MANAGMENT M. Giuseppina Bisogni PISA, INSIDE Meeting 20/1/2016.

Slides:



Advertisements
Presentazioni simili
Editors: Paolo Colautti, Davide Moro
Advertisements

Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
INSIDE UPDATES M. Giuseppina Bisogni PISA, 16/09/2014.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
An anomalous positron abundance in cosmic rays with energies 1.5–100 GeV PAMELA First Result from the Alpha Magnetic Spectrometer on the International.
ICT cloud-based platform and mobility services available, universal and safe for all users PRESENTAZIONE GENERALE
MUG-TEST A. Baldini 29 gennaio 2002
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 Closed Loop e Gas Gain Monitoring Il Closed Loop e’ in operazione stabile dopo lo.
 Single scintillating crystal 48 × 48 × 10mm  SiPM readout on both faces, 16 × 16 pixels of size 3 × 3mm  Faces readout identical and independent, with.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
Bari, Bologna, LNF, Mi-Bicocca, Napoli, Pavia, Roma3 (1), Trieste.
Definizione del piano delle attività di progetto L’esperienza CoBaSys Donata Franzi IMT Alti Studi lucca Università degli Studi di Modena e Reggio Emilia.
1 CSN I, ROMA 30-31/1/2012 AGPSilvia DALLA TORRE ERC Advanced Grant 2012 : PROPOSAL “Advanced Gaseous Photon detectors for Hadron Physics Investigation”:
Michele Iacovacci (Napoli),
AUGER Surface Detector (SD) e Fluorescence Detector (FD)
EU-IndiaGrid Project Joining European and Indian grids for escience
LHCB : proposte dei referee
M.Biasini, P. Checchia 23 Settembre Riunione CSN1
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
LHCB : proposte dei referees
Introduzione : MEG + MEG 2
Richieste 2017 HMPID e LHC_IF
M. Giuseppina Bisogni PISA, INSIDE Meeting 14/6/2016
Richiesta Cuore_dtz Padova anno2014 CdS 2/7/2013
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
Sommario TOTEM review a LHCC Franco Bedeschi CSN1, Roma, Luglio 2010
Daniele Pedrini INFN Milano-Bicocca
Comunicazioni Riunione ATLAS-Italia
SYRMA-3D MEETING 17 FEBBRAIO 2017.
Jlab12 Italia, 8thJune 2017, Roma
PixFEL PV Personale partecipante e richieste finanziarie
Digitizer ReAdout Controller Dirac
EXOTIC (7 ricercatori, 5.4 FTE)
MC-INFN.
LHCB : proposte dei referees
Ricordate questa slide mostrata a Ferrara (settembre 2009) ?
grande sforzo dove le risorse umane ed
Gigi Cosentino - LNL 20 ottobre 2016
Responsabilita’ INFN in Atlas
UA9 Relazione dei Referee
Stato di Tilecal al 10/09/2008 (primo fascio)
Responsabile locale: F. Ferro
Partecipa all’inventario sulle attività di dimostrazione
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
HIGH SCHOOL «LEONARDO DA VINCI» OF TRENTO MEETS THE EEE PROJECT
Sperimentazione clinica di INSIDE
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
DoPET DoPET is a stationary 2 heads tomograph gantry compatibility
SuperB – Richieste Sblocchi 2008
Riunione di ATLAS Italia - BO
Avviso di seminario ERASMUS+
Stato pCT e test LNS M. Bruzzi, C. Civinini, G. Maccioni, F. Paulis, N. Randazzo, M. Scaringella, V. Sipala, C. Talamonti.
RD_FA / Pisa Preventivi 2018
SuperB Richieste 2010 Francesco Forti Università e INFN, Pisa
P. Giannetti per il gruppo FTK
Marzo 2018.
AXIOMA Sviluppo di tecniche spettroscopiche su sistemi freddi per la rivelazione di Assioni Cosmologici Padova, Pisa, Legnaro, Napoli, Ferrara, Palermo,
4DInSiDe La data di avvio ufficiale dei progetti è fissata al 90° giorno dopo l’emanazione del decreto di ammissione al finanziamento. Le varianti alla.
Combined Proton Therapy and Magnetic Fluid Hyperthermia for Pancreatic Cancer Treatment  PROTHYP – 2020 experiments Partecipanti - Unità di Milano, di.
Preventivi 2020 Esperimento Mu2e
SIMP Preventivi 2020.
Transcript della presentazione:

MANAGMENT M. Giuseppina Bisogni PISA, INSIDE Meeting 20/1/2016

1/2/ /1/2016

Attualmente il progetto ha accumulato rispetto alla time-line originaria circa 6 mesi di ritardo dovuti principalmente a: -consegna dei rivelatori del sistema ibPET -consegna delle schede di Back-End per il DAQ del sistema ibPET -consegna delle fibre scintillanti per il DP -realizzazione delle schede e del FW del DAQ del DP Questi ritardi ci portano alla conclusione del progetto (1/2/2016) con i due sistemi di rivelazione (parzialmente) costruiti e collaudati su banco ma non integrati e testati su fascio del CNAO Ottenuto dalla CSN5 per il 2016 un supporto per portare a termine il lavoro di collaudo del sistema al CNAO e per mettere a punto un protocollo per la validazione del sistema in ambito clinico. La richiesta si inserisce nell’ambito del WP5 dell’ esperimento RDH

INSIDE activities in 2015 – second half In-beam PET assembly (mechanics, electronics, DAQ) (Uni and INFN Pisa & To) Mechanics ready end of September FE Asics testing on-going DAQ testing-> to be done FPGA programming -> on going, to be finalized Integration HW & SW (Uni and INFN Pisa & To, INFN Mi) Simulation finalized w protons Simulation w carbon beams Reconstruction finalized Profiler assembly (mechanics, electronics, DAQ &TRG) (RM1 & LNF) Mechanics ok Basic32 Asics testing on-going Calo FEE design ok Calo FEE testing & mounting -> to be done FPGA programming -> on going, to be finalized Integration HW & SW (LNF, MI, TO & RM1) Reconstruction V0 ready-> Event selection, noise rejection to be done Simulation finalized Six month delay with respect to schedule, to be finalized within feb 2016 Six month delay with respect to schedule, to be finalized within dec 2015

In-beam PET global device test & characterization (Uni and INFN Pisa & To) Performance Assessment w To Installation at CNAO treatment room Commissioning with Proton/Carbon Beams INSIDE activities in 2016 Dose profiler global device test & characterization (LNF, MI & RM1) Cosmic ray Proton beam LNS/TIFPA Installation at CNAO treatment room Commissioning with Proton/Carbon Beams INSIDE Commissioning of the bi-modal system w Carbon Beams Protocol definition for clinical validation

Richieste RDH_INSIDE 2016 Pisa 6 kEU 4 prese dati al CNAO per 4 persone ogni volta compreso il trasporto del materiale Roma I e LNF 5+2 kEU missioni al CNAO per calibrazione e installazione del monitor di particelle cariche Torino 6 kEU missioni per partecipare a beam test su fantoccio e pazienti Totale 17 kEU ASSEGNATI 10.5 kEU Pisa 2 kEU materiale di laboratorio Roma I 2 kEU materiali connessi con la calibrazione del monitor di particelle cariche al cnao: fantocci, materiale per la movimentazione on line del target Torino 2 kEU necessità di sostituzione di piccoli componenti durante installazione e commissioning Totale 6 kEU ASSEGNATI 0 Contiamo su residui del premiale IRPT

MILESTONE WP5: istallazione e collaudo sistema integrato di monitoring Inside al CNAO e definizione preliminare del protocollo validazione clinica Entro il

Rendicontazione delle spese sostenute utilizzando un’apposita procedura telematica che sarà resa disponibile dal ministero dal 1/02/ giorni per compilare il rendiconto (entro il 01/04/2016).  RESPONSABILI DI UNITA’, COORDINATORE NAZIONALE Relazione scientifica conclusiva sempre con modalità telematica, la sullo svolgimento delle attività e sui risultati ottenuti (01/02/ /05/2016). 90 giorni  Coordinatore nazionale SCADENZE RENDICONTAZIONE INSIDE

ISTALLAZIONE E TEST AL CNAO - sala dedicata a istallazione e parcheggio strumentazione - disponibilita’ di tempo macchina durante la notte per 2/3 ore/notte - Un turno di fascio di 8/16 h ogni due mesi - Prossimo turno domenica 7 febbraio dalle 6 alle 14

