17 settembre 2009 CSN1-Ferrara 1 Stato del progetto RICH di LHCb Preparato da Clara Matteuzzi Presentato da Flavio Fontanelli Partecipanti italiani: Genova.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

Italiano Da quando siamo passati al corso di metallurgia (3^o ) abbiamo cominciato a lavorare utilizzando i maniera didattica tecnologie di tipo hardware.
Queuing or Waiting Line Models
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Motor Sizing.
Distribuzione del numero di alleli condivisi da coppie di fratelli e di non-parenti tipizzati rispettivamente per 5, 9 e 13 markers.
A man has decided to include in his home intelligent systems to monitor the home. He installed two water pulse counters into the central water system.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
PINK FLOYD DOGS You gotta be crazy, you gotta have a real need. You gotta sleep on your toes. And when you're on the street. You gotta be able to pick.
INSIDE UPDATES M. Giuseppina Bisogni PISA, 16/09/2014.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
G. Costa, Roma 16 maggio 2006 Commissione I LAr: status report 1.
Ontologia AA F. Orilia. Lez. 16 Discussione dell'approccio controfattualista di lewis condotta da Antonio De Grandis.
Fatti principali dei precedenti 12 mesi. - Presa dati (al ) : 6.23*10 19 p.o.t. - DAQ >99%, eventi on-time in 2009 (≈ 5500 in.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
Metodi Quantitativi per Economia, Finanza e Management Lezioni n° 7-8.
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
Taccani1 7.4 Identification ANALISI DEI PERICOLI Hazard Analysis Identificazione Valutazione Misure di Controllo Control Measures Assessment.
Accoppiamento scalare
Jojo was a man who thought he was a loner But he knew it wouldn't last. Jojo left his home in Tucson, Arizona For some California grass. Get back, get.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
MUG-TEST A. Baldini 29 gennaio 2002
SUMMARY High efficiency motors RIEPILOGO Motori ad alta efficienza RIEPILOGO Motori ad alta efficienza.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
SUMMARY Dinamic analysis RIEPILOGO Analisi dinamica RIEPILOGO Analisi dinamica.
RIEPILOGO Transistor JFET
1.STATO DELL'ANALISI DEI DATI RUN FASE 2 CSN1, 23 settembre 2003.
SUMMARY Transmission and distribution of the electric energy RIEPILOGO Trasmissione e distribuzione dell’energia elettrica RIEPILOGO Trasmissione e distribuzione.
Summary Module 1 – Unit 1 (Current, potential difference, resistance) RIEPILOGO Modulo 1 – Unità 1 (Corrente, tensione, resistenza)
Filtri del secondo ordine e diagrammi di Bode
 SLP Tests in VME test stand: Saverio – Pierluigi (Daniel)  New test stand: Enrico (Saverio – Pierluigi)  VME Tests versus new test stand tests (Enrico-Saverio-Pierluigi)
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
SUMMARY Real operational amplifiers RIEPILOGO Amplificatori operazionali reali RIEPILOGO Amplificatori operazionali reali.
Project Review Novembrer 17th, Project Review Agenda: Project goals User stories – use cases – scenarios Project plan summary Status as of November.
SUMMARY Interconnection of quadripoles RIEPILOGO Interconnessione di quadripoli RIEPILOGO Interconnessione di quadripoli.
Il Calendario.
40 years of the Italian JPO Programme: an overview 14 dicembre Camera dei deputati - Roma Giovani italiani nelle Nazioni Unite: una storia lunga.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
Rapporto del gruppo di lavoro sui criteri richiesti per essere autori di Atlas Italia G. Carlino, S. Falciano, L. Mandelli 5/30/2016.
LHCB : proposte dei referee Chiara Meroni Marcello Maggi Sandra Malvezzi Roberto Ferrari.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Buon giorno, ragazzi oggi è il quattro aprile duemilasedici.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
Minimal Emergence of Darunavir Resistance at Treatment Failure: Are Interpretation Algorithms Adequate? Gaetana Sterrantino* 1, Mauro Zaccarelli 2, Maurizio.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
STMan Advanced Graphics Controller. What is STMan  STMan is an advanced graphic controller for Etere automation  STMan is able to control multiple graphics.
Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie (aggiornamenti) Domenico Elia Riunione Referee Calcolo LHC / Bologna, Riunione con.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Michele Iacovacci (Napoli),
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
JetWalk: Agenda e review committee
Stato del progetto RICH di LHCb
Accelerator Disision March 3rd 2015
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Atlas Milano Giugno 2008.
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

17 settembre 2009 CSN1-Ferrara 1 Stato del progetto RICH di LHCb Preparato da Clara Matteuzzi Presentato da Flavio Fontanelli Partecipanti italiani: Genova e Milano

1. Hardware 2. Commissioning activities 3. Software CSN1-Ferrara 2 Highlights on what is new since the last report Status of the RICH project HPD High Voltage RICH1 – RICH2 settembre 2009

