Scaricare la presentazione
La presentazione è in caricamento. Aspetta per favore
PubblicatoRuggero Fortunato Modificato 8 anni fa
1
Preventivi 2011 VIRGO Pisa
2
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
3
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
4
Evoluzione della sensibilità di VIRGO
5
VSR1 VSR2
6
VSR2 Duty Cycle
7
Noise Budget
8
Monolithic Suspensions July 2010 – Half 2011 (VSR3)
9
LSC-VIRGO -VSR1 Analysis VSR1 Network
10
LSC-VIRGO -VSR1 Analysis Link to P.Shawnan Review http://sites.google.com/site/amaldiproject8tuesday623/presentations-1 VSR1 Network
11
LSC-VIRGO -VSR1 Analysis Continuous Waves CRAB - No more than 4–6% of the spin-down energy is going into GW emission VELA – Results under review
12
< 3.6 per year Bursts Placed limit on GW energy spectral density: 0 < 6.5 × 10 –5 Stochastic
13
Coalescing Binaries GRB 070201 –Short, hard gamma-ray burst –Consistent with being in M31 –Leading model for short GRBs: binary merger involving a neutron star –Searched for both inspiral and burst signals –No plausible GW signal found
14
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
15
Increase sensitivity by 10 (NS-NS horizon 150 MpC) Start the data taking with Advanced LIGO (2015) AdV Goals
16
AdV Baseline Heavier mirrors High finesse Larger beam waist Signal recycling Fused silica suspensions HP Laser
17
Costs 20.6 M€ Mirrors Vacuum Suspensions Infrastr.
18
Virgo/LIGO+ 2010 NS/NS detectable at 300 Mpc Advanced Network 2014 Virgo NS-NS NS-BH BH-BH Event Rate 3/yr - 4/day 1/yr - 6/day 3/month - 30/day Range (Mpc) 300 750 z=0.45
19
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
20
Composizione del Gruppo ~ 20 FTE NameFTEAuthorStudentActivity Basti Andrea30%YesNoSA Mechanics Bitossi Massimiliano50%YesNoSA Electronics Boschi Valerio100%YesNoSA Electronics Bradaschia Carlo100%YesNoOutreach coordinator, Vacuum syst., Adv.SA Braccini Stefano100%YesNoCW DA, Adv. SA Cella Giancarlo100%YesNoDA, Stochastic background coordinator, CW DA Colacino Carlo Nicola100%Yes DA, Stochastic background Di Lieto Alberto40%YesNoSilicon fibres, Phase Cam., High Power Laser Di Virgilio Angela40%YesNoGyrolaser Ferrante Isidoro100%YesNoCW Data analysis Fidecaro Francesco100%YesNoProject Leader Frasconi Franco80%YesNoAdv.SA & Cryogenics Gennai Alberto80%YesNoCommissioning (Control electr.), Adv.Electronics Giazotto Adalberto100%YesNoVIR-LIGO Liason, Tiltmeters, Adv. SA Mantovani Maddalena100%Yes Commissioning (Alignment) Passaquieti Roberto100%YesNoCommissioning & Run coord., Cryogenics & Adv.SA Passuello Diego80%YesNoCommissioning (Control electr.), Adv. Electronics Paoletti Federico *100%YesNoCommissioning (Control electr.), Adv.Electronics Poggiani Rosa70%YesNoEinstein Telescope Shore Steven20%No Data analysis theory, GW sources distribution Toncelli Alessandra50%YesNoR&D on silicon fibres, Phase camera Tonelli Mauro50%YesNoPhase cam., HP Laser, Thermal noise R&D Torre Oriella100%Yes CW Data Analysis Vajente Gabriele100%Yes Commissioning (Locking Coord,) and Noise studies
21
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis LOCKING ALIGNMENT MIRROR SUSPENSION CONTROL SUPERATTENUATOR SUSPENSION ELECTRONICS PHASE CAMERA CW & BG INJECTION VACUUM SYSTEM UPGRADES NOISE STUDIES IN THE ITF
22
Pisa - Commissioning Lock and align the interferometer Suppress Seismic Noise Inertial Damping
23
Phase Camera to monitor beams Noise Studies Diffused Light Control Noise Em Noise Vacuum Pisa - Commissioning B1s ref. beam
24
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis STOCHASTIC BACKGROUND CONTINUOUS WAVE NOISE
25
