Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
In preparazione della riunione di CSN novembre 2008 Calorimetro LAR
2
Shutdown schedule L.Hervas LAr Weekly 2
3
Shutdown schedule Started. ECTA on truck
A Side C Side End March (we will see further on) Rumors are in the corridor L.Hervas LAr Weekly 3
4
LAr ,Tiles& L1Calo continued to collect data until 10.11.2008.
Since the breakdown of the LHC , ATLAS has collected cosmic muons data until LAr ,Tiles& L1Calo continued to collect data until The Atlas detector is presently being open , starting with the A side Access this week to EC-A and barrel side A First week december access to EC-C and barrel side C LAR Calorimeter now off until february 2009 Weekly schedule during shutdown period: Mondays: TDAQ tests using our ROSes Tuesdays: LAr & LVL1Calo calibration runs Wednesdays and Fridays: Calibration runs Wednesdays and Fridays afternoon, and Thursdays: LAr DAQ developments and tests One on call shifter for taking calibration runs
5
Three serious problems
LVPS refurbishing Have 8 running (2 at CERN, 5 ALGEN, 1 BNL) since ~3 weeks (refurbishing done) Go ahead with refurbishing 8 more taken from ECA asap Decide in November LAr week if to do the full Refurbishing #2 campaign LVPS backup solution Planned #2 FDR of AA backup plan 3rd BNL (to review the follow up of the #1, #1 FDR of Wiener still in Jan 09 FEBS Lost some FEBs by now (no light) Still belief that OTX is most probable cause Plan for preparing new OTXs “from Scratch” In any event it is incompatible with addressing all FEBS with current shutdown duration Waiting for confirmation of problem (access !) Then agree on a design and plan. Plan radiation and accelerated stress tests on new OTX HEC LVPS breakdown (the unit will be accessible by end of November)
6
Attivita’ di Milano Preamplificatori test su ibridi per Sono stati osservati” burst noise” su 1° /°° dei canali di PA E’ stato rimontato a Milano il banco banco di test, test fatto su un solo ibrido disponibile (prima dell’accesso al Calorimetro). Si dovranno sostituire gli ibridi anomali (osservato uno “pseudo corto” sulla linea 3v) HV E’ in corso lavoro sulla nuova versione OPC server ( SW ISEG di comunicazione con i moduli HV) da utilizzare nel programma di controllo HV che si vorrebbe installare entro inizio 2009 In progresso la preparazione configuration data base Calibrazione elettroni/gamma lavoro sui gamma che convertono, e’ in preparazione il codice da inserire in ATHENA il lavoro continuera’ nei prossimi mesi (2009) utilizzando nuova geometria , nuove generazioni MC.