RPC Status Outline Barrel installation and commissioning status

Slides:



Advertisements
Presentazioni simili
1 fgasparini INFN roma 30/3/2006 Assemblaggio DT Produzione Minicrates Installazione Elementi critici e azioni Conclusioni fgasparini STATO DT E BARREL.
Advertisements

GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
G. Pugliese Bari, 20 May 2005 I rivelatori a Resistive Plate Chambers G. Pugliese per la Collaborazione CMS di Bari.
Queuing or Waiting Line Models
Ultime Novita da P5 21 May M.Giunta23rd May, LV Status LV –11 MAOs smontati e mandati in CAEN per modifiche Problemi: –portafusibili non.
Gianni Masetti Università di Bologna - INFN 21/2/2008 – DT Bologna meeting Stato del Commissioning delle DT Bologna DT crew.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
HV-LV-DCS-DQM. HV – LV (Cimmino, Paolucci, Polese) Stato degli Ordini (gare 2003) 1.2 MAO sono stati già consegnati (W+2 wheel test) 2.Schede HV sono.
Stato dei sistemi di High Voltage Low Voltage Detector Control system.
Il Futuro The Future Tense.
Cablaggi e Sistema di Potenza. P.Paolucci - INFN Napoli 2 incontro con i referee Cabling: quantità e task 5 famiglie di cavi da produrre, testare,
I giorni della settimana
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
Stato del progetto RPC Riunione Commissione I Roma 4/4/2006 R. Santonico.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Stato del progetto RPC P. Paolucci & CMS RPC group.
G. Costa, Roma 16 maggio 2006 Commissione I LAr: status report 1.
1 TASK – Necessità fino alla fine dell’anno connettorizzaz. e test dei cavoni HV2 mu test sistema HV (accensione sistema globale)2 mu* (2 da contingenza)
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
WG-SLHC Dove siamo, …. dove e come andiamo? Spunti per una discussione M. de Palma Roma, CSN1 16 Maggio 2006.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
B.Borgia 26/3/20081 Stato elettronica UG controllo TRD 26 Marzo 2008 A.Bartoloni, B.Borgia, F.Spada.
STATO BARREL MU DT Roma 12/3/2007 F. Gasparini BARREL MU INSTALLATION IN YB0 UXC 7/3/2007.
A. Colaleo1 Stato produzione Stato installazione e commissioning RPC nell’MTCC Phase 1 Phase 2 Attivita’ dopo l’MTCC Stato cablaggio Stato sistema monitoring.
ATLAS Status Report S. Patricelli 6 aprile Sommario Commissione Scientifica Nazionale I 5-6 aprile 2004 S. Patricelli Highlights and concerns dei.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
IFR LST status Roberto Calabrese Universita’ e INFN, Ferrara Commissione I, 18/5/2004.
MUG-TEST A. Baldini 29 gennaio 2002
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
1 fgasparini INFN roma 30/3/2006 STATO BARREL MU: DT & RPC Costruzione e installazione fgasparini SW,commissining e analisi ugasparini Elettronica e Cosmic.
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Old Milestones: we have even more relaxed our schedule.
 SLP Tests in VME test stand: Saverio – Pierluigi (Daniel)  New test stand: Enrico (Saverio – Pierluigi)  VME Tests versus new test stand tests (Enrico-Saverio-Pierluigi)
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 Closed Loop e Gas Gain Monitoring Il Closed Loop e’ in operazione stabile dopo lo.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
Stato degli RPC Presentazione alla Commissione Nazionale I Roma 7 Feb 2006 R. Santonico.
Rapporto del gruppo di lavoro sui criteri richiesti per essere autori di Atlas Italia G. Carlino, S. Falciano, L. Mandelli 5/30/2016.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
RPC R&D ATLAS-CMS WG4 D. Piccolo, B. Liberti per il WG4 1.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
CMS RPC consuntivo 2014, attivita` e richieste 2015 Stefano Bianco (Resp. Attività RPC ) Laboratori Nazionali di Frascati dell’INFN Gabriella.
CMS DT report preventivi 2015 INFN Sezioni Bologna, Padova, Torino G.M. Dallavalle (INFN Bologna) CMS Muon DT PM 1.
P. Morettini 23/1/2015P. Morettini - R&D Phase II Italia 1.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
Totale FTE tecnico elettronico 1 tecnico meccanico G.C.Barbarin o P.O.KM350% P.Migliozzi1 Ric. INFNKM380% C.MolloAssegno KM3KM380% G.DerosaRic. UKM330%
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
STMan Advanced Graphics Controller. What is STMan  STMan is an advanced graphic controller for Etere automation  STMan is able to control multiple graphics.
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Gagliardi Università degli Studi e INFN Torino
Atlas Spares D.Lucchesi , G.Darbo, P.Lubrano, A.Cardini, P.Giannetti
R&D fase 2 – RPC 4st meeting
ONEDATA - distributed data caching -
Stato del rivelatore di Mu Gruppo 1 – Pisa – Settembre 2008
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
STATUS DHCAL PCB STUDY for RPC and MicroMegas
Il trigger per muoni dell’esperimento CMS
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