Pisa - Data Analysis TIER 2 – Pisa CPU: 100 (200) Numero di processi: 100 Jobs (con tempi tipici di 4 h) Potenza calcolo: 10 GFlops per core RAM: 1 GB per core Accesso RAM: 1 GBps I/0 su disco aggregata: 400 MBps Storage: 8 TB
26
Source frequency: 108.8571594 Hz Spindown: -1.46 e-17 Hz/s = 3.113188712 rad = -0.583578803 rad Sampling frequency: 4096 Hz Filter central frequency: 108.0 Hz Bandwidth: 2.0 Hz Integration time: 14.5 days
27
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis TILTMETERS GYROLASER MONOLITHIC FIBERS COATING STUDIES
28
Tiltmeters ROMA2 - PISA Tiltmeters A.DI VIRGILIO Gyrolaser G-Pisa
29
Tilt Control
30
Crystal
31
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis AdV Suspensions
32
Blade Springs Antimolle Magnetiche 8 m
33
Sisma sul terreno Sisma residuo allo specchio Rumore Termico
34
MIRROR 2 x 10 -18 m Hz -1/2 1.2 x 10 -6 m Hz -1/2 TF < 1.7 x 10 -12 TOP 34
35
!! TOP MIRROR TF = 1.26 x 10 -11 35
36
Upper limit Horiz Upper limit Vertical 36
37
several microns mirror swing 37
38
ADC DSPDAC Actuators Accelerometers RESIDUAL SWING < 0.1 m
39
Digitale Analogica
40
40 CONTROL NOISE - OK for AdV
41
Mirror Reference Mass Marionetta 3 VERTICAL MODES F7 -Blades 7 Hz15 Hz 40 Hz 41
42
Freq (Hz) Displacement Strain (m Hz^-1/2) MODES VISIBLE IN DF 42
43
Virgo AdV 43 A FEW UNITS Upper Limit Stringent Upper Limits (AdV OK)
44
44 SA compliant with AdV Superattenuators validated for 2° generation Passive Attenuation Microglitchness Control Strategy Virgo+ Monolithic Test
45
HORIZONTAL Change both number of filters and their distance (thus varying the total length) 45 TF
46
3 rd GENERATION: Use identical technology with cross-over below 2 Hz 46 CONCLUSION Present SA extension 9 17 m (1.8 Hz conservative cross-over )
47
WIND SEA MIRROR ACTUATION 47 The wind problem
48
Tilt 48
49
SAFE
51
Schema Ottico
52
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
53
MeccanicaElettronica 2010-13
54
Personale Assegnato a costruzione AdV (gia’ discusso)
55
1.5 Tecnico Alte Tecnologie 100% (incluso SAFE) Assembly Team Supervision 2010-11 Filter Assembly
56
Pisa - Data Analysis TIER 2 – Pisa CPU: 100 (200) Numero di processi: 100 Jobs (con tempi tipici di 4 h) Potenza calcolo: 10 GFlops per core RAM: 1 GB per core Accesso RAM: 1 GBps I/0 su disco aggregata: 400 MBps Storage: 8 TB Resp. Giancarlo Cella
57
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
58
MISSIONI INTERNE: 145 k€ (2010: 100 su 139 richiesti ) MISSIONI ESTERE: 45 k€ (2010: 36 su 45 richiesti ) CONSUMI 10 Electronic lab mantein. 5 SSFS Digital (consumable) 5 Digital Mixer (consumable) 12 Crystal 14 Susp Mechanics SAFE programme 5 Tiltmeters consumable 51 k€ (2010: 26 su 53 richiesti ) Richieste (Provvisorio)
59
COSTRUZIONE APPARATI 10 – Rivisitazione Filtro 1 (damping verticale) 12 – Laser Pointing System for IP control 10 – New monitoring Filter 7 7 – New remote adjustment mechanism 8 - Coating 8 – SSFS digital control (APP) 8 – Mixer Digitale (APP) 14 – Thermal compensation system 77 k€ (2010: 50 su 84 richiesti ) INVENTARIO 15 k€ Storage TIER2 (8 TB) 15 k€ (2010 10 su 15 richiesti ) TOTALE: 323 k€ (2010: 213 su 337)
60
Stanze Pulite + Mech Labs G-Pisa in lab ottica VIRGO Spazio Attività Coating 1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
61
Conclusions VIRGO sta funzionando Richieste 2011 incentrate su sviluppi Superattenuatori Impatto sui servizi e spazi di sezione definito Pisa e’ responsabile di molte attività I Superattenuatori sono in specifica per AdV Dubbi da sciogliere sullo schema ottico per AdV Ancora debolezza sulla manpower elettronica
Presentazioni simili
© 2024 SlidePlayer.it Inc.
All rights reserved.