Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie (aggiornamenti) Domenico Elia Riunione Referee Calcolo LHC / Bologna, 9.9.2016 Riunione con.

Slides:



Advertisements
Presentazioni simili
23/01/01Alberto Masoni – GR1 - Roma1 I MODELLI DI CENTRI REGIONALI POSIZIONE DI ALICE ITALIA CENTRO ITALIANO: CPU 450 KSI95, DISCO 400 TB (INSIEME TIER-1.
Advertisements

ALICE-Italia: IL CALCOLO
1 La farm di ATLAS-Napoli 1 Gb/s 7 nodi con 2 CPU PIII a 1 GH, RAM 512 MB, 2 schede di rete a 100 Mb/s. Server con 2 CPU PIII a 1 GH, RAM 1 GB, 2 schede.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
CSN Maggio 2005 P. Capiluppi Il Computing Model (LHC) nella realta’ italiana u I Computing models degli esperimenti LHC gia’ presentati a Gennaio.
Calcolo LHC Francesco Forti, Università e INFN – Pisa Per il gruppo di referaggio: F. Bossi, C. Bozzi, R. Carlin, R. Ferrari, F.F., D.Martello, M.Morandin,
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
Massimo Masera Torino CALCOLO. Sommario 13/5/2011 Calcolo - ALICE Uso del Tier-1 e dei Tier-2 italiani Enfasi sulle attività di analisi Previsioni relative.
Domenico Elia1 Calcolo ALICE: stato e richieste 2014 Domenico Elia Riunione CSN III / Torino, Commissione Scientifica III Torino, 17 Settembre.
Referaggio Calcolo ATLAS II Gianpaolo Carlino INFN Napoli Catania, 12 Settembre 2012 Risorse e Richieste 2013 nei preventivi Aggiornamento in seguito all’allungamento.
Domenico Elia1CdG Tier1-Tier2 / CNAF ALICE Tier2 sites Domenico Elia CdG Tier1-Tier2 Bologna, 15 Aprile 2015  Infrastruttura e risorse, coordinamento.
The INFN Tier-1: progetto di ampliamento Cristina Vistoli – INFN CNAF Referee Meeting Sep
10 Ottobre CSN1 P. Capiluppi Tier2 CMS Italia 3Bari  In comune con Alice 3Legnaro  In comune con Alice 3Pisa 3Roma1  In comune con Atlas Sedi.
Referee ALICE C.Agodi, D.Calvo, A.Di Ciaccio, P.Iaselli, S.Pirrone CSN3 – Torino, 17 - settembre 2013.
ATLAS Italia – Sestri Levante, 15 Giugno 2010 G. Carlino – Richieste Run Efficiency = time for physics / total time LHC Efficiency = time with colliding.
Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie Domenico Elia Riunione Referee Calcolo LHC / Padova, Riunione con Referee Calcolo.
Calcolo ALICE1 Calcolo ALICE: stato e richieste Domenico Elia e Massimo Masera Referee Calcolo LHC / Pisa, Riunione con Referee Calcolo LHC Pisa,
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
Riunione del CSN3 Roma settembre 2012 a cura di C.Agodi e D. Di Bari.
Il Calcolo non LHC in CSN1 G. Carlino, INFN Napoli CSN1 – Firenze 20 Luglio 2015.
CSN1 – Torino, 17 Maggio 2010 G. Carlino – ATLAS: Calcolo ATLAS Calcolo LHC 2011 Attività di TeV Attività di TeV Risorse.
ATLAS computing Roberto Carlin Commissione I Roma 1/7/08 F. Bossi, C.Bozzi, R. Carlin, R. Ferrari, D. Lucchesi, D. Martello, M. Morandin, M. Taiuti.
Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie Domenico Elia Riunione ALICE Italia - Referee / Roma, Riunione ALICE Italia - Referee.
Utilizzo e Richieste infrastrutture di calcolo esperimenti LHC & non LHC G. Carlino, INFN Napoli CSN1 – Roma 7 Luglio 2016.
Domenico Elia1 Calcolo ALICE: stato e richieste Domenico Elia Riunione Referee Calcolo LHC / Bologna, Riunione con Referee Calcolo LHC Bologna,
Torino, Andrea Dainese 1 Andrea Dainese (INFN – LNL) Stato del Tier-2 ALICE a Legnaro.
Richieste Tier Alessandro De Salvo A. De Salvo – 4 giugno 2013.
Michele Iacovacci (Napoli),
Riunione ALICE Italia - Referee stato e richieste finanziarie
I costi del Calcolo LHC un update –
EU-IndiaGrid Project Joining European and Indian grids for escience
G. Carlino, D. Lucchesi, V. Vagnoni
Commissione Scientifica III stato e prospettiva Run2/Run3
Massimo Masera CSNIII Roma, 20 marzo 2012
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Collegamento a Garr-X Il collegamento alla nuova rete Garr-X dovrà garantire il massimo della efficienza nella gestione della banda. Per identificare opportunamente.
G. Carlino, D. Lucchesi, V. Vagnoni
Richieste 2017 HMPID e LHC_IF
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
Commissione Scientifica III stato e richieste finanziarie
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
Richieste preliminari calcolo non LHC
Stato tape CDG 6/10/2016.
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Gagliardi Università degli Studi e INFN Torino
Assegnazione risorse Stato INFN CNAF,
QUADRO CALCOLO IN COMMISSIONE III
INFN Il calcolo scientifico presso la sede INFN di Padova e di Legnaro
Analisi dei dati dell’Esperimento ALICE
ALICE CALCOLO richieste finanziarie e proposte di assegnazione 2017
Aggiornamenti dal Tier-1
Aggiornamento sullo stato del Tier-2 di Catania
Commissione Scientifica III stato e richieste finanziarie
IL CALCOLO DI ALICE IN ITALIA
Necessità di calcolo per MEG II e ripartizione dei costi
Riunione con Referee Calcolo LHC stato e richieste finanziarie
ATLAS Computing 2008 (Attività, risorse necessarie e richieste)
Report Calcolo Commisione III
INFN Il calcolo scientifico presso la sede INFN di Padova e di Legnaro
Massimo Masera Catania, 20 dicembre 2012
ONEDATA - distributed data caching -
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Stato Computing ATLAS Gianpaolo Carlino INFN Napoli
ATLAS: il calcolo Alessandro De Salvo
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
Atlas Milano Giugno 2008.
La richiesta si basa sulle seguenti considerazioni:
ATLAS Italia Computing Richieste 2007 (Tier-2 e locali)
2 tag: add category tight-loose
Transcript della presentazione:

Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie (aggiornamenti) Domenico Elia Riunione Referee Calcolo LHC / Bologna, Riunione con Referee Calcolo LHC Bologna, 9 Settembre 2016

Domenico Elia2Riunione Referee Calcolo LHC / Bologna, Outline  ALICE Computing status:  ricostruzione finale dati 2015 in corso (entro fine Ottobre)  proseguimento presa dati 2016 e fabbisogno T0/T1  scenario presa dati 2017  Richieste finanziarie:  richieste nel DB (come da RRB Aprile)  variazioni in discussione RRB Ottobre  margini di risparmio

Domenico Elia3Riunione Referee Calcolo LHC / Bologna, ALICE Computing status 2015 data processing  Present status and plans:  substantial IR-induced distortions in the TPC (pp and PbPb):  data reconstructed partially (low IR runs, first physics studies)  sophisticated correction algorithm developed in the past months  bulk reconstruction well advanced (started by beginning of July):  calibration procedure fully validated  expected to be over by end of October  in time to allow finalizing analysis results for the next QM (February 2017)

Domenico Elia4Riunione Referee Calcolo LHC / Bologna, ALICE Computing status 2016 data taking  Present status:  pp MB ~700/900 M evts and pp HM ~160/240 M evts (75%)  data volume on T0: 5.2 PB (out of 10 available for 2016)  running with full compression and reduced IR since June : 7.3 PB (one replica) 2015: 7.2 PB (one replica) 2016 (so far): 5.2 PB (one replica) 10 PB total tape budget HLT compression (x 1/3) + 25% gain (ROOT compression) Reduced IR (<100 kHz, recording rate<300 Hz) 4.4 PB (2016) 7.2 PB (2015)

Domenico Elia5Riunione Referee Calcolo LHC / Bologna, ALICE Computing status 2016 data taking  Projected data volume:  expected integrated data volume at the end of pp period: ~8 PB  additional ~2.5 PB for pPb (10 days and 8 TeV)  total 2016 ~10-11 PB: OK for T0, missing ~2 T1’s  delayed to 2017 additional T1’s recorded projected

Domenico Elia6Riunione Referee Calcolo LHC / Bologna, ALICE Computing status 2017 (2018) running scenario  increased efficiency of the LHC (60%) and ALICE (95%)  updated values of luminosity, IR and running time  2017 pp: max IR ~150 kHz, recording rate (TPC r/o rate) ~550 Hz  computing model parameters (processing power and event size) slightly revised (taking into account 2015 and 2016 data)

Domenico Elia7Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie

Domenico Elia8Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie Dismissioni Anno di dismissione BariCatania LNL- Padova TorinoCagliariTotale HS TB HS TB Rinvio dismissioni storage dalla seconda metà del 2016 al 2017: 130 TB (CT) TB (LNL) + 80 TB (TO) + 20 TB (CA) = 360 TB

Domenico Elia9Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie Dismissioni Anno di dismissione BariCatania LNL- Padova TorinoCagliariTotale HS TB HS TB HS TB Rinvio dismissioni storage dalla seconda metà del 2016 al 2017: 130 TB (CT) TB (LNL) + 80 TB (TO) + 20 TB (CA) = 360 TB Prime dismissioni ReCaS (BA e CT) previste nel 2018 = HS06

