Scaricare la presentazione
La presentazione è in caricamento. Aspetta per favore
PubblicatoAngela Milano Modificato 6 anni fa
1
CSN2 20 September 2017 Mauro Taiuti & Giacomo Cuttone& Paolo Piattelli
KM3NeT Astroparticle & Oscillation Research with Cosmics in the Abyss (ARCA & ORCA) CSN2 20 September 2017 Mauro Taiuti & Giacomo Cuttone& Paolo Piattelli
2
Outline General Remarks Phase 1 Phase 2 Km3 in Italy
3
KM3NeT Collaboration 12 Countries >40 Institutes >220 Scientists
4
Detector Construction
Management Structure The Management Team meets fortnightly The Steering Committee meets monthly Project Management Team Installation Site Manager KM3NeT-Fr P.Lamare Spokeperson: M. Taiuti Deputy spokesperson: A. Heijboer Technical Project Manager: E. Koffeman Physics & Software Manager: P. Coyle Installation Site Manager KM3NeT-It N. Randazzo Installation Site Manager KM3NeT-Gr S. Harissopulos Project Steering Committee Detector Construction Qualification: S. Henry Power system: R. Cocimano Mechanics: E. Berbee Optical system: G. Kieft Electronics: D. Real Calibration: G. Riccobene PMT: P. Migliozzi DOM integration. D. Vivolo DU integration: I. Sgura Data Management Off-line Software & Computing: K. Graf On-line DAQ/Readout: T. Chiarusi
5
Phase 1 History Foreseen Realized so far 24 ARCA DUs 6 ORCA DUs
6
Phase 1 CTF: Cable Termination (Frame) : Secondary Junction boxes
: Tower DU : String DU PPM-DU EMSO node
7
Phase 1 (the bad) Main failures occurred in the last year
ARCA DU 3 ARCA Junction Box Phase-1 ORCA Cable ARCA system Investigation of failures allowed to find and solve several problems But last failure still without solution (money and vessel unavailability to survey the site and to try to recover bypass the failure and recover the system)
8
Phase 1 (the goods) ARCA DU3 JB Phase-1 ORCA Cable
Modified grounding scheme inside the DOM Improved design of the VEOC (dedicated assembly tools realized by NIKHEF+LNS) JB Phase-1 Needs to be redesigned – contacts with MacArteney ORCA Cable Problem understood – it could represent, necessary to find a definite solution – contacts with Alcatel ORCA DUs are an improved version
9
Phase 1 (the goods) ORCA-DU1 and ORCA-DU2 ready for deployment (waiting for stable weather conditions)
10
Phase 1 (the goods) ARCA-DU1 and ARCA-DU2
deployed December 2015 and May 2016 at Capo Passero, Sicily worked till April 2017 plenty of statistics Data analysis of atmospheric muons shows excellent agreeement between data and MonteCarlo
11
Phase 1 (the goods)
12
Phase 1 Summary Early «infant mortality» intrinsic of any starting project (obviously we cannot exaggerate!) Several lessons learned Quality of DUs highly improved Quality Assurance generally improved The detectors performances are well under control
13
Phase 2 Budget France: 8 M€ secured, new request for 20 M€ ongoing
Italy: POR Sicilia 34.5M€ secured (50% INFN co-funded) The Netherlands: new request for 12.7 M€. Decision in 2018 Italy: PON IR 16 M€
14
Phase 2 ARCA: Astronomy Research with Cosmics in the Abyss
To be installed in the Italian site of the KM3NeT infrastructure 115 detection units per building block 18 DOM per DU Vertical DOM spacing 36 m Inter-DU spacing 90 m 2 building blocks Total volume ≈1 km3
15
Phase 2 The production and integration rates have been defined to complete the construction in 2022
16
Phase 2 PMTs The specifications for the PMT tender have been defined The tender is expected to start shortly ARCA cable The definition of the specifications of the Phase 2 - ARCA cable is in progress Review Committee (F. Ameli, M.Circella, R. Cocimano, A. D'Amico, P. Lamare, K. Leismuller, M. Sedita, M.T.) The tender is expected to start this year
17
Phase 2 Set-up of integration facilities on-going
DOM integration sites Catania, Naples, NIKHEF OK Athens, Erlangen, Rabat, Strasbourg in progress DU integration sites LNS, NIKHEF OK Genova in progress Full description in next slide
18
KM3NeT Phase-1 Infrastructure
