NSW/MM status news ‘organizzative’ dal CERN esito delle reviews stato Mod 0 tests con NA hangar 120 ott 2014M.Alviggi, Riunione di ATLAS.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

P. Capiluppi Organizzazione del Software & Computing CMS Italia I Workshop CMS Italia del Computing & Software Roma Novembre 2001.
La stazione di test a raggi cosmici di Napoli per gli RPC di ATLAS
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
G. Pugliese Bari, 20 May 2005 I rivelatori a Resistive Plate Chambers G. Pugliese per la Collaborazione CMS di Bari.
BRISCOLA GO ON AVANTI. Storia I giochi di carte hanno le origini più disparate e vengono collocati in differenti epoche, la Briscola risale al La.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
A.Di Ciaccio – Riunione RPC- Roma 5/11//2002 Programma di lavoro alla GIF Misurare le rate di singola su tutte le camere per capire se ci sono zone calde.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Paolo Bagnaia - 10 January invecchiamento. elettronica di read-out; shielding (MDT, RPC, …); HLT + DAQ; _________________________ NB :non include.
Sistema automatico di misura della resistività. QC HPL Gennaio – Novembre 2004.
Riunione per organizzare il lavoro dei prossimi mesi: Lista di compiti Divisione del lavoro.
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
Stato del progetto RPC Riunione Commissione I Roma 4/4/2006 R. Santonico.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
PINK FLOYD DOGS You gotta be crazy, you gotta have a real need. You gotta sleep on your toes. And when you're on the street. You gotta be able to pick.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
Fatti principali dei precedenti 12 mesi. - Presa dati (al ) : 6.23*10 19 p.o.t. - DAQ >99%, eventi on-time in 2009 (≈ 5500 in.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
MyEconLab_Univerità degli studi di Milano, corso Prof.ssa Valentina Raimondi How to Access MyEconLab 1.
Stato degli RPC di ATLAS Riunione CSN1 Catania 19/9/02 R. Santonico.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
Indagine sulla necessita’ di costruire un terzo foyer al CERN Anna Di Ciaccio CSN1 –Frascati-
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
MyEconLab_Univerità degli studi di Milano, corso Prof.ssa Valentina Raimondi How to Access MyEconLab 1.
La gestione snella dei progetti Social Perché il lato pesante non può vincere sulla forza agile Ernesto Amato Project Manager & Agile Evangelist.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
2500 ricercatori da 150 Istituti di Ricerca e Universita’ di 35 paesi Per: attivita’ ricerca, strumenti, collaborazione Dissemination!!! Coordinatore:
Working Group Layout Design 5/
MUG-TEST A. Baldini 29 gennaio 2002
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
15.11,2005 LNFMarcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa ROADMAP B and SUPER B in Italia Gruppo1 LNF 15Novembre, 2005.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
 SLP Tests in VME test stand: Saverio – Pierluigi (Daniel)  New test stand: Enrico (Saverio – Pierluigi)  VME Tests versus new test stand tests (Enrico-Saverio-Pierluigi)
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 Closed Loop e Gas Gain Monitoring Il Closed Loop e’ in operazione stabile dopo lo.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
Riunione ATLAS Napoli 20 Ottobre 2014 Info dalla CSN1 di Catania e ATLAS Week Shift e OTP Spazi al CERN e Napoli.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
RPC R&D ATLAS-CMS WG4 D. Piccolo, B. Liberti per il WG4 1.
MEG (Torino 25 settembre 2012: A.Baldini) Stato dell’esperimento e generalita’ sull’upgrade.
ORGANISATION OF THE EDUCATION SYSTEM IN ITALY 2010/2011.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
Richieste IFR 2011 Roberto Calabrese Università e INFN – Ferrara Marzo 2011.
1 OUTLINE CSN I, Roma 19-20/1/2015 RICH&THGEMSilvia DALLA TORRE Impegni per costruzioni – bilancio 2014 Read-out rivelatori ibridi ottobre 2014 – gennaio.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
PANNON GÉP PANNON GÉP KFT Production of agricoltural tools and equipments since Our company is distinguished for the use of high quality material.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Compositi per ATLAS Overview del processo per la costruzione supporti per ATLAS Tempistica.
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Test di Na.
R&D fase 2 – RPC 4st meeting
TC Test a BTF ad inizio settembre : scelta SiPMT a fine ottobre Finalizzazione disegno meccanica entro fine anno Utilizzo parte FI per ascquisto.
ONEDATA - distributed data caching -
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
SICILY : EASTER IN AIDONE ‘FESTA DELLA RESURREZIONE’
SuperB – Richieste Sblocchi 2008
Atlas Milano Giugno 2008.
Preliminary results of DESY drift chambers efficiency test
Transcript della presentazione:

