LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.

Slides:



Advertisements
Presentazioni simili
Centro Internazionale per gli Antiparassitari e la Prevenzione Sanitaria Azienda Ospedaliera Luigi Sacco - Milano WP4: Cumulative Assessment Group refinement.
Advertisements

P. Sarti, C. Abbondanza, S. Montaguti, M. Negusini, L. Vittuari
L’esperienza di un valutatore nell’ambito del VII FP Valter Sergo
Cache Memory Prof. G. Nicosia University of Catania
Teoria e Tecniche del Riconoscimento
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Frontespizio Economia Monetaria Anno Accademico
Udine 1 Udine – Richieste Attivamente coinvolti totali 3FTE M.P.Giordani, P.Palestri, L.Selmi A.Micelli (dottorando) A.Cristofoli (laureando.
R P Rivelazione Acustica Particelle A bassa temperatura e in Superconduttori Sommario problematica e risultati Nautilus Attivita svolta Programma del prossimo.
Dipartimento di Matematica Applicata Università di Firenze Multiband transport models for semiconductor devices Giornata di lavoro sulle Nanoscienze Firenze.
1 A neural approach to the analysis of CHIMERA experimental data CHIMERA Collaboration S.Aiello 1, M. Alderighi 2,3, A.Anzalone 4, M.Bartolucci 5, G.Cardella.
CSN giugno Comunicazioni Riunione R-ECFA ai LNF 21&22 maggio; buona impressione data dallEnte. Follow-up? Giornata PT ai LNGS 3&4.
Biometry to enhance smart card security (MOC using TOC protocol)
Corso di Laurea in Ingegneria Elettronica - U niversità di N apoli F EDERICO II Autori XXXXX XXXXXXX YYYYY YYYYYYY ZZZZZ ZZZZZZZ Titolo tesina Parte X:
Costruzione di Interfacce Lezione 10 Dal Java al C++ parte 1
TIPOLOGIA DELLE VARIABILI SPERIMENTALI: Variabili nominali Variabili quantali Variabili semi-quantitative Variabili quantitative.
Ufficio Studi UNIONCAMERE TOSCANA 1 Presentazione di Riccardo Perugi Ufficio Studi UNIONCAMERE TOSCANA Firenze, 19 dicembre 2000.
The anti-neutrino discoveryinverse beta decay 2300 MW reactor usful flux Inverse -decay cross section? how can we get it?
Golden Decay mode 130 GeV/c2 < MH < 2 MZ
Napoli 16 dicembre 2008v. Canale - Riunione Annuale di Gruppo 11 Esperimento ATLAS: status e piano 2009 Panoramica dello stato dei sottositemi di ATLAS.
Dafinei_Otranto2012_Lesson-2 Ioan Dafinei INFN Sezione di Roma, ITALY OTRANTO Settembre 2012 XXIV SEMINARIO NAZIONALE Di FISICA NUCLEARE E SUBNUCLEARE.
SPETTROSCOPIA FISICA AMBIENTALE 2 Antonio Ballarin Denti
2000 Prentice Hall, Inc. All rights reserved. 1 Capitolo 3 - Functions Outline 3.1Introduction 3.2Program Components in C++ 3.3Math Library Functions 3.4Functions.
Metodi statistici per lo studio delle direzioni darrivo di muoni in MACRO Monica Brigida Università di Bari & INFN Via Amendola 173 – BARI.
1 Astroparticle Physics in Space Claudia Cecchi Dipartimento di Fisica e Sezione INFN, Perugia Workshop Nazionale La Scienza e la Tecnologia sulla Stazione.
Laurea specialistica in Scienza e Ingegneria dei Materiali
Applicazioni dell'Elettronica basata sul Diamante _________________________________________ Arnaldo Galbiati SOLARIS PHOTONICS Alkaline Solar Cells and.
Rivelatori a stato solido basati su diamante per applicazioni su raggi X Buongiorno a tutti !!! Scopo di questa presentazione e mostrarvi alcuni dei.
Firenze - 4 Luglio 2005Lesperimento LHCf LHCf: un esperimento per la fisica dei raggi cosmici ad LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento.
LHCf: un esperimento per la fisica dei raggi cosmici ad LHC
A B C Fascio continuo Energia GeV 200 A, polarizzazione 75-85% 1499 MHz Distribuzione simultanea in 3 sale.
S. Bolognesi (1) from CMS A. Di Simone (2) from ATLAS 1 Università di Torino ed INFN Torino 2 Università di Roma Tor Vergata ed INFN Roma 2 V workshop.
7 N. Dinu, E. Fiandrini and L. Fano' Overview of the electrical characterization of AMS/CMS silicon microstrip detectors, Nota INFN AE-06/1.
Ettore Vittone: Dip. Fisica Sperimentale, Università di Torino; A.A Fisica dei Dispositivi Elettronici e Sensori; Laurea in Fisica; Fisica Stato.
VII EBRCN GM, Berlin, 26-28/09/20041 EBRCN Site: current status Béatrice Dutertre Questa presentazione può essere utilizzata come traccia per una discussione.
Ischia, giugno 2006Riunione Annuale GE 2006 Exploiting the Body Effect to Improve Analog CMOS Circuit Performances *P. Monsurrò, **S. Pennisi, *G.
Scheda Ente Ente Privato Ente Pubblico. 2ROL - Richieste On Line.
UNIVERSITÀ DEGLI STUDI DI PAVIA FACOLTÀ DI ECONOMIA, GIURISPRUDENZA, INGEGNERIA, LETTERE E FILOSOFIA, SCIENZE POLITICHE. Corso di Laurea Interfacoltà in.
Motor Sizing.
Prospettive delle attivita' di Astrofisica Nucleare con Recoil Mass Separators Prospettive delle attivita' di Astrofisica Nucleare con Recoil Mass Separators.
Last quarter work and future activities
MILANO Single step D=400mm, f=40°Diag From a message of Levacher about next step thermal analysis for the baffle can be allocated a space of.
LHCf Status Oscar Adriani CSN1,MIlano, 26 Marzo 2013.
Enzo Anselmo Ferrari By Giovanni Amicucci. Di Enzo Questo è Enzo Anselmo Ferrari. Enzo compleanno è diciotto febbraio Enzo muore è quattordici agosto.
Status del b-tagging Alessia Tricomi per il gruppo btagging Consorzio INFN, Firenze 7 Settembre 2001.
UG40 Energy Saving & Twin Cool units Functioning and Adjustment
LHC-f Referee M.Biasini, P. Checchia 17 Settembre 2009 Riunione CSN1 Risultati 2009 Strategia run / Resistenza radiazione Proposte finanziarie 2010 Milestone.
Lezione n°27 Università degli Studi Roma Tre – Dipartimento di Ingegneria Corso di Teoria e Progetto di Ponti – A/A Dott. Ing. Fabrizio Paolacci.
Neutron Instrumentation Carla Andreani Universita’ degli Studi di Roma Tor Vergata-Dip. Fisica e Centro NAST.
Scenario e Prospettive della Planetologia Italiana
Final Review Meeting Livorno, Italy January 30-31, 2012
1 Acceleratori e Reattori Nucleari Saverio Altieri Dipartimento di Fisica Università degli Studi - Pavia
Il Futuro The Future Tense.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
1 Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - Napoli 23 Settembre Angelo Scribano TOTEM – settembre 2005.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
3 Luglio 2006LHCf – CSN1 CataniaO. Adriani Status report di LHCf O. Adriani Catania, CSN1, 3 Luglio 2006 Un po’ di storia – Technical report TDR Approvazione.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
THE LIGHT How does the light propagate?. 1)To verify that light propagates in straight lines 2)To compare an object with its projection on a rigid screen.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Michele Iacovacci (Napoli),
The scattering vector from a single atom is known as the atomic scattering factor. It is denoted f, and has length |f| and phase . The resultant.
Gigi Cosentino - LNL 20 ottobre 2016
Accelerator Disision March 3rd 2015
Atlas Milano Giugno 2008.
Preliminary results of DESY drift chambers efficiency test
Transcript della presentazione:

LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica dellUniversità degli Studi di Firenze Frascati, CSN1, 26 Giugno 2007

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report INTERACTION POINT Beam line Detector II TungstenScintillator Silicon strips Detector I TungstenScintillator Scintillating fibers 140 m Experimental Method: 2 independent detectors on both sides of IP The direct measurement of the production cross section as function of p T is essential to correctly estimate the energy of the primary cosmic rays (LHC: eV) Simulation of an atmospheric shower due to a eV proton.

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Detector # 2 4 pairs of silicon microstrip layers (6, 12, 30, 42 r.l.) for tracking purpose (X and Y) impact point We use LHC style electronics and readout 16 scintillator layers (3 mm thick) Trigger and energy profile measurements Absorber 22 tungsten layers 7mm thick 44 X 0 (1.6 I ) in total (W: X 0 = 3.5mm, R M = 9mm) 2 towers 24 cm long stacked on their edges and offset from one another Lower:2.5 cm x 2.5 cm Upper: 3.2 cm x 3.2 cm Energy < 400 rad < 400 rad

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Performances of the LHCf Detector SciFi Position Resolution Energy Resolution Measured at the SPS Beam Test in 2004 LHCf can measure (and provide to LHC) the center of neutral flux from the collisions If the center of the neutral flux hits LHCf << 1 mm resolution << 1 mm resolution

