CSN1 25-06-07M. Diemoz I PROGRESSI DI CMS. CSN1 25-06-07M. Diemoz Outline PROGRESSI DA APRILE AD OGGI SCHEDULA.

Slides:



Advertisements
Presentazioni simili
1 Muon commissioning & prospettive Global Runs - Attivita di commissioning con i cosmici (run locali, indipendenti dal resto di CMS): - check sistematico.
Advertisements

L'allineamento del Tracker di CMS con raggi cosmici Marco Musich per la collaborazione CMS Tracker XCIV CONGRESSO NAZIONALE SIF Genova.
L'allineamento del Tracker di CMS con raggi cosmici Marco Musich per la collaborazione CMS Tracker XCIV CONGRESSO NAZIONALE SIF Genova.
Gianni Masetti Università di Bologna - INFN 21/2/2008 – DT Bologna meeting Stato del Commissioning delle DT Bologna DT crew.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
ATLAS Status Report S. Patricelli 6 aprile Sommario Commissione Scientifica Nazionale I 5-6 aprile 2004 S. Patricelli Highlights and concerns dei.
Guido Tonelli / Gr1-Roma RRB19.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
Polarized target magnet New target magnet SMC (70 mrad)  COMPASS (180 mrad) Field homogeneity of ~ 3 × Saclay Test ripetuto al CERN:
MUG-TEST A. Baldini 29 gennaio 2002
Trieste M. Diemoz - INFN Roma ECAL Settembre 2006.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
RPC Status Outline Barrel installation and commissioning status
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
Stato e Commissioning di CMS Nicola Amapane V Workshop Italiano sulla Fisica p-p ad LHC Perugia, 31 Gennaio 2008.
CSN1 Pisa M. Diemoz LO STATO DI CMS Settembre 2008 Era più bello prima!...
CSN1 - CMS Referee Report P.Giannettii - INFN / Pisa Ferrara, 20 maggio 2007 CMS - Relazione dei Referee A. Cardini, G. Darbo, P. Giannetti, P. Lubrano,
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
Atlas TDAQ status. USA15 SDX1 Gigabit Ethernet Event data requests Delete commands Requested event data Regions Of Interest LVL2 Super- visor Network.
Sommario richieste CSN1 Consiglio di Sezione 28/06/2013 Attilio Andreazza.
Domenico Elia1 Calcolo ALICE: stato e richieste finanziarie (aggiornamenti) Domenico Elia Riunione Referee Calcolo LHC / Bologna, Riunione con.
Michele Iacovacci (Napoli),
Riunione ALICE Italia - Referee stato e richieste finanziarie
Run 3 Statistics EEE Run coordination meeting esteso alle scuole
Compositi per ATLAS Overview del processo per la costruzione supporti per ATLAS Tempistica.
ATLAS – CMS – RD-FAS2 Sblocchi e nuove richieste
LHCB : proposte dei referee
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
LHCB : proposte dei referees
Richieste 2017 HMPID e LHC_IF
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Gagliardi Università degli Studi e INFN Torino
LO STATO DI CMS CMS-Padova M. Diemoz.
Analisi dei dati dell’Esperimento ALICE
Atlas Spares D.Lucchesi , G.Darbo, P.Lubrano, A.Cardini, P.Giannetti
Status del Gruppo di Napoli
STATO CMS: ATTENDE (LHC)
LHCB : proposte dei referees
Gigi Cosentino - LNL 20 ottobre 2016
TC Test a BTF ad inizio settembre : scelta SiPMT a fine ottobre Finalizzazione disegno meccanica entro fine anno Utilizzo parte FI per ascquisto.
Stato di Tilecal al 10/09/2008 (primo fascio)
ONEDATA - distributed data caching -
Stato del rivelatore di Mu Gruppo 1 – Pisa – Settembre 2008
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
Accelerator Disision March 3rd 2015
LHCb: Stato del Rivelatore di Muoni
Status della attività ATLAS TDAQ a Napoli
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
connettorizzaz. e test dei cavoni HV 2 mu
Dr. Pierluigi Paolucci - INFN di Napoli
Dr. Pierluigi Paolucci - INFN di Napoli
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

CSN M. Diemoz I PROGRESSI DI CMS

CSN M. Diemoz Outline PROGRESSI DA APRILE AD OGGI SCHEDULA

CSN M. Diemoz Progressi di CMS UX: Commissioning di 4 settori DT in YB0 con cosmici completato. Installazione di EB- (18 SM ECAL su 36) completata il 22 Maggio. Installazione dei servizi di YB0 procede (ma 4 settimane di ritardo). Commissioning di HF+ completato. Primo “global run” (Lvl-1 Trigger, HF, DAQ, data transf. to T1/T2 fine Maggio). SX: Commissioning delle ruote YB- con cosmici (usando facility MTCC). YB-1 completato Tracker: acquisizione cosmici in atto. Run a T ambiente ok. Run freddo in corso (-10  C). La qualità del rivelatore si conferma eccellente. ECAL: EB- installato, ultimo SM per EB+ pronto inizio luglio. Installazione EB+ anticipata a metà luglio. 20 SuperCristalli montati su ‘Dee4’ cristalli EE consegnati (su 14750). In via di finalizzazione la schedula di consegna per l’ordine finale: ultimo xl EE a fine marzo 08. DAQ e TRIGGER: installazione in progress

CSN M. Diemoz (NUOVA) Schedula LHC Vacuum chambers installed and baked out by end of March 2008

CSN M. Diemoz Installazione del Magnete All magnet systems transferred to the caverns: control, vacuum, cryogenics, powering and protection. Only re-connection work between subsystems is needed. July-October: Commissioning Nov 07: Low current testing (about 400A) in the coil at 4.5K March 08: Final commissioning of the magnet ( ~ 1 week) Progressive current ramps : 3kA, 7kA, 10kA, 14kA, 17.5kA, and nominal, One slow dump at 14kA.

