Stato di BaBar Roberto Calabrese Università e INFN – Ferrara Commissione I settembre 2008.

Slides:



Advertisements
Presentazioni simili
Computing: Attività 2010 Reprocessing e ri-simulazione dati Run7 Extra-production di dati MC alla Y(4S) 10 x cross section bb e cc, 2 x cross section u.
Advertisements

Computing: Attività 2009 Reprocessing e ri-simulazione dati Run7 Extra-production di dati MC alla Y(4S) 10 x cross section bb e cc, 2 x cross section u.
Computing: Attività 2011 Limitate produzioni di MC e skim E il dataset finale (rel24/26) Grosso sforzo per il Long Term Data Access project: cluster di.
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
Maurizio Biasini CdS INFN Perugia 4/7/03
BaBar Perugia Composizione Gruppo (3.1 F.T.E.) Richieste
Queuing or Waiting Line Models
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Motor Sizing.
A man has decided to include in his home intelligent systems to monitor the home. He installed two water pulse counters into the central water system.
WP4 – Software Infrastructures. How it was Overall goal “The outcome of WP4 is the design, implementation and evaluation of software components that will.
1 Alcuni highlights da LT  Sommario breve  Novità più interessanti nel settore dell’ astroparticle  Gli esperimenti di DM hanno dei risultati che lasciano.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
CDF Relazione dei referee G. Bruni, P. Giubellino, L. Lista, P. Morettini, L. Moroni, V. Vercesi CSN1 – Maggio 2007.
PROPOSTE PER CMS Calabrese Campana Morandin ( ) Discussione sj locali + fondo indiviso per DT + RPC + MI ECAL (il resto e’ rinviato a settembre)
4/20/20151 Metodi formali dello sviluppo software a.a.2013/2014 Prof. Anna Labella.
Fatti principali dei precedenti 12 mesi. - Presa dati (al ) : 6.23*10 19 p.o.t. - DAQ >99%, eventi on-time in 2009 (≈ 5500 in.
1 CSN1 - Lecce 22/09/2003 Babar Relazione e proposte finanziarie Referee: M. de Palma, P. Lubrano, C. Luci, L. Perini,A. Staiano.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
Perugia - 12 novembre 2002 M. Morandin - INFN Padova Budget calcolo Babar 2003 e contributo INFN.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
CSN1-Assisi L.Perini1 BaBar Calcolo L. Perini per i referees: L.Perini,A.Staiano…
Lezione 6: gamma Matrice CKM e unitarietà Misura di precisione di sin2  Media mondiale ± Misura di  in decadimenti senza charm Misura diretta.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
The MAGIC Telescope Preventivi 2013 per il gruppo MAGIC di Padova Richieste ai servizi di sezione Mosè Mariotti INFN Sez di PADOVA, STATUS e Prospettive.
CdS-7 ottobre 2003 CNSIII_Bilancio 2004 Disponibilità per il 2004: 14.5M¤ di cui M. E 3.95M¤, Consumo 3.4M¤ FTE 468 progetto SPES upgrading DAFNE iniziativa.
CDF Relazione dei Referee G. Bruni, P. Giubellino, L. Lista, P. Morettini, L. Moroni, V. Vercesi CSN1 – Maggio 2006.
CDF 2005 Sett P.Giubellino, F.Lacava, P.Morettini, L. Moroni, V.Vercesi.  2005: presa dati e analisi;  Commissioning preshower;  Completamento.
BABAR: relazione dei referee M.De Palma, C.Luci, A.Staiano B.Gobbo, M.Sozzi (calcolo) Trieste,
MUG-TEST A. Baldini 29 gennaio 2002
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
1.STATO DELL'ANALISI DEI DATI RUN FASE 2 CSN1, 23 settembre 2003.
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
15.11,2005 LNFMarcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa ROADMAP B and SUPER B in Italia Gruppo1 LNF 15Novembre, 2005.
MS - NA62 TDAQ INFN – Settembre 2011 TDAQ in generale Distribuzione clock/trigger: progetto definito, moduli finali in arrivo (?), installazione prevista.
Filtri del secondo ordine e diagrammi di Bode
 SLP Tests in VME test stand: Saverio – Pierluigi (Daniel)  New test stand: Enrico (Saverio – Pierluigi)  VME Tests versus new test stand tests (Enrico-Saverio-Pierluigi)
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
CMS – Richieste finanziarie Tracker M.Est. – partecipazione test beam M.Int. – Meeting di consorzio italiano Consumi – Quasi partenza produzione, tooling.
CDF I referee Roma, 16 Maggio Tevatron OK Fisica Stanno pubblicando –Bene Nostre principali preoccupazioni su B s -mixing –Sulla base dei loro.
BABAR: relazione dei referee M.De Palma, C.Luci, A.Staiano Assisi,
Presentazione documenti inviati al RRB e piani futuri Commissione Scientifica Nazionale I 13 ottobre 2003 S. Patricelli Punti principali in discussione.
Preventivi CdS PadovaS.Dusini - INFN Padova1 S.Dusini “INFN: What Next” New directions WG.
SuperB – referee report W. Bonivento, M.Masera, D. Pedrini, L. Rossi, C. Troncon 21/01/13Leonardo Rossi1.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
1 referee-BaBar CSN I, LNF giugno 2007 RELAZIONE DEI REFEREE DI BaBar M.De Palma, C.Luci, C.Troncon, B.Gobbo(calcolo) 26 giugno 2007.
Roberto Esposti 1 Facoltà di Economia “G. Fuà” Università Politecnica delle Marche Facoltà di Economia “G. Fuà” Università Politecnica delle Marche PowerPoint.
1 referee-BaBar CSN I, Roma Gennaio 2008 RELAZIONE DEI REFEREE DI BaBar e SuperB M.De Palma, C.Luci, C.Troncon, B.Gobbo(calcolo),D. Pedrini
Riunione CSN1, Roma, Gennaio 2012F. Bedeschi, INFN-Pisa 1 Riunione CSN1  Comunicazioni  Comunicazioni varie  Riunioni future  Similfellows  Regole.
Gruppo 1: Stato attuale e risultati recenti Consiglio di Sezione, Milano, 5 luglio 2012 Attilio Andreazza Università di Milano e INFN.
Richieste IFR 2011 Roberto Calabrese Università e INFN – Ferrara Marzo 2011.
CSN1 - Pisa 17/09/2008 P-SuperB proposte finanziarie Referee: M. de Palma, C. Luci, D.Pedrini, C.Troncon.
Status di EMC (forward) e richieste finaziamenti C. Cecchi Università di Perugia e INFN - Physics analysis - Mechanical test - Electronics - Simulation.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
TOTEM: rapporto dei referee C.Bini, M.Curatolo, P.Paolucci 21 settembre 2007.
1 Computing di BaBar Fabrizio Bianchi Universita’ di Torino e INFN Sez. di Torino Roma, 20 novembre 2007.
LUNA. The Ne-Na Cycle 22 Ne(p, g ) 23 Na Q=8.8 MeV Only upper limits (μeV) on the strength of the 14 possible resonances below 400 keV (factor 2000 on.
Esigenze di Rete degli Esperimenti LHC e di Gr1 G. Carlino – INFN Napoli CCR – Roma 8 Settembre 2014.
RELAZIONE DEI REFEREE DI BaBar
Babar passato, presente e futuro … e proposte finanziarie
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Riunione di ATLAS Italia - BO
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
Proposal for the Piceno Lab on Mediterranean Diet
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