RPC Status Outline Barrel installation and commissioning status Trigger installation Full system commissioning - Tower tests - Global runs Gas issues Gas calibration system HV DCS-DQM Richieste

Full system commissioning RPC hardware schema Full system commissioning Trigger Boards in Trigger Crates Splitter PAC GB & Sorter OPTO rec. FPGA (x 6) RMB Sorters GMT DAQ DCC S-Links Data Concentrator Card Tower rack LBBox RBC UXC area Barrel Wheel USC area

Installation All chamber installed except MB2 –MB3 sect 1-7 W-1, W-2 HV cabling replacement (due to wrong connectorization by firm) on going: W0, W-1 done W-2 done by mid-July W+1, W+2 cables ready to be installed by Mid-July Access for installation in August (5 weeks) All LinkBoxes installed YB+1, YB+2 Link boards and CBs, Easy crates and LV modules installed and cabled YB0 boards installation Mid-July. YB-1, YB-2, YE-1 - routing defined, all cables ready;

Installation Installation of Easy-crates and test of HV modules on-going in USC S1. HV multi-conductor cables (UXC-USC) installed and connectorized but W0 (Mid-July) Test done on W+1,W+2 All UX- US fibers delivered, installation YB+ YE+ middle July. Ready for feet patch panel connections (HV cables /fibers) on W+1, W+2, W0.

Trigger hardware Trigger System production Tender for the TBs production: two companies, the test boards are being tested now, Components (incl. FPGAs) should be delivered by the beginning of August In September TBs should be produced and assembled Sorter Crate (full) Trigger Crate (full) DAQ & Control Crate RBC and TTU RBCs boards ready to be installed (End July) The RPC Trigger Board to be used as TTU (Technical Trigger Unit) is almost ready under the hardware point of view. A first release of VHDL code implementing cosmic muon algorithm is ready to be uploaded and tested. Development of the software tasks started and requires some working weeks (Debug in July). Aim to use for triggering purpose in August YB0 – cables routings defined, (current status ???) YB-1, YB-2, YE-1 - routing defined, 90% of cables ready; YE+-3 - routing to be defined (current status ???) 5

Commissioning 5 / 480 chambers Commissioning of the final gas distributor and gas flow equalization Done Sector Test –after installation test: strip connectivity and noise rate, current stability Done W+2 W+1 W0 W-1 W-2 Chamber replacement (gas leak or HV problem) 1 2 On-site major intervention (electronics board/connectors) 5 / 480 chambers Chamber tests after cabling: Test of all LV/DCS cables Done Test after HV cable replacement ongoing on W-, finish by Mid-July W-2, W0 End July W+1, W+2 during access window in August-September By September all chamber on all Wheels would be tested with final cables (HV/LV/DCS cables).

Full system commissioning Test and commissioning from chamber to tower : Tower test Commissioning USC electronics: Trigger and DAQ electronics Installation and test of Software: DCS, DSS , central DAQ, Trigger Commissioning from chambers up to the Link Boards (1) and commissioning of the full DAQ/Trigger chain (2) are performed in parallel in order to be ready for the full system commissioning. Strong needed of detector/software/trigger expert on site in order to fulfill the tight commissioning schedule. Common efforts of Barrel and Forward communities in order to setup global commissioning procedures.

