TOPEM (PET TOF probe, compatible with MRI and MRS for diagnosis and follow up of prostate cancer) F. Garibaldi - c.d. s. Roma1, 09-07-2010 PSA SENSITIVITY.

Slides:



Advertisements
Presentazioni simili
Termodinamica Chimica
Advertisements

V.I.D.E.O. Video-CV to Increase and Develop Employment Opportunities
Annual Burden of device 50 to 80 high-risk (class III) devices receive FDA approval annually 3500 medium-risk (class II) products are approved for marketing.
R P Rivelazione Acustica Particelle A bassa temperatura e in Superconduttori Sommario problematica e risultati Nautilus Attivita svolta Programma del prossimo.
La validità di un test diagnostico
Progetto MATISSE MAmmographic and Tomographic Imaging with Silicon detectors and Synchrotron radiation at Elettra Tomografia Digitale per la diagnosi di.
F.Garibaldi – TOPEM phone meeting Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved.
TOPEM TOF- PET MRI for prostate cancer diagnosis and follow up Sezioni partecipanti: Roma1, Gr. Coll. ISS, Genova, Bari, LNS Il cancro della prostata e.
Sezioni partecipanti: Roma1, Gr. Coll. ISS, Genova, Bari, LNS
Sistema di calibrazione temporale Trasmissione del Clock e del tempo assoluto Nemo Fase1.
-1- CdSez prev /7/03 Un caso ideale: K l Unici per theoretical cleanliness u Contributi long range assenti u Correzioni QCD ben calcolabili u H eff.
Radiografia digitale.
Queuing or Waiting Line Models
ASIC per TOF-PET: caratteristiche generali
Aggiornamento misure timing Sipm Hamamatsu – LYSO con sorgente 22Na
TOPEM Meetings Catania,
Positron Emission Tomography (PET)
would solve the problem
Imaging molecolare con radionuclidi: rivelatori ad alta risoluzione nella diagnosi precoce e programmazione terapeutica del cancro della mammella La Medicina.
50×50 mm 2 CsI(Tl) 0.8 mm pitch M = 2, FoV = 25×25 mm 2 50×50 mm 2 LaBr 3 (Ce) 4 mm thick, 3 mm thick window M = 2, FoV = 25×25 mm 2 50×50 mm 2 CsI(Na)
TOPEM Rome meeting Informazioni da Mozinski: Hi Franco, Timing tests are done with a small LSO (3x3x3 mm). Timing is improved down to 220 ps.
Quality Assurance della Strumentazione di Medicina Nucleare.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Tomografia al Seno con Luce di Sincrotrone
Front-End VLSI CMOS 0.35mm per dispositivi SiPM mirato ad applicazioni TOF con soglia regolabile ed ampio range dinamico. Davide Badoni – INFN Roma Tor.
Capitolo 20: Sistemi multimediali
Motor Sizing.
Come fanno i ricercatori a vedere le particelle?
1 st workshop on “Photon Detection” Perugia 2007
(1)applicazioni allastronomia X su satelliti (in collab con lINAF ). LOFT (Large Observatory for x-ray timing), ESA M3 mission. (2)e alla bio-medicina.
Production of 8x8 SiPM matrices
Distribuzione del numero di alleli condivisi da coppie di fratelli e di non-parenti tipizzati rispettivamente per 5, 9 e 13 markers.
MOIRA (Molecular Imaging with Radionuclides) , terzo anno - scopo: costruzione del prototipo di un rivelatore ideale per SPECT per small animal imaging.
Active surveillance for low risk prostate carcinoma
26 settembre 2003Commissione Scientifica Nazionale I 1 KOPIO: Relazione dei referee Anna Di Ciaccio, Enrico Graziani Commissione Scientifica Nazionale.
INSIDE UPDATES M. Giuseppina Bisogni PISA, 16/09/2014.