Stato di BaBar Roberto Calabrese Università e INFN – Ferrara Commissione I settembre 2008

~5/fb scan above 4S

Il Run 7 Feb 29 fine del run alla Y(3S)  30 fb -1 on resonance  2.8 fb -1 sotto il picco  Circa 120M di eventi (x10 Belle, x20 CLEO) Mar 28 fine del run alla Y(2S)  14.5 fb -1 on resonance  1.5 fb -1 sotto il picco  Circa 100 M di eventi (x12 CLEO) Dal 28 marzo energy scan sopra la 4S  4.5 fb -1 (x50 dati esistenti)  Ricerca di nuovi stati Apr 7 fine presa dati

~30/fb Y(3S) run 14.5/fb Y(2S) run  Ground state of bottomonium  b  Invisible width of  S)  Search for light Higgs/exotica  Measurement of R vs S above the  (4S) and parameters of “5S”, “6S”, and other interesting structures …. Some of the key measurements aimed at from this data: ~5/fb scan above the 4S Already an important result...

Bottomonium states

First observation of  b meson >10  significance (incl. systematics)  s   b Background subtracted  b peak 3S   bJ (2P) ->  S ISR  Photon energy spectrum from Y(3S)

Risultati relativi all’  b Splitting iperfine Massa Branching ratio

Complete the Flavor decay program:  The CP violation measurements in B decays  The ultimate job on CKM parameters – until Super B  Searches for New Physics in B, Charm and Tau decays Expansion of the core program with the new data at the Upsilon resonances:  Search for New Physics in Upsilon decays  The first opportunity to study hyperfine splittings in the bottomonium system & observation of singlet states.  Study the structures above the Upsilon(4S) Search for anomalous states BaBar Physics program 90 new results at ICHEP2008