Domenico Elia10Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie RRB Aprile 2016  Share INFN per 2017:  CPU, DISK per Tier-1 e Tier-2: 19% (18.5% per 2016)  TAPE per Tier-1: 35% (35.2% per 2016, 41.1% per 2015) RRB October 2015 RRB April 2015

Domenico Elia11Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie Richieste 2017 (RRB Aprile) CPU Tier-1 (HS06) DISK Tier-1 (TB) TAPE Tier-1 (TB) CPU Tier-2 (HS06) DISK Tier-2 (TB) Pledged T1 Disp. – dismiss. T Scrutinati ALICE Delta Stima costo (k€) Totale (k€) Overhead T2 (k€) 53.9 Stima costi*: 10 € / HS06 e 200 € / TB *Per 2016 T2 (T1): 12 (14) €/HS06 e 220 (240) €/TB Dismissioni Tier-1: non incluse (solo DISK per ALICE, ~90 k€) Overhead Tier-2: 6% CPU + 5% DISCO (rete) + 7% totale (server aggiuntivi)

Domenico Elia12Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie RRB Ottobre 2016  Incrementi 2017 (Aprile ‘16)  2017 (Ottobre ’16):  CPU:38.6% (T0) 20.4% (T1) 38.2% (T2)  DISK:16.8% 9.6% -9.3%  TAPE:16.9%20.4%

Domenico Elia13Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie Richieste 2017 (RRB Ottobre) CPU Tier-1 (HS06) DISK Tier-1 (TB) TAPE Tier-1 (TB) CPU Tier-2 (HS06) DISK Tier-2 (TB) Pledged T1 Disp. – dismiss. T Scrutinati ALICE Delta Stima costo (k€) Totale (k€) Overhead T2 (k€) 66.6 Stima costi*: 10 € / HS06 e 200 € / TB *Per 2016 T2 (T1): 12 (14) €/HS06 e 220 (240) €/TB Dismissioni Tier-1: non incluse (solo DISK per ALICE, ~90 k€) Overhead Tier-2: 6% CPU + 5% DISCO (rete) + 7% totale (server aggiuntivi)

Domenico Elia14Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie Margini di risparmio  Prioritario garantire la crescita (pledge), percui:  dismissioni (partendo da quelle 2017, lasciando i rimandi 2016)  overhead (lasciando una quota residua)

Domenico Elia15Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie Margini di risparmio Dismissioni HS06 / TBk€ Bari00,0 0 Catania00, ,8 LNL-Padova00, ,0 Torino384038, ,4 77,8 Cagliari00,0 204,0 Dismissioni totale HS06 / TBk€ , ,2 156,6 Crescita netta HS06 / TBk€ , ,2 283,4 Dismissioni + crescita HS06 / TBk€ , ,4 440,0 T2 (RRB Aprile) Dismisssioni: k€ Crescita netta:283.4 Overhead: 53.9 Totale:493.9 k€ T2 (RRB Ottobre) Dismisssioni: k€ Crescita netta:372.7 Overhead: 66.6 Totale:595.9 k€ Dismissioni 2017: 114 TB (CT) 22.8 k€ 117 TB (TO) HS06 (TO) 38.4

Domenico Elia16Riunione Referee Calcolo LHC / Bologna, Backup

Domenico Elia17Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie Situazione CPU/storage Tier-2  Situazione aggiornata con risorse 2016:  CPU:45333 HS06  in eccesso al pledge: 1488 HS06  DISK: 4876 TB  in eccesso al pledge: 47 TB BariCatania Padova- LNL TorinoCagliariTotale HS TB Disponibili a fine 2016 (fatte dismissioni + completati acquisti 2016*) Pledge 2016: HS TB * Ipotesi di buon esito acquisti residui a BA e TO

Domenico Elia18Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie RRB Aprile % (4%) CPU al Tier-1 (0) +30% (22%) TAPE al Tier-1 (0)  Richiesta suppletiva 2016 per Tier-1:  CPU: 2700 HS06  35 k€ (pledge 2016 rev: HS06)  TAPE:1.6 PB  40 k€ (pledge 2016 rev: 7.1 PB) increased processing time for high pile-up pp events (x2) + TPC calibration issues increased raw data volume for pp events (x3.5) as observed in 2015 sample

Domenico Elia19Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie RRB Aprile 2016  Incrementi 2016  2017 (RRB Aprile ’16):  CPU:18.6% (T0) 40.8% (T1) 16.0% (T2)  DISK:27.4%19.0%19.9%  TAPE:59.2%82.0% RRB October 2015

Domenico Elia20Riunione Referee Calcolo LHC / Bologna, Richieste finanziarie RRB Aprile 2016  Incrementi 2016  2017 (RRB Ottobre ’15):  CPU:13.9% (T0) 31.8% (T1) 12.6% (T2)  DISK:14.3%15.2%17.6%  TAPE:19.0%26.3% RRB October 2015