NSW/MM status news ‘organizzative’ dal CERN esito delle reviews stato Mod 0 tests con NA hangar 120 ott 2014M.Alviggi, Riunione di ATLAS

NSW Steering Group Composition 2 NSW PL PL deputy: MM Mauro Iodice PL deputy: sTGC Giora Mikenberg Electronics Lorne Levinson Alignment Jim Bensinger Mechanics/ Struc- ture and Layout Patrick Ponsot Marco Ciapetti Services, Cabling Agostino Lanza Detector Controls Theo Alexopoulos „NSW Technical coordination“ Integration and Logisitics Paolo Iengo Software Andrea dell‘Acqua Muon IB liaison Ludovico Pontecorvo Muon Liaison Christoph Amelung Testbeams Yan Benhammou Given the growing scope of (combined) test beam activities – Yan Benhammou appointed as NSW test beam coordinator – Yan will closely work with the existing test beam teams of MM and sTGC Marco Ciapetti has been appointed to formally coordinate the NSW Mechanics Design related activities on TC side “Position” of a Resource Coordinator is still unfilled ….

2015 tentative NSW Weeks Tentative Muon/NSW Week dates in 2015 are March 9-13 June 1-5 Sept 28 – Oct 2 Dec To be approved by the Muon IB this afternoon We think another outside workshop would be beneficial, especially for the NSW and phase-2 upgrade Napoli? Gruppo 1…. spostare a October 5-9/ October These are the two time slots that are currently being considered for the outside ATLAS week in Lecce, and we would pick whichever week becomes not the ATLAS week. We also asked for feedback on the idea of having an outside muon week again in 2015, and proposals for locations. If the Sep/Oct muon week is moved to directly before or after the outside ATLAS week, this week could probably not be considered for an outside muon week.

Reviews TDS (serializzatore dati sTGC) and ART (Address in Real Time per le MM) ASIC Preliminary Design Review – Il prototipo di TDS può essere inviato alla factory per la prima produzione – La situazione è più critica per l’ART: esiste un prototipo ancora da testare sTGC Design Review – OK partenza Mod0, procurement dei materiali per la produzione in serie, etc.. – Richieste di approfondimento: inserimento del sistema di raffreddamento, grounding, sistemazione dei servizi…. 4 Type 0: ZAXIS, pitch 150 μ, cond 50 μ MM design review OK partenza Mod0s in più sedi, procurement dei materiali per la produzione in serie, concentrarsi sull’equipaggiamento e la sistemazione dei siti di costruzione etc.. Richieste di approfondimento: grounding, zebra connectors, allineamento tra strip resistive e di read out, test allineamento tra pannelli su mock up realistici (deformazioni etc..)

Procurement 5 MicroMegassTGC ItemReadout PCBs (up to 2.2 x 0.6m), patterning, gluing resitive foil, pillar deposition Cathode Boards, Machining of strips and brass precision inserts Estimated cost volume CHF CHF IT-4050/PH/ATLASIT-4062/PH/ATLAS Departmental Request, Start-Up meeting with Purchasing Done Market Survey docsSent out last weekFinal draft, expected to be sent out next week Invitation to TenderNovember(end) November Selectionend of the year/beg. January Finance committee approvalNot neededRequired, Feb 2015 (*) Contract awardFeb 2015March 2015 MM and sTGC major cost items – series production Soon need to make preparations for funds to be actually available Leaving R&D phase, moving into production phase --- any late discovered changes will cost real and potentially lots of money … please take sign-offs and design checks seriously !

Mod0: Assembly method Simplified tooling is designed to demonstrate the validity of the method described in the design review First panel full scale is ready, another one is in construction Parts are provided or constructed by INFN (Pavia, Roma1, Roma3, Frascati) Tooling setup for beginning of november Tests mid-november Sketch of the simplified tooling (from S. Cerioni, MM session Oct. 14 th ) Work in progress in the INFN Frascati clean room 6

Mod0: Other points of concerns Cooling end-plugs and connections (height of connectors vs panel construction) Alignment and pressure of ZEBRA connectors Cleanliness and closing procedure PCB Layout Final  circulate next week to the groups for final checking Mesh choice for module-0: – Feasibility in industry (BOPP – usual partner ; Chinese company – to be validated) – Transparency vs aperture/thickness ratio Screen printing at CERN: – Machine delivered this week and connected November 15 th – Masks and tools ready by November 15 th – Production starts end of November 7

2015 Mod0: timeline 8 JulyAugSepOctNovDecJanFebMarAprMayJun M0 Design and drawings FDR (after M0) Tooling design and procurement 2014 Dubna / Thessaloniki Cern) M0 Commissioning and validation Procurement for M0 Design review (M0) Final PCB layout R/O PCB delivery JulyAugSep INFN ; Germany ; Cern Italy – INFN ; Germany ; Cern France – Irfu M0 Construction France – Irfu M1: Dubna/Thessaloniki