° o ° ° ° ° ° ° ° ° ° ° D 0 mixing, exclusive V ub B-tagging convener TD analyses and BF of charmless decays (  K S,  K/ ,  'K S,  ' ,  ' ,  'K L, a 1 , a 1 K, K 1  K  Charmonium ( convener, B  cc  hadrons, B  cc[h C  ]K),  K S, bottomonium,  HFAG member) Rad. Pen., Tau and Breco conveners  (DK GLW&Dalitz),  lifetime, inclusive B  s , B  D* , ,  l K s,  K s  0  D 0 mixing,  lll ISR convener, sin2  in cc, sin(2  +  ) D , 3-body, D Dalitz,  (DK ADS & Dalitz), sin2  (  ),  K, KK, sin2  (TD and BF of  K, , KKK), B  ll, D 0 mixing, exclusive V ub,  B  K*  2  HFAG members sin2  (B  →D 0(*) h 0 ), V cb (B  D * l )‏ Semileptonic convener V cb (B  D ( *) l ), B lifetime & mixing, CPV in mixing, B(D  K  WA,  Inclusive V ub inclusive V ub, V cb (B  D * l ), charmonium, bottomomium,   DK ADS,GLW), charmless 3- body (K ) ‏ v, ISR, gamma- gamma, HFAG member sin2  in cc, CPV in mixing, B  K* sin2  ( D*D*), ISR, gamma-gamma   (DK GLW & Dalitz), sin2  in cc Leptonic Conv. B with hadronic tagsB  D*a1 3-body D Dalitz, ISR, gamma-gamma, light meson spectroscopy, D sJ *, exotics,D (s) (*) D (s) (*) Babar Italia 2008

La comunità italiana è piuttosto compatta BaBar FTE SuperB 2009 (percentuali provenienti da fisici di BaBar)15.2 FTE BaBar FTE

Il bilancio preventivo 2009 Costruito con gli algoritmi standard  M.I. 1.4 KEuro/FTE  M.E. 1m.u./FTE, 1 m.u.=6.7 KEuro + incarichi specifici  Consumo 1.7 KEuro/FTE Fondo comune K$ (quota 290K$ meno credito di 15 K$) -> 185KE Richieste per smontaggio rivelatore (sj)  M.E. 12 m.u.  Consumo 20 KE  Trasporti 20 KE

BA - FE0.7 Calabrese(IFC-0.7) GE4 Patrignani (AWGc, Y(3S) Task force, PubBoard) LNF 2 Peruzzi (PubBoard-1), Finocchiaro (SpeakersBureau-1) MI1 Lombardo (Btagging-1) NA2 DeNardo (AWGc-2) PD2 Rotondo (AWGc-2) PG - PI6 Walsh(AWGc-2), Lusiani(AWGc-2), Marchiori(AWGc-2) RM2 Anulli (AWGc-2) TO3 Bianchi(Comp-1.5, Chair CSC-1.5) TS6 Cartaro (DQG+Long term Data Access-6) Incarichi specifici 2009 in mesi-uomo Numero di m.u. totali: 28.7 (2009) 71.2 (2008) 87.7 (2007)

2008 Ricostruzione e simulazione dati Run7 Reprocessing (ricostruzione, simulazione e skimming ) dei dati alla Y(4S) –Sara’ il dataset finale (rel24) Stato e prospettive del calcolo INFN Padova (Castelli, Solagna, Stroili + shifters): –Ricostruzione Run7 + reprocessing Run1-6 –Simulazione da fine reprocessing in poi –Mantenimento seconda copia dei raw data CNAF (Fella, Ligioi): –Analisi AWG Charm + Y(3S) + Y(2S) Simulazione su GRID (Andreotti, Luppi, Fella, Ligioi) Tasks tipo C: Operations (Bianchi), RQM(Pelliccioni), Ricostruzione a SLAC (Cartaro), DQG (Cibinetto), Physics Software (Petrella)

INFN Simulazione su GRID, Mantenimento seconda copia di raw data a Padova, Supporto analisi al CNAF. Serve conservare quanto abbiamo al CNAF: –CPU sono condivise –Spazio disco: 265 TB TB (gara 2008, in arrivo) Analisi ancora su dati rel18 e rel22 Dati rel24 (dataset finale) disponibili solo a fine 2008 Al momento serve la capacita’ di ospitare tutte queste releases Asintoticamente (2010) ospiteremo solo rel Simulazione, Skimming, Supporto per l’analisi (intense analysis period): SLAC. IN2P3, CNAF, Gridka Stato e prospettive del calcolo

L’apparato è stato mantenuto in uno stato ‘hot ready’ per circa 3 mesi, e di seguito è iniziata la transizione al ‘minimal maintenance state’ (MMS), che verrà completata entro settembre. Successivamente bisognerà gestire la transizione alla fase di disassembly & disposal (DND). Seguono alcune slides mostrate da D. MacFarlane (deputy director PPA Division di Slac) alla riunione IFC di luglio Un subpanel è stato formato che ha come compito quello di trovare un agreement soddisfacente per tutti (da ratificare alla prossima riunione IFC) Stato dell’apparato e questioni riguardanti lo smontaggio

