Advisory Committee of CERN Users (ACCU) F.-L. Navarria CSN1, Roma, 17 settembre 2007.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

Roberto Ravaglia Funzionario Tecnico UNI Standard e terminologia.
Termodinamica Chimica
REALIZING CONSTRUCTIVIST OBJECTIVES THROUGH COLLABORATIVE TECHNOLOGIES: THREADED DISCUSSIONS Donald Weasenforth Sigrum Biesenbach- Lucas Christine Meloni.
Azione dello Steering Group on Ozone Risk Assessment : To further develop and validate the flux concept for the prediction of ozone impact on vegetation.
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
Incontro di coordinamento Firenze 21 gennaio 2010, 11:00-17:00 Ordine del Giorno Presentazione piano di lavoro eTwinning 2010 Dati registrazioni Proposte.
Fonti, metodi e strumenti per lanalisi dei flussi turistici A.A Prof.ssa Barbara Baldazzi Corso di Laurea PROGEST Facoltà di Lettere e Filosofia.
Toolkit per la ricerca partner transnazionali Seminario Strumenti per la cooperazione transnazionale nel Fondo Sociale Europeo Roma, 4 dicembre 2008.
11 1 Roma, 4 aprile 2007 Giulio Dal Magro Ambiente e credito allesportazione: nuove regole e strumenti volontari.
ERA ARD The Agricultural Research for Development (ARD) Dimension of the European Research Area (ERA)
Le politiche della Commissione Europea sull'accesso aperto. Il ruolo delle biblioteche accademiche Salone del libro di Torino, 10 maggio 2012 Maddalena.
Lavorare nell’Unione europea
Project Review Novembrer 17th, Project Review Agenda: Project goals User stories – use cases – scenarios Project plan summary Status as of November.
Che ora e’/ Che ore sono?.
Il Processo di Bologna Un’introduzione Roma, 27 maggio 2005 A cura di Antonella Cammisa t.
Come preparare la Literature Review
UML: Activity diagram Corso IS I /03 Gianna Reggio Versione 0.1.
FLN, CSN1, Assisi, 20 settembre 2004 Advisory Committee of CERN Users (ACCU) F.-L. Navarria CSN1, Assisi, 20 settembre 2004.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
Il Calendario.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
Taccani1 7.4 Identification ANALISI DEI PERICOLI Hazard Analysis Identificazione Valutazione Misure di Controllo Control Measures Assessment.
Advisory Committee of CERN Users (ACCU) A. Di Ciaccio Universita’ di Roma Tor Vergata e INFN CSN1, Napoli, 19 settembre 2005.
8 Maggio 2002Workshop CCR - La Biodola W2K Coordination Group & HEP-NT Report Enrico M.V. Fasanelli Gian Piero Siroli.
Indagine sulla necessita’ di costruire un terzo foyer al CERN Anna Di Ciaccio CSN1 –Frascati-
Azione esterna dell’Unione europea – Come rafforzare il ruolo dell’Europa Elisabetta Capannelli, Commissione Europea
Jojo was a man who thought he was a loner But he knew it wouldn't last. Jojo left his home in Tucson, Arizona For some California grass. Get back, get.
CSN1 2-3 febbraio Comunicazioni Direttivo dicembre 2003: designato Prof. R. Petronzio Presidente INFN periodo Tempistica LHC: NON E’ ATTUALMENTE.
From this year, by kind permission of Taeco S.r.l., the Working Retrievers Club Italia has the pleasure to award the prize “Big Hunter Project”. This.
La gestione snella dei progetti Social Perché il lato pesante non può vincere sulla forza agile Ernesto Amato Project Manager & Agile Evangelist.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
