Preventivi 2011 VIRGO Pisa
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
Evoluzione della sensibilità di VIRGO
VSR1 VSR2
VSR2 Duty Cycle
Noise Budget
Monolithic Suspensions July 2010 – Half 2011 (VSR3)
LSC-VIRGO -VSR1 Analysis VSR1 Network
LSC-VIRGO -VSR1 Analysis Link to P.Shawnan Review VSR1 Network
LSC-VIRGO -VSR1 Analysis Continuous Waves CRAB - No more than 4–6% of the spin-down energy is going into GW emission VELA – Results under review
< 3.6 per year Bursts Placed limit on GW energy spectral density: 0 < 6.5 × 10 –5 Stochastic
Coalescing Binaries GRB –Short, hard gamma-ray burst –Consistent with being in M31 –Leading model for short GRBs: binary merger involving a neutron star –Searched for both inspiral and burst signals –No plausible GW signal found
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
Increase sensitivity by 10 (NS-NS horizon 150 MpC) Start the data taking with Advanced LIGO (2015) AdV Goals
AdV Baseline Heavier mirrors High finesse Larger beam waist Signal recycling Fused silica suspensions HP Laser
Costs 20.6 M€ Mirrors Vacuum Suspensions Infrastr.
Virgo/LIGO NS/NS detectable at 300 Mpc Advanced Network 2014 Virgo NS-NS NS-BH BH-BH Event Rate 3/yr - 4/day 1/yr - 6/day 3/month - 30/day Range (Mpc) z=0.45
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
Composizione del Gruppo ~ 20 FTE NameFTEAuthorStudentActivity Basti Andrea30%YesNoSA Mechanics Bitossi Massimiliano50%YesNoSA Electronics Boschi Valerio100%YesNoSA Electronics Bradaschia Carlo100%YesNoOutreach coordinator, Vacuum syst., Adv.SA Braccini Stefano100%YesNoCW DA, Adv. SA Cella Giancarlo100%YesNoDA, Stochastic background coordinator, CW DA Colacino Carlo Nicola100%Yes DA, Stochastic background Di Lieto Alberto40%YesNoSilicon fibres, Phase Cam., High Power Laser Di Virgilio Angela40%YesNoGyrolaser Ferrante Isidoro100%YesNoCW Data analysis Fidecaro Francesco100%YesNoProject Leader Frasconi Franco80%YesNoAdv.SA & Cryogenics Gennai Alberto80%YesNoCommissioning (Control electr.), Adv.Electronics Giazotto Adalberto100%YesNoVIR-LIGO Liason, Tiltmeters, Adv. SA Mantovani Maddalena100%Yes Commissioning (Alignment) Passaquieti Roberto100%YesNoCommissioning & Run coord., Cryogenics & Adv.SA Passuello Diego80%YesNoCommissioning (Control electr.), Adv. Electronics Paoletti Federico *100%YesNoCommissioning (Control electr.), Adv.Electronics Poggiani Rosa70%YesNoEinstein Telescope Shore Steven20%No Data analysis theory, GW sources distribution Toncelli Alessandra50%YesNoR&D on silicon fibres, Phase camera Tonelli Mauro50%YesNoPhase cam., HP Laser, Thermal noise R&D Torre Oriella100%Yes CW Data Analysis Vajente Gabriele100%Yes Commissioning (Locking Coord,) and Noise studies
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis LOCKING ALIGNMENT MIRROR SUSPENSION CONTROL SUPERATTENUATOR SUSPENSION ELECTRONICS PHASE CAMERA CW & BG INJECTION VACUUM SYSTEM UPGRADES NOISE STUDIES IN THE ITF
Pisa - Commissioning Lock and align the interferometer Suppress Seismic Noise Inertial Damping
Phase Camera to monitor beams Noise Studies Diffused Light Control Noise Em Noise Vacuum Pisa - Commissioning B1s ref. beam
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis STOCHASTIC BACKGROUND CONTINUOUS WAVE NOISE