Tower test Detector performance test using the final RPC/trigger system. Readout of detector data via diagnostic readouts from LBs of one tower. Strip Connectivity Test FEB – LB Connectivity Test Noise rate as a function of HV and thresholds DCS with final configuration able to handle full wheel Develop Online XDAQ application Prepare check list and documentation Bottle neck for the full wheel test: Gas flow limited (temporary gas line) Connections YBs to the USC services not done yet. Use temporary cables https://twiki.cern.ch/twiki/bin/view/CMS/RpcTowerTestsResults

Schedule Global run W+2, W+1, W0 complete commissioned by end-October All towers fully commissioned by Feb08 W-1, W-2 cannot be commissioned on the surface due to lack of electronics on surface. More effort will be put on full system commissioning of YBs and YEs. W-1, W-2 tower test will start as soon as possible after lowering (aim to finish End-Nov Global run First partecipation to the GR in July 07: W+2 (10+11 corresponding to trigger sector 9) RBCs-TTU test on W+1 in August W0 (sector 10+ sector 11) Global Run in September W+1 W+2 W0 ( sectors 10 + sector 11 in each wheel) October W+1 W+2 W0 YE+ (Full wedge) November

Gas system status All racks (Mixer, Humidifier, Pump, Pre-distribution, Final distribution) installed and ready Analysis systems: IR analyzer (binos) for iC4H10 to be installed Relative Humidity probe installed and ready Purifier I (molecular sieve): ready, but not commissioned (about 1 week work) Purifier II(Cu/Zn filters): installed in SGX5, but not commissioned ( ~ mid July) Pending issues: Flammable detection system not yet ready. Piping heating in the shaft foreseen in the this weeks

Closed loop system General remarks: There is no doubt that the RPC gas system is complex and it represents one of the key tools for the system operation At the start up some learning period will be necessary to bring the system to a stable state In 2008 low luminosity and “presumably” short running period We have one year work to setup the system and understand operation conditions Combined ATLAS CERN CMS effort Keep level of attention high, but no panic

Closed loop system Possible scenario: Four months run 3 weeks out of four per months Possible scenario: Start with a 50% fresh mixture for the first month (study purification unit) Go to 30 % fresh mixtur2 for the second month Go to 10 % fresh mixture for third and fourth month Total cost at 1 vol/3h: ~ 105 kCHF

Gas calibration Calibration system ready next week moved to CERN. In view of the positive opinion expressed by the INFN ATLAS-CMS review board, we have reiterated the request for a gas-chromatograph

Stato degli Ordini (gare 2003) HV Stato degli Ordini (gare 2003) 2 MAO sono stati già consegnati (W+2 wheel test) Schede HV sono ferme in attesta di risolvere il problema della deriva termica modello ordinati consegnati mancanti SY1525 2 A3485 - MACISTE 3 1 A3512N - HV 80 47 33 BC A1676 7 A3000 - CRATE 34 A3000FB - FAN 14 A3486S - MAO 5 A3009 - LV 60 57

HV Il problema della deriva termica Nel 2006 abbiamo riscontrato tutta una serie di problemi relativi alla lettura della corrente della schede di HV (A3513N) Da qualche giorno la CAEN è riuscita a riprodurre il problema nei suoi laboratori, lasciando le schede accese per una settimana, come da noi suggerito. Ora stanno lavorando alla risoluzione del problema che è sia di tipo software (sincronizzazione) che di tipo hardware (grounding) Entro fine luglio avremo una schema completo dei problemi e delle possibili soluzioni

DCS-DQM Il sistema dei DCS degli RPC è stato integrato in quello di CMS a fine giugno ed è attualmente in test a P5 I 3 servers finanziati dall’INFN stanno lavorando senza problemi a P5 G. Polese è il nuovo responsabile del sistema I databases online sono in fase di test per quanto riguarda la parte relativa al rivelatore Tutti gli istogrammi già sviluppati per il MTCC sono stati integrati nella nuova struttura ad albero della GUI (IGUANA) E’ stato poi sviluppato un sistema di warning and alarm Definizione di un set limitato di plot che possa dare una overview dell’intero sistema

Richieste ME

Richieste MOFB Spare HV/LV Sistema base Spare Spare 2007 Costo 2007 SY1527 2 1 10.036 A3009 60 6 9.000 4 18.000 A3512N 80 5 23.230 MAO 5.271 A3485 3 4.278 A3000 34 3.000 A1676 7 2.447 TOTALE 24.307 € 50.955 €

Richieste MOFB