SEMINARIO ISTRUZIONE SQUADRA DISTRETTUALE Repubblica di San Marino, 22 Febbraio 2014 ASSEMBLEA DISTRETTUALE di FORMAZIONE Sessione riservata agli ISTRUTTORI.
Alessandra De Cugis Progetto Tempi e Orari del Comune di Milano Time in the cities, a holistic approach for urban time issues, the case of Milan Paper.
Lo scenario del Linear collider LHC vs ILC: LHC è un progetto del CERN (strettamente europeo) È regolato dal Council cioè dagli stati membri 1 voto per.
25 giugno 02S. Patricelli - CSN1 - Frascati1 zCosa coprono i MOF-B per ATLAS zCriteri di suddivisione tra le Funding Agencies zCome si gestiscono zQuote.
Project Review Novembrer 17th, Project Review Agenda: Project goals User stories – use cases – scenarios Project plan summary Status as of November.
Panoramica generale di "Questo è NAV" Benvenuti Controllo Margine Crescita Introduzione Customer Evidence Dimostrazione Introduzione Customer Evidence.
Che ora è? Che ore sono? Telling time. Fate Adesso: If you were to stop someone on the street to ask the time how would you get their attention? If you.
Il Calendario.
40 years of the Italian JPO Programme: an overview 14 dicembre Camera dei deputati - Roma Giovani italiani nelle Nazioni Unite: una storia lunga.
STRATEGIC PARTNERSHIPS Programma Europeo Erasmus + STRATEGIC PARTNERSHIPS Servizio Relazioni Internazionali.
Prof. M. Battaglia «Prostate network» Uno modello organizzativo innovativo in epoca di HTA e spending review.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Comenius Project “Math is B.E.A.U.” that is Beautiful Easy Amusing Useful ITALIAN WORKGROUP ENNISKILLEN (U.K.) May 2011.
Domenica Taruscio Direttore Centro Nazonale Malattie Rare Istituto Superiore di Sanità Roma
Laurea Magistralis in “Economia e Legislazione d’Impresa” (Economics and Law for Business) Objectives and Overview Program Structure Courses Advisory Board.
OJS & OCS O PEN S OURCE PER LA R ICERCA S CIENTIFICA Le risorse offerte da CSIA-UniMC per la ricerca scientifica: Open Journal System & Open Conference.
Database della ricerca: Introduzione e obiettivi meeting INFN CNR INAF 7 ottobre
Accertamento norme internazionali. Una delle tre funzioni essenziali sistemi giuridici Nessuna autorità sovraordinata In linea di principio, ciascun soggetto.
CP4: Ambito di protezione dei marchi in bianco e nero “Armonizzare le diverse interpretazioni dell’ambito di protezione dei marchi esclusivamente in bianco,
ORGANISATION OF THE EDUCATION SYSTEM IN ITALY 2010/2011.
Riunione CSN1, Roma, Gennaio 2012F. Bedeschi, INFN-Pisa 1 Riunione CSN1  Comunicazioni  Comunicazioni varie  Riunioni future  Similfellows  Regole.
ACCU Advisory Committee of CERN Users status report CSN1 – Pisa 15 settembre 2008 Nadia Pastrone agenda standard argomenti affrontati punti d’interesse.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
Futuro di EGI EGI è menzionato esplicitamente nel draft delle nuove calls EU ( H2020 ) Da ultima versione (per me) data 18-9 di –HORIZON 2020 – WORK PROGRAMME.
Do You Want To Pass Actual Exam in 1 st Attempt?.
TERMINATION The court confirmed that the landlord had to return the security deposit to the tenant within fifteen days after the termination of the lease.
EUROCITIES-NLAO Bologna, 01/12/2010
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Riunione di ATLAS Italia - BO
Proposal for the Piceno Lab on Mediterranean Diet
Progettazione concettuale
Transcript della presentazione:

Advisory Committee of CERN Users (ACCU) F.-L. Navarria CSN1, Roma, 17 settembre 2007

Riferimento, pagina Web: ad es. termini del mandato, minute delle riunioni dal 1998, argomenti discussi dal 1988, composizione, contatti con altri comitati del CERN, collegamento all’agenda delle riunioni – UO, avvisi, formulari, memoranda, etc. prima del 1988, usando CDS, solo qualche rimando a documenti cartacei – per ora Bibliografia

Mandato ► The task of ACCU is to advise the DG on the practical measures to be taken and administrative internal arrangements to be made by the CERN Management for the utilization of the CERN facilities for research. This concerns in particular the working conditions and the arrangements for technical support to the CERN Users for their activity at the CERN Laboratory. ► Questions dealing with the scientific programme of CERN do not fall under these terms of reference.

Composizione A.Two Users from each of the larger MS (Fr, De, I, UK); B. One User from each of the other Member States; C. Two CERN Staff members; D. Four Users from non-Member States. A. F. Kunne, A. Rosanov (F); H. Kroha, H.-C. Scultz-Coulon (De); N. Pastrone, FLN chair (I); S. McMahon, G. Wilkinson (UK) B. W. Adam (A), G. Wilquet (Be), (Bu), P. Závada (Cz), J.B. Hansen (Dk), K. Lassilla- Perini (Fi), Y. Tsipolitis (Gr), F. Siklér (H), G. Bobbink (Nl), G. Løvhøiden (N), M. Witek (Pl), P. Bordalo (Pt), A.Z. Dubnichová (Sl), C. Martinez-Rivero (Sp), K. Jon-And (Sw), K. Freudenreich (CH) C. P. Collins, T. Ruf D., D. Acosta, E. Etzion, V. Karjavine, R. Hayano CERN Management is represented by J. Engelen (CSO, Deputy DG), S. Lettow (CFO), [last meeting: M. Metzger (SG)], J. Salicio Diez/ PH, C. Onions/PH (Head of Users’ Office) as Secretary; C. Parrinello/HR and M. Goossens/Staff Association + others as needed

Nota Fino al 2003 era presente alle riunioni anche il DG, un direttore della ricerca, il direttore dell’amministrazione (a volte), il responsabile delle relazioni con i MS ACCU rappresenta tutti gli Users, staff e visitatori, appartenenti a tutti i dipartimenti [lo Users’ Office è stato parte delle divisioni NP, EP, PPE, EP e infine del dipartimento PH(-EP), adesso deve farsi carico di tutti gli users (non pagati, UPAS) con personale che invece non cresce]

Riunioni Quattro volte l’anno, la settimana prima del FC,Council; ad es. nel 2007: 7 marzo, 13 giugno, 12 settembre, 5 dicembre (tipicamente 9h15 ~ 13h15) Desktop Forum E. Etzion, (C. Onions) Archive Committee CO Accomodation Facilities ex HFC A. Rosanov, FLN, (CO) Groupe de Protection des Biens CO Restaurants’ Supervisory Comm. C. Martinez-Rivero Academic Training Committee FLN Scientific Information Policy Board K. Freudenreich, FLN Rappresentanti degli Users in altri comitati del CERN

Agenda della 77a riunione 12 settembre Chairman's remarks 2.Adoption of the agenda 3.Minutes of the previous meeting 4.Matters arising 5.News from the CERN Management 6.Logistics and transport at CERN 7.Car sharing pilot project 8.Reports from ACCU representatives on other Committees –Restaurants’ Supervisory Committee –Scientific Information Policy Board 9.Users' Office news 10.Any Other Business 11.Agenda for the next meeting Action items Rapporto di servizi del CERN include Accomodation Facilities & DTF reports

– CERN man.: To ensure sufficient resources to maintain services for users – CERN man.: To ensure that the security at the pits is reinforced by the introduction of guards: sono state installate videocamere, in un caso è stata fatta entrare la polizia per operare un arresto – ACCU del.: various points to be raised at AF meeting about hostels: (riunione su Accomodation Facilities il 10/09) Web booking, rules on block booking, unacceptable delays in (-ve) replies: la situazione è un po’ migliorata col nuovo foyer inaugurato a maggio (104 letti, +25%), nuovo contratto per la gestione del foyer in novembre risposta di ACCU sulle percentuali (Web&block) monitoring of refusals in Oct-Nov to see whether further action is needed (debt will be repaid end of 2008), nel avevamo stimato la necessità di ~200 camere addizionali e adesso il numero di users è in decisa crescita Action items

M. NONIS TS/FM – CERN Accomodation Facilities meeting – WEB BASED BOOKING SYSTEM (proposal)

Reservation type / category Maximum reservation delay 1 Maximum duration for one single stay Maximum duration of stay, within calendar year Maximum number of beds per visitor Acceptation criteria Building Priority over other reservations Single persons 60 days 1 or , 39, 41 Summer students 60 days 90 days 1 Following list from the HR Dept. 38 Employed members and associates 2 60 days or 2 Concerned Department 38, 39, 41 Students (others) 60 days 1 Request from CERN University’s responsible 38, 39 Selection board candidates 60 days 1 à 2 days ---1 Given from the HR Dept. 38, 39, 41 Council members 12 months 60 days 1 or 2 Via the Council Secretariat 39 Visits 60 days From the day before to the day after the visit or 2 List given by the organiser 38, 39, 41 School groups (official visits) 60 days From the day before to the day after the visit % 3 List given by the school 38 Experimental weeks 4 / workshops 4 / conferences 4 / VIP visits 12 months From the day before to the day after the conference 60 days 30 % 3 List given by the secretariat or the organiser 38, 39, 41 1 – before arrival date 2 – only at beginning of contract 3 – of the total capacity per room type 4 – officially organised by CERN Building 38 :199rooms, 250 beds Building 39 :116rooms, 140 beds Building 41 :98rooms, 104 beds RESERVATION RULES