Pisa - Data Analysis TIER 2 – Pisa CPU: 100 (200) Numero di processi: 100 Jobs (con tempi tipici di 4 h) Potenza calcolo: 10 GFlops per core RAM: 1 GB per core Accesso RAM: 1 GBps I/0 su disco aggregata: 400 MBps Storage: 8 TB
Source frequency: Hz Spindown: e-17 Hz/s = rad = rad Sampling frequency: 4096 Hz Filter central frequency: Hz Bandwidth: 2.0 Hz Integration time: 14.5 days
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis TILTMETERS GYROLASER MONOLITHIC FIBERS COATING STUDIES
Tiltmeters ROMA2 - PISA Tiltmeters A.DI VIRGILIO Gyrolaser G-Pisa
Tilt Control
Crystal
VIRGO – PISA Commissioning & VIRGO + AdV & Future Data Analysis AdV Suspensions
Blade Springs Antimolle Magnetiche 8 m
Sisma sul terreno Sisma residuo allo specchio Rumore Termico
MIRROR 2 x m Hz -1/2 1.2 x m Hz -1/2 TF < 1.7 x TOP 34
!! TOP MIRROR TF = 1.26 x
Upper limit Horiz Upper limit Vertical 36
several microns mirror swing 37
ADC DSPDAC Actuators Accelerometers RESIDUAL SWING < 0.1 m
Digitale Analogica
40 CONTROL NOISE - OK for AdV
Mirror Reference Mass Marionetta 3 VERTICAL MODES F7 -Blades 7 Hz15 Hz 40 Hz 41
Freq (Hz) Displacement Strain (m Hz^-1/2) MODES VISIBLE IN DF 42
Virgo AdV 43 A FEW UNITS Upper Limit Stringent Upper Limits (AdV OK)
44 SA compliant with AdV Superattenuators validated for 2° generation Passive Attenuation Microglitchness Control Strategy Virgo+ Monolithic Test
HORIZONTAL Change both number of filters and their distance (thus varying the total length) 45 TF
3 rd GENERATION: Use identical technology with cross-over below 2 Hz 46 CONCLUSION Present SA extension 9 17 m (1.8 Hz conservative cross-over )
WIND SEA MIRROR ACTUATION 47 The wind problem
Tilt 48
SAFE
Schema Ottico
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
MeccanicaElettronica
Personale Assegnato a costruzione AdV (gia’ discusso)
1.5 Tecnico Alte Tecnologie 100% (incluso SAFE) Assembly Team Supervision Filter Assembly
Pisa - Data Analysis TIER 2 – Pisa CPU: 100 (200) Numero di processi: 100 Jobs (con tempi tipici di 4 h) Potenza calcolo: 10 GFlops per core RAM: 1 GB per core Accesso RAM: 1 GBps I/0 su disco aggregata: 400 MBps Storage: 8 TB Resp. Giancarlo Cella
1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
MISSIONI INTERNE: 145 k€ (2010: 100 su 139 richiesti ) MISSIONI ESTERE: 45 k€ (2010: 36 su 45 richiesti ) CONSUMI 10 Electronic lab mantein. 5 SSFS Digital (consumable) 5 Digital Mixer (consumable) 12 Crystal 14 Susp Mechanics SAFE programme 5 Tiltmeters consumable 51 k€ (2010: 26 su 53 richiesti ) Richieste (Provvisorio)
COSTRUZIONE APPARATI 10 – Rivisitazione Filtro 1 (damping verticale) 12 – Laser Pointing System for IP control 10 – New monitoring Filter 7 7 – New remote adjustment mechanism 8 - Coating 8 – SSFS digital control (APP) 8 – Mixer Digitale (APP) 14 – Thermal compensation system 77 k€ (2010: 50 su 84 richiesti ) INVENTARIO 15 k€ Storage TIER2 (8 TB) 15 k€ ( su 15 richiesti ) TOTALE: 323 k€ (2010: 213 su 337)
Stanze Pulite + Mech Labs G-Pisa in lab ottica VIRGO Spazio Attività Coating 1) Virgo + 2) AdV 3) Pisa 4) Servizi 5) Richieste 6) Spazi
Conclusions VIRGO sta funzionando Richieste 2011 incentrate su sviluppi Superattenuatori Impatto sui servizi e spazi di sezione definito Pisa e’ responsabile di molte attività I Superattenuatori sono in specifica per AdV Dubbi da sciogliere sullo schema ottico per AdV Ancora debolezza sulla manpower elettronica