPSC 2006 TDR submission 2007 Construction 2008 Construction 2009 Data Taking

K + →  + E949 Continuazione di E787(dec. a riposo) 12 settimane di presa dati nel 2002: Analisi in corso, ci si auspica: –Sensitivita` Regione II molto migliorata –Sensitivita` (I + II) 2002 simile a quella di E787 Approvati per 60 settimane… –Ma… nessuno sa se e quando l’esperimento continuera` la presa dati Lettera di intenti a J-PARC basata sulla stessa tecnica.

Proposta per misurare ~100 K + →  +  (in volo) Ridondanza: spettrometri magnetici e RICH (per K e  ) Il necessario R&D e` stato completato: – –Costruito prototipo di SCRF per il fascio di K separato (22 GeV/c) – –Inefficienza dei veti per fotoni e` 5×10 1 GeV (misurata) Un fattore 6 meglio del necessario – –Operazione in vuoto dei tubi a “straw” dimostrata HEPAP-P5 non ne ha ratificato l’approvazione per ragioni di costo

E` il primo esperimento dedicato per cercare K L →    SES~ Basato su veti ermetici a fascio neutro molto collimato Presa dati (~100 giorni) durante il 2004 Questa iniziativa potrebbe continuare a J-PARC

(2009?) Si propone di raccogliere ≈ 60 K L →    con Segnale/Fondo ~2 (Im t ~ 15%) Misurare tutto quanto possibile: –Energia, Posizione ed angolo per ogni fotone Lavorare nel centro di massa –Fascio AGS con microstruttura –Uso del tempo dI volo per misurare l’impulso del K L Inizio costruzione nel 2005.