CSN1-Ferrara 3 The LHCb spectrometer Vertex Locator RICH counters  /K/p Identification Tracking Calorimeters Muon System Special features: a dedicated trigger and Particle Identification

4 HPD status The evolution of each tube is under control all the tubes going bad are predictable Considering the new schedule of LHC, we have time (until probably september 2009) to replace the tubes which are expected to glow in RICH-2 in 2009 and This will assure a safe and stable operation of the RICH detectors for the next long period of running. Financial aspects: An agreement with DEP-Photonis has been reached and forsees 150 tubes to be repaired at a shared cost 50% -50% between LHCb and DEP over 10 years settembre 2009 CSN1-Ferrara

5 Thresholds of glowing: –no glowing HPD for IFB < 5% – lower threshold at IFB > 5% i.e. HPDs can turn glowing at any point between IFB=5…8% Ion Feed Back (%) number of HPD full HPD sample (550) IFB measurement (cw laser method) settembre 2009 CSN1-Ferrara

RICH2 – Status Map (before intervention) 8_1819_1019_1209_ _1278_153 9_29_ _121 9_109_ _1079_71 8_ _112 8_609_ _1478_ _ _1559_1488_1359_ _1338_1249_ _ _1379_128_122 9_2659_ _1609_1428_1979_56 9_3 11 8_1108_134 8_ _156 9_ _1578_178 9_159_1259_2508_ _1199_104 8_1268_ _1309_1239_118_108 C0C1C2C3C4C5C6C7C8A0A1A2A3A4A5A6A7A8 27 glowing 10 not glowing IFB>5% already 9 not glowing IFB>5% in not glowing IFB>5% in HPDs CSN1-Ferrara settembre 20096

HPD RICH2 replacement summary of intervention march removed HPDs –32 shipped to Photonis-DEP (with 1 bake-out) –7 with 2 bake-outs –1 recovered 28 replacement tubes installed –22 repaired –1 reference tube –5 spare tubes from RICH2 spare column 12 anodes installed (no ‘active’ pd) 17 tubes “at risk” for 2009 and 2010 to be replaced with the new repaired from Photonis-DEP ( if back in time before closing detector) CSN1-Ferrara settembre 20097

CSN1-Ferrara _1138_ _153 9_278_ _1079_114 9_ _146 8_1619_ _609_4 05 8_ _310_1478_1359_ _1369_14710_ _ _428_1188_160 9_2659_ _12810_2 91 9_1019_56 10_ _2029_223 4_ _110 8_ _369_124 9_699_1259_2408_ _1198_ C0C1C2C3C3 C4C5C6C7C8A0A1A1 A2A3A4A5A6A6 A7A8 RICH2 map – after repair campaign #1 ( March 2009, from Stephan ) use HPDs LC>3  A redeploy HPDs replace by anode repaired & spare HPD LC pair RICH2 – HPDs status settembre 2009

CSN1-Ferrara 9 (as at end of august) 3-4 more glowing tubes seen in RICH2 (“dark green” arrowed tubes on slide 8, during HV ramp-up of 25 th August. 10 repaired tubes available RICH2 access possible and granted till end of october HPD status HPDs status

CSN1-Ferrara 10 HPD-related tasks  IFB studies IFB results from pit data (end June) seem to confirm good quality of repaired tubes IFB studies on-going before LHC startup. More data sets required. regular dedicated IFB runs required after LHC startup (ALICE readout mode). settembre 2009

RICH-1:commissioning of the MDMS system CSN1-Ferrara 11 The lower photon funnel was installed on February 5 th,the upper photon funnel on February 19 th settembre 2009 News on MDMS measurements –Test with B field on the july sets of runs with B on and B off –Possibility of exercising the MDMS again on September th.

RICH Operation Meeting12 Axial Correction Translational Correction RICH 1 Magnetic Field Distorsion

RICH Gas C4F10 circulating in RICH-1 since beginning of July (for cosmics). RICH-2 at present with dry air. CF4 ready to circulate few days before collisions P and T of gas continuosly monitored settembre CSN1-Ferrara

RICH High Voltage In April we had seen a number of channels showing HV glitches with (saturated) over current and large under-voltage.  Histogram below shows the number of spikes seen on each ISEG channel between August 2008 and April settembre D0 CSN1-Ferrara

La Iseg e’ stata contattata e gli e’ stato chiesto di risolvere il problema. La ditta ha riconosciuto il suo torto, ha ripreso tutti gli alimentatori ed ha provveduto a ripararli gratuitamente. Il problema e’ legato ad un errore di fabbricazione della Iseg: “ We think we have found the reason for the sparks. It looks like the HV cable inside of the filtering circuit was placed wrong because of misinterpretations of the manufacturing prescriptions. Not all of these units have been manufactured by the same person, so some show this effect and some not.” Nel corso dell’estate gli alimentatori sono stati reinstallati e sono adesso in funzione sull’esperimento, alcuni moduli sono stati lungamente testati a Genova. I test condotti sull’esperimento in agosto su entrambi i Rich mostrano al massimo una sola microscarica su poche colonne. I test condotti a Genova non mostrano più alcuna scarica. Naturalmente i test continueranno sia a Genova che al CERN per verificare se il problema e’ stato risolto definitivamente. Bologna 4 settembre 2009 Flavio Fontanelli