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report 0 mass resolution 0 mass resolution Arm #1 E/E=5% E/E=5% 200 m spatial resolution m/m = 5% m/m = 5% 2 identified in the 2 towers

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Monte Carlo ray energy spectrum (5% Energy resolution is taken into account) (5% Energy resolution is taken into account) 10 6 generated LHC interactions 10 6 generated LHC interactions 1 minute 29 cm -2 s -1 luminosity Discrimination between various models is feasible Quantitative discrimination with the help of a properly defined 2 discriminating variable based on the spectrum shape (see TDR for details)

Where are we with the detectors?

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Where we are with Arm1? Arm1 was fully assembled in Japan in July 2006 (scintillators + fibers + Tungsten) and fully tested at CERN in August 2006 beam test

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Where we are with Arm2? o Arm2 was partially assembled in Florence in July 2006 and brought to CERN for the Beam Test of August 2006 o Arm2 was fully assembled in Florence in April 2007

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Front Counter (Both for Arm1&2) read by a MAPMT R7600U-00-M4

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report The mechanics of the module Silicon sensor Hybrid circuit Pace Chips Kapton fanout SiliconX SiliconY Tungsten Light Guides + Scintillators 25 mm

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Readout electronics LHC style electronics (Many thanks to CMS!!!!) DOHCCUPLLDCU… PACE3 chips (CMS preshower) We have developed Hybrid circuit (Left+Right)Hybrid circuit (Left+Right) Mother Board (Logic)Mother Board (Logic) Adc Piggy Back boardAdc Piggy Back board DAQ: 100 Mbit/s optical link VME Readout 100MbitOpticalLink

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Now the real installation in LHC… Pre-Installation dates have been fixed in Fall 2006 –LSS1L (Arm1) o 8/01/2007 to 26/01/2007 FINISHED! –LSS1R (Arm2) o 23/04/2007 to 11/05/2007 FINISHED The dates for the final installation are still under discussion (after the beam test in August/September, may be beginning of 2008?) The idea is that installation takes place in 2 steps: Pre-installation Final installation In between the 2 installation the baking out of the beam pipe will be done (200 o C), so the detectors should be removed

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Before pre-installation a long preparatory job has been necessary: –Modifications of the TAN –Transport machine / Fork lift –Cables and fibers from USA15 to tunnel o Most of the control electronics and all the power supply system are located in the USA15 Atlas control room o > 200 m distance!!! o All the necessary cables have been pulled (~100 cables!!!) o All the connectors have been mounted o All the optical fibers have been installed –Electronic racks in USA15

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report TAN slot before and after CU bar removal

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Arm1 pre-installation From 8/01/2007 to 26/01/2007 No major problems came out Cables OK Transport and installation OK Laser calibration OK Power supply from USA15 OK Manipulator and movements OK Arm1 was dismounted at the end

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Transport and insertion in the TAN

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report LHCf Arm 1 – Installation completed within 15 minutes!

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Arm2 pre-installation From 23/04/2007 to 11/05/2007 No major problems came out Quartz fibre for calibration is damaged should be replaced Cables OK Transport and installation OK Laser calibration OK locally TBD from remote TBD from remote Power supply from USA15 OK Manipulator and movements OK No interference with BRAN Arm2 was dismounted at the end Explicit request from TS/LEA: Speed up the cabling connection time! Some work is in progress for this (Splitter box, Distribution board) A second pre-installation is foreseen in Autumn

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report TANUSA15 High Current Cables Sense wires Power Supply High Voltage Splitter Box ~ 240 m Thermistors Control PC MB + ADC TSC+FEC VME Crate Monomode Optical Fibers DOH Multimode Optical Fibers Distribution Board Power Thermistors Signal + Control Arm2 Readout and control scheme for Arm2 Silicon

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report General LHCf DAQ scheme LHCf Rack Allocation in USA15

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report What do we have to do? Final commissioning of the electronics (modifications to the logic, complete the PCBs, distribution board etc.) Final commissioning of the electronics (modifications to the logic, complete the PCBs, distribution board etc.) Installation of the new splitter box in the tunnel Installation of the new splitter box in the tunnel Some work in USA15 and TAN region to speed up the interconnection time Some work in USA15 and TAN region to speed up the interconnection time Final DAQ software common with Japan people Final DAQ software common with Japan people Monitoring program Monitoring program Test beam with final apparatus (August 24, September 11) Test beam with final apparatus (August 24, September 11) Second pre-installation to test the modifications done after the first pre-installation Second pre-installation to test the modifications done after the first pre-installation Final installation: schedule is under discussion (December? January 2008?) Final installation: schedule is under discussion (December? January 2008?)