BABAR Disassembly & Disposal Planning BABAR Detector Cerenkov Detector (DIRC) Quartz bars, support structure, phototubes (?) 1.5 T Solenoid Reuse Electromagnetic Calorimeter Barrel CsI crystals & support structure; some endcap CsI (?) Drift Chamber Display Instrumented Flux Return RPCs: discard; LSTs: no known use case yet; steel: potential reuse or recycle (?) Silicon Vertex Tracker Display e + (3.1 GeV) e - (9 GeV) ‘

BABAR Disassembly & Disposal Planning

Additional variable for IFC: timing of transition  Issue: retaining assurance about strategic re-use of BABAR systems, in particular for SuperB o Strong desire by a large part of BABAR community, including SLAC, to see re-use as part of a SuperB project o Turning detector ownership over the DOE early will result in a loss of control over disposal choices  Issue: delaying transfer complicates proceeding with planned DND schedule o According to our schedule, which is fully funded in the Presidential budget for FY09, we would be removing equipment and systems in calendar 2009  Proposal: ownership of BABAR be transferred SLAC & DOE on March 1, 2009 o IFC members would continue to contribute to BABAR OCF through March 1, 2009 o Collaboration continues to manage transition to MMS and monitoring of BABAR while MMS is maintained o When BABAR is declared complete, present owners can either recover their equipment prior to March 1, 2009 (at cost) or SLAC will disburse equipment on the basis of requests for re-use

BABAR Disassembly & Disposal Planning Summary  Initial transition & DND planning well underway o Reviewed by DOE on August 6-7, 2007 Recommendation that planning for DND phase start in FY08 and execution should begin as soon as possible o Transition to MMS will now occur in FY08 and as a straightforward extrapolation from operations o Planning for DND has begun in FY08, with preparations in FY08-FY09, and planned execution in FY09-FY12  Several issues for BABAR IFC to resolve o Proposal of transition in ownership of detector components on March 1, 2009, leaving DND responsibility with SLAC and DOE o SLAC will make a call for re-use proposals in anticipation of this transfer date, providing an opportunity for SuperB requests o DOE & SLAC will require contributions to offset DND costs from partners requesting re-use of equipment  Goal: Agreement in principle at this meeting, final signoff at January 2009 meeting

Smontaggio rivelatore Materiale da recuperare da Slac SVT A) Installato e PARTE DELL'ESPERIMENTO-da negoziare Pisa/Torino Cavi Neri HDI + Spares installati 108 Cavi Neri DAQ + spares installati 32 CAEN mainframes SY Boards A522(A) installate 104 Boards A526 installate 14 - Pisa Boards A515 centertap 1 Cavi centertaps e interlock - Pisa/Torino CAENet VME controller B) Spares non installati- Pisa/Torino Cavi neri short 7 Cavi neri long 2 Scatola di schedine carico- Pisa Agilent P.Supply 6614C 1 Kepco progr. power supply 1 Board A515 1 Keithley Keithley Cable per Cable GPIB + others GPIB PCMCIA card 1 Laptop DELL + CD unit 1 Braccialetti e bags antistatici- Pisa/Torino CAENet VME controller 1 CAEN crates SY Boards A522 spares 4+5 Boards A526 spares 2 Spare parts for SY527 and A522 - Pisa Modulo Teststand L1 + matching card+ tail Modulo Teststand L3

IFR Ferrara – Genova Description Location Quantity FEC crates (with CC and PS) IR2 Hall 12 FEC cards into the crates 192 Trigger boards into the crates 6 Crate Service Card into the crates 12 elettronica DAQ (INFN-NA)crates + Lab spare FECs Lab 30 spare Trigger Board Lab 1 spare CSC board Lab 1 spare crate controller Lab 1 spare crate PS Lab 2 LST signal cables IR2 Hall 768 different length

In conclusione La presa dati è finita, ma c’è ancora molto da fare!  Abbiamo diversificato la fisica  Siamo riusciti ad esplorare nuovi territori che ci stanno rivelando interessanti sorprese  L’analisi dei dati alla Y(4S) è tutt’altro che finita La comunità italiana è compatta, sia nel portare avanti le analisi dei dati di BaBar, sia nel lanciare il futuro di questa linea scientifica: SuperB

Backup slides

 351 papers published/submitted  70 papers in 2007 & 24 in 2008  90 new results at ICHEP2008  >200 Ph.D. Thesis  >300 Postdocs so far

A list of topics on BaBar’s “core” physics program The ultimate job on CKM – until the SuperB era Search for New Physics A major effort underway to perform these measurements ~ 2/3 of the core measurements performed with <1/2 of the full dataset

Operating Common Fund Basis OCF 08 count (based on October 16, 2007): 328

OCF 2009