Ontologia AA F. Orilia. Lez. 16 Discussione dell'approccio controfattualista di lewis condotta da Antonio De Grandis.
Cancer First-second most common cause of death in Western world One in 2-3 Western people will die of cancer.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
From wood the energy of the Sun. Dal legno l’energia del Sole Il legno fa parte delle biomasse ed è una delle fonti energetiche rinnovabili più utilizzata,
Digital Pulse Processing (DPP) in Fisica Nucleare
SUMMARY Interfacing typologies RIEPILOGO Tipologie dell’interfacciamento RIEPILOGO Tipologie dell’interfacciamento.
Danilo Domenici G.Bencivenni, M.Calvetti, C.D’Ambrosio, M.Poli Lener The HPPC: a proposal for a new gaseous detector for Positron Emission Tomography with.
Un problema multi impianto Un’azienda dispone di due fabbriche A e B. Ciascuna fabbrica produce due prodotti: standard e deluxe Ogni fabbrica, A e B, gestisce.
Accoppiamento scalare
Come capire quando le prove funzionali non sono attendibili Riccardo Pistelli Università Cattolica - Roma.
SUMMARY Time domain and frequency domain RIEPILOGO Dominio del tempo e della frequenza RIEPILOGO Dominio del tempo e della frequenza.
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
SUMMARY Quadripoles and equivalent circuits RIEPILOGO Quadripoli e circuiti equivalenti RIEPILOGO Quadripoli e circuiti equivalenti.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
F. Palla INFN Pisa CSN 1 - Roma - 16 maggio 2006 PRIN06 - Un Super Tracciatore per CMS Titolo e composizione  Un Super-Tracciatore per SLHC  Pisa (G.
03 Aprile 2009 Dispositivi per Imaging Molecolare / ISS-TeSa 1 Distretto Bioscienze Lazio Rivelazione preclinica di tumori alla mammella … E. Cisbani Istituto.
MUG-TEST A. Baldini 29 gennaio 2002
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
SUMMARY Thyristors RIEPILOGO I thyristor RIEPILOGO I thyristor.
SUMMARY Different classes and distortions RIEPILOGO Le diverse classi e le distorsioni RIEPILOGO Le diverse classi e le distorsioni.
- ore 11: :45 F. Garibaldi - Introduzione e stato dell'arte dell'esperimento - ore 11: :30 A. Gabrielli - Presentazione della catena HPTDC-NINO.
SUMMARY Real operational amplifiers RIEPILOGO Amplificatori operazionali reali RIEPILOGO Amplificatori operazionali reali.
SUMMARY Starting systems RIEPILOGO Sistemi di avviamento RIEPILOGO Sistemi di avviamento.
Lezione n.7 (Corso di termodinamica) Cicli Diretti.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
SUMMARY Checking RIEPILOGO Verifiche RIEPILOGO Verifiche.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
Laboratorio New Imaging X-ray Techniques (NIXT) dell’ENEA-Frascati D. Pacella RAIN15.
STMan Advanced Graphics Controller. What is STMan  STMan is an advanced graphic controller for Etere automation  STMan is able to control multiple graphics.
Lepton Flavour MEG A. Baldini CSN1 22 Nov. 2011: GGI.
The FOOT Calorimeter No TOF, high density and good energy resolution -> BGO TOF asks for 1.2 m lever arm -> R = 20 cm with 100 angular aperture of the.
PROBLEMA: Lo slow shaper, o comunque qualcosa tra preamplificatore e ADC, mostra un guadagno almeno dieci volte inferiore a quello dichiarato per MAROC3.
Preliminary results of DESY drift chambers efficiency test
Transcript della presentazione:

TOPEM (PET TOF probe, compatible with MRI and MRS for diagnosis and follow up of prostate cancer) F. Garibaldi - c.d. s. Roma1, PSA SENSITIVITY 83% SPECIFICITY 17% it is the only case fr cacer diagnosis made from tissue obtained on a blind biopsy !! Prostate cancer is the most common cancer and the second leading cause of cancer death The solution PET – TOF MRI/MRS endorectal probe, coupled to external detector(s) and standard PET drawback of the standard PET - detectors far away from prostate - poor spatial resolution (6 – 12 mm) - poor photon detection efficiency (<1%) - activity ouside the organ -> poor contrast resolution huge background from the bladder Could we reduce or eliminate it? Multimodality approach is needed TOF (< 300 ps FWHM ! ) would solve the problem In practice there is nothing reliable for diagnosis and follow up

Why TOF ? - TOF provides huge performance increase! Can localize the source along line of flight. With 300 ps FWHM, 4.5 cm (just the dimension of the prostate) (in a certain sense one doesnt see the bladder) - Fast convergence (reduced scan time) First results from Catania (LNS) We are almost there! we will improve Improvements in clicnical images (600 ps)

Limited space for the PET detector PET detector must not use magnetic materials -> Could distort MR imagge PET detector must not emit in MR frequency Could produce MR image artifacts MR-compatible PET shielding materials Could distort MR image MR gradient field-eddy currents Could produce noise in detector Could heat detector MR RF transmit Could produce false PET events MR materials Will produce more gamma attenuation - CITRATE that is present in the normal prostate -CREATINA that may increase in the phlogosis and all the proliferative processes -COLINE specific for a neoplastic transformation Effetti della PET su MRI e viceversa B. Pichler et al. Simultaneous PET-MRI, a new approach Nature Medicine Vol 14, N 4, April 2008 I n conclusion, our results confirm that simultaneous PET and high- field-strength MR imaging with LSO-APD–based PET detectors is feasible without sacrifici the quality of images obtained with either system. The next step will be to focus on the evaluation of the full- ring PET insert. While this work was concentrated on small-animal PET/MR imaging, our results can be transferred to a clinical system, where MR imaging is usually performed at a much lower magnetic field strength. The combination of PET and MR imaging can open new opportunities in preclinical research and clinical diagnosis. When nuclear MR spectroscopy is used with MR imaging and PET, trimodal imaging might be possible and thereby add even more information in biomedical research studies, a new way for a new perspectives in molecular imaging I problemi dellimpatto relativo PET-MRI sono risolti nostri test primi Settembre a Tor Vergata

Figure 2. The figure shows three typical spectra acquired using the same reverse bias voltage (32.0V), but the detector thermostated at different temperatures: a) 13.5C, b) 24.3 C, c) 41.5C. Gain reduction with temperature is due to the variation of breakdown voltage with temperature. Fig.2 Variazione della tensione di breakdown in funzione della temperatura Fig.3 Variazione di guadagno al variare dellovervoltage Misure di caratterizzazione dei SIPM, Roma1 (Meddi) Si deve monitorare la temperatura, variare la tensione e possibilmente raffreddare (37 gradi gradi) (limitare noise e quindi necessita di soglia elevata (effetto sul timing (bisogna triggerare su pochi p.e.) progetto e costruzione del sistema di raffreddamento e del sistema di controllo della temperatura per il 2011

Simulazioni (Roma1 – ISS) BGO_nonzero :1012 LSO_nonzero :3668 LSO_single = 1886 BGO_single = 634 LSO_BGO_coincidence = 33 Only_BGO 905 BGO_nonzero :1105 LSO_nonzero :2351 LSO_single = 1184 BGO_single = 718 LSO_BGO_coincidence = 31 Only_BGO 1026 BGO_nonzero :1065 LSO_nonzero :2376 LSO_single = 1269 BGO_single = 697 LSO_BGO_coincidence = 35 Only_BGO 977 BGO_nonzero :1142 LSO_nonzero :1282 LSO_single = 705 BGO_single = 773 LSO_BGO_coincidence = 0 Only_BGO 11 center source BGO_nonzero :1037 LSO_nonzero :6523 LSO_single = 3413 BGO_single = 645 LSO_BGO_coinc. = 65 Only_BGO 869 Da progettare e costruire nel 2011 il sistema di raffreddamento ( gradi) FOV Coerente con aumento di efficienza del sistema probe + PET esterna ris. spaziale del sistema fortemente dipendente dalla risoluzione del probe -> 1mm – 1.5 mm