NEWS

Conferenze  F. Pennazio - XIII Turku PET Symposium, Turku, May Monte carlo simulations for in- beam PET monitoring in Hadron-TherapyMonte carlo simulations for in- beam PET monitoring in Hadron-Therapy  M. G. Bisogni - HADRONTERAPY: a new frontier for cancer treatment, CNAO foundation, September INSIDE: an integrated monitoring system for the assessment of particle therapy treatment accuracyINSIDE: an integrated monitoring system for the assessment of particle therapy treatment accuracy  F. Pennazio - II Symposium on Positron Emission tomography, Jagiellonian University of Krakov, September A study of monitoring performances with the INSIDE systemA study of monitoring performances with the INSIDE system  M. Marafini - II Symposium on Positron Emission tomography, Jagiellonian University of Krakov, September Innovative Solutions for In­ ‐ beam Dosimetry in HadrontherapyInnovative Solutions for In­ ‐ beam Dosimetry in Hadrontherapy  2015  E. Fiorina - Frontier Detectors for Frontier Physics, XIII Pisa Meeting, Isola d'Elba, May An integrated system for the on-line monitoring of particle therapy treatment accuracy (pdf) (pptx) An integrated system for the on-line monitoring of particle therapy treatment accuracy (pdf)(pptx)  IEEE NSS –MIC San Diego, USA, 31 oct-7 nov 2015 poster  F. Pennazio et al. “The INSIDE in-beam PET: test beam results with in-spill and inter-spill acquisition  M. G. Bisogni et al.” A bi-modal system for the on-line verification of particle therapy treatments”  SIF 2015 ROMA september 2015 comunicazione orale  G. Pirrone et al.” a tool for the quality assurance of hadrontherapy treatments”  ICTR-PHE 2016 Geneve feb 2016, G. Traini et al. “ Realization of an innovative Dose Profiler for online range monitoring in particle therapy treatments”  Heidelberg Symposium on Novel Techniques in Ion Beam Radiotherapy, 9-11 March 2016, M.G. Bisogni “Novel developments in PET imaging”

Papers  F. Pennazio et al.- II Symposium on Positron Emission tomography, Jagiellonian University of Krakov, September A study of monitoring performances with the INSIDE systemA study of monitoring performances with the INSIDE system  M. Marafini et al. - II Symposium on Positron Emission tomography, Jagiellonian University of Krakov, September Innovative Solutions for In­ ‐ beam Dosimetry in Hadrontherapy published on Acta Physica Polonica 2015Innovative Solutions for In­ ‐ beam Dosimetry in Hadrontherapy  G. Battistoni et al.” Measurement of charged particle yields from therapeutic beams in view of the design of an innovative hadrontherapy dose monitor” JINST proceeding IWORID 2014 IN PREPARATION  V. Patera et al. “Design of a dual-mode tracking device for on-line dose monitor in hadron therapy”, in prep.  E. Fiorina Pisa meeting 2015 accepted  A. Piliero, F. Pennazio in prep., first draft circulated

Next  ICTR-PHE 2016 Geneve feb 2016, G. Traini et al. “ Realization of an innovative Dose Profiler for online range monitoring in particle therapy treatments”  A. Sarti, TCTR 2016 HIT results, talk  Heidelberg Symposium on Novel Techniques in Ion Beam Radiotherapy, 9-11 March 2016, M.G. Bisogni “Novel developments in PET imaging”  M.A. Piliero,G. Pirrone, AIFM, Febbraio 2016 talk  F. Pennazio, ESTRO, Torino, poster  P.G. Cerello, PTCOG, Maggio 2016 ?  S. Muraro, VCI 2016, talk  IWORID  IEEE NSS-MIC

Aknowledgment  This project has been supported by Ministero dell’Istruzione, dell’Università e della Ricerca of the Italian government under the program PRIN project nr. 2010P98A75  European Union’s Seventh Framework Program for research, technological development and demonstration under grant agreement no (INFIERI)

NEWS  Collaborazione INSIDE-CNAO  Pronti documenti tecnici (schema elettrico e progetto meccanico) per fissare i requisiti minimi di sicurezza per il personale che opera nelle sale trattamento dove verranno eseguite le prove con i fantocci  approvato CNAO  Contatti con industria  Damien Bertrand-IBA  Proposta exclusive option to negotiate a royalty- bearing, limited-term, worldwide exclusive license to the Technology for PET detector  contatti per negoziazione