RICH High Voltage RICH 1 and 2 ISEG supplies refurbished by manufacturer.  Possible systematic flaw was identified (by ISEG) in the routing of cables within the HV filtering circuit.  RICH 1 HV re-installation 10 th July. Possible problems identified with two ISEGs (that were replaced).  One tested OK in the lab  One breaks down at 18kV in the lab with audible discharge. One supply discovered with only single output connected.  24 th July. HV back in RICH 2. settembre CSN1-Ferrara

17 First ‘real data’ Cosmics in RICH-1 C.Matteuzzi, CSN1 Padova, 19 maggio 2009 settembre 2009CSN1-Ferrara Rate: total trigger rate 12 mHz cosmic events 0.38 mHz

settembre 2009 CSN1-Ferrara 18 First ‘real data’ Cosmics in RICh-1

settembre 2009 CSN1-Ferrara 19 First ‘real data’Cosmics in RICh-1 Ring in Panoramix mm

settembre 2009 CSN1-Ferrara 20 Ring radii distribution First ‘real data’Cosmics in RICh-1

21 RICH Commissioning The first priority is to be ready for collisions Effort to insure better: reliability, stability and safety Important progress in: HV stability L0 and L1 error monitoring Cooling plant stability and monitoring A few more software coded reactions to alerts and alarms Timing controls System routinely on HV (-18 kV) and Si bias on HPDs settembre 2009 CSN1-Ferrara

22 In preparation detailed schedule for piquets and shifts. At the start-up, regular shifts dedicated to RICH (3 persons/day + 1 for DQ) “On call Piquet” will also activated ( a week piquet for running time) Training course are held for “will be” piquets and shifters. RICH running settembre 2009 CSN1-Ferrara

RICH Calibration and Software Alignment and calibration strategy and studies are progressing well. RICH PID calibration with D* → D (K  )  Calibrate RICH PID using pions and kaons from D* decays selected using kinematics only. Samples need to selected in bins of P and Pt. PID efficiency, mis-ID and DLL for a specific physics channel must be weighted for the relevant P and Pt distributions (using as base the D* decays). Very good progress on study to use also  ->  p, K 0 → , Φ→ KK for PID calibration. settembre CSN1-Ferrara

settembre 2009 CSN1-Ferrara 24 K S 0  ππ selection with 98% purity  p π selection with 98% purity PID Calibration

settembre 2009 CSN1-Ferrara 25 Comparison with PID Montecarlo estimate PID Calibration

settembre 2009 CSN1-Ferrara 26 RICH system ready to take data Success in detecting and reconstructing cosmic rings:  used for exercising the on line monitoring  events recorded reconstructed with the offline software

settembre 2009 CSN1-Ferrara 27 Backup slides

settembre 2009 CSN1-Ferrara 28 Responsabilita’ del gruppo di Genova Rivelatore A.Petrolini Coordinamento RICH ECS Responsabilita’ SW alte tensioni Responsabilità ECS interfaccia del RICH con data-base, servizi esterni e infrastrutture F. Fontanelli Responsabilita’ alimentatori alta tensione

settembre 2009 CSN1-Ferrara 29 Responsabilita del gruppo di Milano Rivelatore C.Matteuzzi RICH Project Leader Radiatore aerogel D. Perego RICH commissioning G. Pessina Distribuzione e stabilizzazione dell’alta tensione dei RICH Analisi M. Calvi Co-Convenor CP measurements, responsabile per stripping e tagging, membro del PPG C. Matteuzzi Co-Convenor of F-WG (convenor per Exotica), membro dell’editorial board

Calibrazione e allineamento del Rich - Genova Nell’ambito degli studi di calibrazione/allineamento degli HPD e` stato sviluppato un GAUDI Algorithm di monitoraggio cha analizza gli eventi e cerca di evidenziare rotazioni e disallineamenti degli HPD. Utilizzando gli spot luminosi generati da un beamer e forzando delle rotazioni artificiali degli HPD nel database si e` studiata la sensibilita` degli HPD ad eventuali disallineamenti dovuti ad es. a rotazioni interne dei sensori. (Un’osservazione dei plot degli spot qui sotto riportati mostra che solo a partire da una “rotazione forzata “ di 20 mrad si osservano delle deformazioni nella locazione dei picchi)  mrad  mrad  mrad

settembre 2009 CSN1-Ferrara 31 RICH MoF cat B for 2010

32 Linear IFB Projection into 10 th year 100 HPDs will have >4% projected IFB after 10 years ~30 HPDs in Overflow Definition of ‘glow discharge’ settembre 2009 CSN1-Ferrara