- misure elementari utili per la scelta della geometria (pixel identification etc) [ LYSO continuo vs LaBr3 (non ancora a disposizione)] - sandwitch di due rivelatori ~ 15 x 15 x 5 mm3 visti da 4 arrays di SiPM (minimizzazione DOI) - test di compatibilita PET MRI (entro meta Settembre): rivelatore e sk collegati con cavi di 2.5 m con lelttronica - impatto PET su MRI - impatto MRI su PET - LYSO 3 x 3 mm2 pixel ; SiPM Hamamatsu (3 x 3 mm2 pixel) - Readout (single photon) per PSPMT Roma1-ISS minirivelatore SensL Hamamatsu_new Hamamatsu Misure Settembre – Dicembre 2010

4 richieste dei referees a) realizzazione di un rivelatore PET composto da due testate delle dimensioni di circa 2 x 2 cm2 con cristalli pixellati di LYSO/LSO e lettura della luce di scintillazione mediante array di SiPM; b) verifica della sua compatibilita con MRI mediante test degli effetti del campo magnetico sull_imaging PET e degli effetti dell_apparato PET - MRI; c) studio della coincidenza temporale con SiPM per valutare i vantaggi della tecnica TOF sull_imaging prostatico; d) progettazione di un front-end integrato per la lettura e lanalisii del timing dei SiPM. La Commissione ritiene che i risultati dello studio di fattibilita siano vincolanti ai fini del prosieguo dell_esperimento. Tutte le richieste dei referees sono (o saranno a breve) (come in parte mostrato in precedenza) soddifatte entro Settembre caratterizzazione Hamamatsu - prima misura pixel identification in campo magnetico con (3 Tesla, Tor Vergata) - progettazione di un front end integrato per la lettura ed analisi dei SiPM entro Dicembre studio della coincidenza temporale con SiPM (gia in parte fatto) per valutare i vantaggi della tecnica TOF sull_imaging prostatico (questo, sara facile spiegare ai referees, non puo avvenire che a fine progetto). I vantaggi sono per altro, come mostrato evidenti anche da immagini cliniche con risoluzione temporale di 600 ps. Noi faremo 300 ps o meno) costruzione di due rivelatori in dimensioni reali - 25 x 50 x 5 (10) mm3(moduli di array SiPM Hamamatsu con area morta minimizzata) - 50 x 50 x5 (10) mm3 (la matrix della SenSL (pitch 3 x 3 mm2)) - scintillatori (LYSO 3 x 3 x 5(10) mm3) (e il prototipo 0 (senza ASIC); dovrebbe seguire il prototipo (2012) (con ASIC) e il prototipo 2 ingegnerizzato a fine 2013) - elettronica: scheda ibrida finale (Ge e Bo) (dual layer 5 mm LYSO per miglior risoluzionee Deept Of Interaction (DOI) (512 ch) - ASIC minimal implementation : preamp-discriminators. Elevata densita di canali per processamento off-detector goal: ASIC finale con tutte le funzionalita (ADC + TDC) (minimal wiring, serial communication). (Bari+Bo (+To) ) ( ) confronto con moduli 3 x 3 mm2 IRST se disponibili parte front end gia progettata

Richieste per il 2011 (approssimative, cifre analoghe per il 2012)(e un progetto triennale Bari: misure timing co PMT, caratterizzazione scintillatori, ASIC (front end) Bo: progetto e costruzione sk ibrida per timing (coll. Con INFN Ge), da utilizzare in attesa dellASIC finale (in collaborazione piu larga (INFN To ed altri) Ge: progetto e costruzione sk ibrida per timing (coll. Con INFN Bo), da utilizzare in attesa dellASIC finale (in collaborazione piu larga (INFN To ed altri). Simulazione Genat4(e Gate) in collaborazione con Roma1/ISS) LNS: caratterizzazione SiPm (PDE, ris. in energia, misure di timing) Roma1/ISS: simulazioni Geant4(e Gate) in collaborazione con Genova. Misure di base su minirivelatori prototipo. Progetto e costruzione del Prototipo_0 e misure di test per timing. Costruzione di un fantoccio PET-MRI. Misure di compatibilita PET MRI (collaborazipne con Universita di TOV). Misure di caratterizzazione di SiPm (Temperatura). Progetto e costruzione del sistema di raffreddamento e del sistema di controllo/monitoring/feedback della temperatura