– ACCU del.: DTF representative to follow up the question of Skype: ci sono genuini problemi riguardo alla sicurezza, esistono soluzioni, ma non è chiaro chi ci possa lavorare sopra, il contratto non è stato ancora firmato – other matters arising – (AFC 10/9) prestito (super)agevolato da FIPOI per costruire nuovi uffici: ci sono stati contatti informali del CFO e la richiesta è stata ricevuta favorevolmente: prima di procedere formalmente occorre l’autorizzazione del C/FC – il pre-progetto riguarda l’estensione del Bat. 40 (300 posti per ufficio, la metà chiusi) anche in questo caso ci si aspetta una reazione di ACCU/users – Ombudsperson intiative: la task force ha preparato un rapporto con la proposta di formare un working group che deve essere nominato dal management del CERN Action items (2)

Notizie dal management il Council di giugno ha accettato i 240 MCHf addizionali nel per evitare i problemi con nuove attività (aumento di luminosità, nuova catena di iniezione …), per metà forniti da F/CH, il budget 2008 deve essere negoziato questa settimana – LHC: la nuova schedula prevede collisioni nell’estate 2008; il settore 4-5 è stato raffreddato → alcune perdite; problemi con i plug-in modules, ma “solo” 5 su 500 – la celebrazione ufficiale dello start-up è fissata per il 21 ottobre 2008; ci sarà un Open Day il 5-6 aprile 2008 (sarà ancora possibile scendere nei pozzi), l’ultimo OD 04/10/16 fu un successo di pubblico inaspettato con >> 30 k visitatori – nomina del nuovo DG: short list, ma alcune delegazioni non sono contente della short list, riunione speciale del Council in ottobre

Rapporti di servizi del CERN Logistics and transport at CERN (Matti Tiirakari) material management rather complex, i) international organization & ii) INB imply delays; FI dept., ST dept. and various others involved and interconnected (before it was only one div.) → define & adapt services in collaboration with users’ dept., full traceability of operations, centralize the supply chain, harmonize stock management, optimize procurement (with other HEP labs.) Car sharing pilot project (Sascha Schmeling) no-logo PH cars (15 short term loan) → 38 unanswered requests short term (59 long term) – current average usage ~1 h/day; car sharing: market survey, cars + GPS etc. would cost 250 k (no cash this year)

Rapporti dei rappresentanti nei comitati Restaurant Supervision committee (CMartinezRivero ) il menu del R1 non è ancora sul Web, ma dietro un vetro, è stato aumentato il personale per la cena, i distributori automatici saranno Novae (4 dic.) e ce ne sarà uno nel MB Accomodation Facilities (ARosanov) già presentato negli Action items Scientific Information Policy Board (KFreudenreich) biblioteca, problemi di budget, alcune cancellazioni di abbonamenti di riviste, finanziamento di SCOAP3 (300 k per OA) – a questo proposito il SG osserva che le agenzie sono riluttanti a impegnarsi

Notizie UO – – rinnovo del contratto via EDH, è pronta una prima versione, da migliorare → UserContractRenewal (ma non tutti i TL hanno EDH!) – se un TL non è stato nominato entro la scadenza (2 mesi), il team sarà chiuso – PreRegistrationTool, nessun progresso da giugno – l’Attestation de Fonction necessita di essere rinnovata ogni anno, perchè? sarebbe auspicabile la Carte de Legitimation – 8,444 users sono registrati al momento – gli esperimenti durano 10 anni dopo il completamento: questo pone problemi in alcuni casi, eg Chorus Nomad

Da fare e da discutere – Soluzioni a breve termine per le foresterie etc.: regole chiare, alcuni miglioramenti (Web booking, ridurre il block booking, migliorare e rendere impersonale il servizio di prenotazione) – Soluzione a lungo termine, valutazione della necessità di ingrandire ulteriormente le foresterie – Spazio per uffici: con 300 posti addizionali, oltre ai 200 circa dati recentemente ad ATLAS-CMS, si dovrebbero coprire le necessità stimate in passato (una ulteriore indagine è/sarà in corso a breve)