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Milestones dei preventivi /02/ /02/2007 –completamento dei moduli al silicio FATTO! 30/06/ /06/2007 –Preinstallazione e commissioning di LHCf nella TAN compatibilmente con le tempistiche della macchina FATTO! 31/12/ /12/2007 –Installazione finale e presa dati a bassa energia compatibilmente con la macchina –Installazione finale e presa dati a bassa energia compatibilmente con la macchina Installazione prevista per la fine dellanno (inizio 2008?) Installazione prevista per la fine dellanno (inizio 2008?) presa dati sicuramente NO! presa dati sicuramente NO!

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report 2007 Test Beam 3 settimane di Test Beam (24/08 – 11/09) 3 settimane di Test Beam (24/08 – 11/09) SPS H4 SPS H4 Scopo: Scopo: –Calibrazione assoluta in energia di Arm1 & Arm2 utilizzando più energie possibili per gli elettroni (50 GeV – 250 GeV) –MIsura di E/E per protoni –Misura congiunta LHCf-BRAN (ultimi giorni di test LHCf – Primi giorni di test BRAN) –MIsura diretta di produzione 0 con target leggero?

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status ReportMoney…. Per questo lascio la parola ai referee… Ma prima un breve commento: Principale problema riscontrato per il controllo dei costi: Mancanza di stime precise per le spese necessarie per linstallazione. I lavori vengono svolti da ditte esterne sotto il controllo della divisione TS I costi preventivati normalmente non vengono rispettati (difficoltà nellinstallazione, allarmi di evacuazione nel tunnel, extra costi ….) Continua negoziazione per laccettazione e la ripartizione delle spese tra i vari utenti (Atlas, LHCf, CERN) 2006: Problema del costo aggiuntivo dei cavi 2007: Problema del costo aggiuntivo delle fibre 2008: Speriamo nessun problema!!!! Necessità di un accordo ufficiale con Atlas e il Cern per le spese per gli anni futuri?

Back up Slides

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Detector #1 16 scintillator layers (3 mm thick) Trigger and energy profile measurements Absorber 22 tungsten layers 7mm thick 44 X 0 (1.6 I ) in total (W: X 0 = 3.5mm, R M = 9mm) 4 pairs of scintillating fiber layers for tracking purpose (6, 10, 30, 42 r.l.) Energy Impact point ( ) 2 towers ~24 cm long stacked vertically with 5 mm gap Lower:2 cm x 2 cm area Upper: 4 cm x 4 cm area < 300 rad

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Energy spectrum of π 0 expected from different models (Typical energy resolution of is 3 % at 1TeV)

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Clear CR signal separation (20ADC by 2249W ~ 5pC)

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Model dependence of neutron energy distribution Original n energy 30% energy resolution

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Installation of the detectors in the TAN absorbers at 140m from IP1 96 mm LHCf

The LHCf operation in LHC

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report Optimal LHCf run conditions Beam parameters used for commissioning are good for LHCf!!! Beam parameter Value # of bunches Bunch separation > 2 sec Crossing angle 0 rad 0 rad 140 rad downward Luminosity per bunch < 2 x cm -2 s -1 < 2 x cm -2 s -1 Luminosity ~10 30 cm -2 s -1 ~10 30 cm -2 s -1 Bunch intensity 4x10 10 ppb ( *=18 m) 1x10 10 ppb ( *= 1 m) No radiation problem for 10kGy by a year operation with this luminosity

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report From R. Bailey presentation at January 2007 TAN workshop Stage 1 Optimal conditions for LHCf running!

Oscar Adriani Frascati, 26 Giugno CSN1 LHCf Status Report LHCf proposed running scenario Phase-I Phase-I Run since the very beginning of LHC operations (Stage 1, 43 bunches) Run since the very beginning of LHC operations (Stage 1, 43 bunches) Remove the detector for radiation issues when the machine goes to the Stage II (luminosity reaches cm -2 s -1) and reinstall the 3 Cu bars Remove the detector for radiation issues when the machine goes to the Stage II (luminosity reaches cm -2 s -1) and reinstall the 3 Cu bars Phase-II Phase-II Re-install the detector at the next opportunity of low luminosity run after removal of Cu bars (Totem dedicated runs? Possible LHCf dedicated runs?) Re-install the detector at the next opportunity of low luminosity run after removal of Cu bars (Totem dedicated runs? Possible LHCf dedicated runs?) Phase-III Phase-III Future extension for p-A, A-A run with upgraded detectors? Future extension for p-A, A-A run with upgraded detectors? We are continously in touch with Machine and ATLAS peoples to agree on detailed running scenario