Target integration speed: Up to 5 DOMs/week/site Up to 1 base module/week/site Up to 1 DU/month/site KM3NeT Phase-1 Infrastructure 3 Installation sites 2 PMT preparation sites 5 DOM integration sites 3 DOM integration sites planned / in preparation 3 base module integration sites 3 DU integration sites 3 DU test and preparation to deployment sites 1 DU integration site planned 1 electronic refurbishment center KM3NeT-HQ Amsterdam Erlangen Strasbourg Genova Bologna Marseille KM3NeT-Fr Bari Naples Valencia Athens Catania KM3NeT-Gr KM3NeT-It Rabat
19
Report to the President of the INFN
Il Comitato di Valutazione Internazionale (CVI) N. Amodio, Confindustria, It; P. BinŽtruy, APC Laboratory, Fr; M. Bosman, IFAE, Barcelona, Es; M.N. Harakeh, KVI-CART, Groningen, ; A. J. S. Smith, Princeton University, USA (chair); C. Spiering, DESY, D; and E. Zaninotto, Università di Trento, I December, 2016 CSN2 KM3NeT: The failure of the 3rd string is a reason of concern (although the string was recovered and the problems identified). However, its strategic importance is very high so INFN should continue to support it, and consider postponing the tower deployment for the moment to continue with strings first. In this way the decisione on best use of the towers (e.g. for a dense core) can be made without time pressure
20
In Sicilia operano i principali EPR Nazionali
In Sicilia operano i principali EPR Nazionali. Nel dicembre 2014 call per «INVITO A PRESENTARE MANIFESTAZIONI DI INTERESSE PER L’INSERIMENTO NELLA RETE DELLE INFRASTRUTTURE DI RICERCA DEL PIANO NAZIONALE DELLE INFRASTRUTTURE DI RICERCA- PNIR» Il Contesto Le prime 3 I.R. della graduatoria sono state inserite nel PNIR. Nel PNIR sono state, inoltre, individuate le I.R. ritenute strategiche per il paese (17) tra cui i LNS (Laboratori Nazionali del Sud) e KM3NeT. KM3NeT è l’unica infrastruttura con sede in Sicilia ad essere inserita nella nuova road map ESFRI ( )
21
Il Laboratorio Multidisciplinare Distribuito sul Mare
Messina Roosevelt Catania Capo Granitola Portopalo
22
Il Laboratorio Multidisciplinare Distribuito sul Mare
Il Laboratorio è stato indicato dalla Regione Siciliana come l’I.R. a più alta priorità strategica da inserire internamente al PNIR (Piano Nazionale delle Infrastrutture di Ricerca). KM3NeT è una parte fondamentale di questo Laboratorio che coinvolge i principali EPR Italiani.
23
Finanziamento POR Regione Siciliana (scadenza 31/12/2019)
Progetto INFN-INGV-CNR: 40 M€ cofinanziato al 50% dalla Regione INFN 34.5 M€, INGV 5 M€, CNR 0.5 M€. Per INFN 2.15 M€ da Premiale Labmed, 14 M€ da Foe Esfri Km3NeT ( ), Personale 0.6 M€,Budget LNS 0.5 M€. Il programma di attività è stato definito assieme al management di Km3NeT.
25
Cosa possiamo rendicontare
26
Infrastrutture e impianti 2 M€
Nuovo cavo: M€ JB (fase 1 e 2) M€ Operazioni Marine M€ LOM x M€ 22 Stringhe M€ Completamento fase M€ Infrastrutture e impianti 2 M€ Spese tecniche M€ Obiettivo: Nel 2022 avere istallati e funzionanti almeno 72 stringhe e 8 Torri (Fondi PON , POR Sicilia, PON IR ). Almeno 24 stringhe già operative per la primavera 2019
27
Portopalo di Capo Passero
INGV INGV INGV INGV INGV INGV
28
Portopalo di Capo Passero
Non più vuoto ma soppalco Portopalo di Capo Passero INGV INGV
29
IR ed il contesto dei fondi strutturali
Sicilia Italia Europa Azione dedicata al finanziamento delle 17 I.R.: Km3NeT con tetto di 16 M€ a cura della sez. Napoli e Bari. Settembre 2017 pubblicazione del bando.
30
Time schedule Primavera 2018: review del sito per ananlisi problemi e installazione di 3 nuove stringhe. Autunno 2018: Installazione nuove JB e 3 stringhe Primavera 2019: 3 operazioni marine per installazione 18 stringhe. Start Integrazione stringhe fase 2 Estate 2019: Installazione secondo cavo con MVC e JB Primavera 2020: 3 operazioni marine per installazione 22 stringhe (con fondi POR) …. Per programma PON aspettiamo bando e tempi
31
Km3NeT is going to be ready for Multimessanger Astronomy
Conclusions Hard times … but we steadily and stubbornly proceed Significant improvements in the detector construction, in the data analysis and in the physics program definition The Collaboration is well represented in conferences The Physics program is attracting new participants Km3NeT is going to be ready for Multimessanger Astronomy
Presentazioni simili
© 2024 SlidePlayer.it Inc.
All rights reserved.