Partecipazione alla costruzione di: prototipi meccanici di grandi dimensioni (4 m kg) quadrupletti funzionanti, MMSW, da inserire in Atlas per test in ambiente reale (dimensioni: 1.2 x 0.5 m2, 4 strati(2 eta, 2 stereo), strip pitch mm, 1024 strips/layer) Tooling in off.meccanica Mod0 nelle altre sedi e attività ‘napoletana’… Partecipazione ai test-beam, test di MMW: turni (next: SPS/H6, October 27 (Mon) - November 03 (Mon), TGC+MM) partecipazione al programma di acquisizione (F.Cirotto) analisi performance MM (R.delBurgo) Partecipazione allo sviluppo di software: decodifica delle MM per MSW e per ATLAS (F.Cirotto) 9

Controllo planarità con FBG per Mod0 10 Definire il modo migliore di inserire le fibre con i sensori tra honeycomb di alluminio e piano di vetronite: i bordi delle celle premono sulle fibre facendo fuoriuscire la luce o peggio rompendole … 2 soluzioni  1. filo di acciaio, inserito in // per assicurare lo spessore necessario alla fibra: prototipo ok ma scartato dai colleghi italiani costruttori di pannelli… 2. ‘canaline’ nell’honeycomb, scavate tramite pressione di una barra con ‘dentello’ effettuate diverse prove per trovare tool e misura ideali per la canalina (7x1 mm 2 ) prototipo con fibre senza sensori (1x0.5 m 2) incollato, dobbiamo controllare l’integrità delle fibre 3.a breve prototipo con sensori in due dimensioni e su due lati 4.allineamento, connettori… Acquistate fibre e sensori per Mod0 italiano, forse anche CERN interessato per il loro Mod0…

NA con cosmici e Fe55 : misure di v_drift, trasparenza, guadagno etc. con miscele di gas diverse da quella attualmente scelta per Atlas (a Aggiunti 2 scintillatori 10x10 cm 2 Camera da vuoto per misure sotto pressione atmosferica 2 camere MM2D: X Y (10x10 cm 2, strip pitch 250  m, # canali: 360 per vista) 1 camera MBT0: doppia gap, XV (60 0 ) (strip pitch/width 500/250  m in x, 1.5/0.9 mm in V, # canali 190 X/ 66 V lettura tramite SRS (APV) 1 camera R20 con lettura di 120 strip x in OR strip pitch/width 250/150  m 2 camere MM2D: X Y (10x10 cm 2, strip pitch 250  m, # canali: 360 per vista) 1 camera MBT0: doppia gap, XV (60 0 ) (strip pitch/width 500/250  m in x, 1.5/0.9 mm in V, # canali 190 X/ 66 V lettura tramite SRS (APV) 1 camera R20 con lettura di 120 strip x in OR strip pitch/width 250/150  m Electron trasparency in R20 prototype Tesi (triennali) 2014: A. Evangelisti, P. Iovine, A.Renardi, G.Russo, M.T.Camerlingo Garfield misure 11

‘Torre’ di test Vorremmo utilizzarla per – misura di performance di micromegas – test delle micromegas prodotte in Italia per la NSW? Programma di tracciamento da F77 a C++ – conversione iniziata da Massimo, attualmente portata avanti da Arturo DAQ micromegas in labview su MAC (Riccardo) Integrazione DAQ scint+drift_ch con DAQ (Labview/MMDaq) micromegas (Riccardo, Massimo,..) 12

13 dalla mail di Philipp Fleischmann: milestone week M7 (Nov 24th – Dec 8th), all desks will be operated by shifters (anche per validare la documentazione…) The shifts will be credited as regular OTP class 1 shifts 13 shift blocks (of 3 or 4 shifts each) that will have to be filled send me (P.F.) an saying so *before the 1st of November*. It is *obligatory*, that those shift candidates will take part in the training session, that will be centrally organised on November 19th and 20 th next opportunity will be during milestone week M8 in February. Muon shifts durante M7

14 Muon shifts/OTP per il run2 OTP classe 1 Muon desk: MG, Arturo?, F.Cirotto?, Givi?, Massimo?, V.Canale? OTP classe 2 DataQuality: Massimo?, V.Canale? RPC on call?: ? OTP classe 3 nei primi 5 mesi 2014 (0.05 a persona per task…): RPC operation and maintenance: MG, Givi, Lello Rocco (pensione..) Muon Detector related Trigger: V.Izzo, Massimo, Sabrina Detector DAQ: Massimo Detector Data Quality: Massimo