CSN M. Diemoz DT Commissioning

CSN M. Diemoz SX: DT Commissioning YB-1 SX5: YB-1 DTs commissioned using cosmics

CSN M. Diemoz UX: DT Commissioning YB0 Sector 12 Availability of LV supplies DT: prevents simultaneous testing/ commissioning of more than two sectors at once (in different quadrants!) Prime particelle rivelate in UX

CSN M. Diemoz DT Commissioning

CSN M. Diemoz DT Commissioning

CSN M. Diemoz UX: DT Commissioning YB0

CSN M. Diemoz SX: DT Commissioning YB-1 Comunità mu in shift continuo da Aprile

CSN M. Diemoz RPC Commissioning il pre-commissioning del rivelatore è terminato. le torri delle ruote W+1 e W+2 sono complete (cablaggio ed elettronica). le torri della ruota W0 saranno pronte in giugno. il commissioning (dopo il cablaggio) è in corso – test dei cavi e degli alimentatori di LV – test dei cavi/distributori/alimentatori HV la torre W+2 near è pronta per un test combinato RPC-trigger – il software è in fase di test. cablaggio UXC-USC è quasi finito (80%). il commissioning del sistema finale del gas inizierà a giugno. sistema centrale di LV di CMS sarà pronto per luglio 2007  solo allora sarà possibile testare il sistema finale di potenza degli RPC

CSN M. Diemoz RPC: Problemi e novità LV-HV: circa 20 schede su 120 sono state mandate in riparazione. Statistica in fase di sviluppo. Rate uguale a tutti gli altri sottorivelatori (se non è un problema infantile ha impatto sui MOF-B). In maggio è stato scoperto un inversione sistematica dei conduttori (massa, potenza) di tutti i 480 cavi di HV (camera – PP). Errore occulto rilevabile solo con l’apertura del cavo. La ditta ha ammesso l’errore e rifarà parte dei cavi (3 ruote). Nuova schedula in atto: –2 ruote sono già state completate ed una terza sarà pronta per giugno. –Le ultime 2 ruote (W+1 e W+2) saranno aperte ad agosto e pronte per settembre. La nuova schedula comporta un grosso impegno da parte dei nostri tecnici (2 ruote rifatte da noi) e qualche spesa aggiuntiva in costi di installazione dei cavi e nei consumi. CMS sta aiutando in tutti i modi (personale) Little impact on the schedule, but additional manpower and resources needed

CSN M. Diemoz EB- Installazione Completa 22 Maggio Test di funzionalità prima e dopo l’inserimento: difficoltà hanno rallentato le operazioni e richiesto maggiore impegno

CSN M. Diemoz EB intercalibrazione  = 1.5%  0 in test beam 140  0 / crys  50 GeV e Cosmics Intercalibration Cross-checked in beam Tutti I SM sono stati calibrati con I cosmici

CSN M. Diemoz EB Commissioning Services –Cooling unit in operation (was used for EB- installation on few SMs). Needs commissioning with large number of SMs and final stability. –DC- DC and AC-DC Low voltage supplies available. –Large fraction of HV supplies already in USC5. The others are still used in H4/867. Will be moved asap. –Two lasers (1 blue, 1 red) installed and commissioned at point 5 in March. Finalize cooling connections early August. Main cabling will start mid August. Each SM will be powered and tested after cabling, connected to its final VME electronics. From then on, we intend to run Barrel ECAL as continuously as possible and to join CMS global runs and cosmic runs. Will organize operation shifts: opportunity to increase the circle of specialists and train physicists to ECAL operation and DQM.

CSN M. Diemoz ECAL EE Crystals Production: last crystals to be delivered end-Mar08 Assembly Progress 20 supercrystals mounted on Dee4  Bat 186  test beam 29 s.c. assembled for Dee1 ( ~140/Dee), 1400 VPTs glued to crystals Critical path components: HV boards, cooling bars, etc, Start mounting s.c. on Dee1 2nd week of July Schedule is very tight Ist Dee ready only at the end of 2007 (Retrofit of motherborads in SMs has had an effect on progress in EE project.) Issues Adequate manpower (to speed up assembly and for management) Work on the back of the Dee is complicated (LV cabling & looming) Concerns Limited experience so far. Much work still ahead. Will not know the exact time needed to get the last Dee until the first one has been completed and tested.

CSN M. Diemoz ECAL EE Venti SuperCristalli su ‘DEE4’: Check geometria Test Beam 2007

CSN M. Diemoz Schedula ECAL EE Dee1 mid Dec Dee2 end Feb Dee3 end May Dee4 end June La schedula non ha contingenza, sarà necessario uno sforzo di manpower per mantenerla (in qualunque caso)

CSN M. Diemoz Integrazione Tracker TOB TID TIB TEC Pix Inner tracker: ~ 220 m 2 of Si sensors 10.6 million Si strips 65.9 million Pixels Status of CMS Tracker Integration All geographical parts (except pixels) integrated into Tracker Support Tube. 2/3rd of pixels modules assembled. Pixels system rfi end-2007.

CSN M. Diemoz Tracker (pre) commissioning TOB: 14% TIB: 37% TEC: 25% TIF: Slice test TIB/TOB TEC+ a caldo e a freddo, Read-out di 2160 moduli TIB TOB TEC ~ 1.1M Cosmic triggers + LAS Data at Room Temperature ~ 650K Cosmic triggers + LAS Data at 10  C ~ 750K Cosmic triggers + LAS Data at - 1  C ~ 300K Cosmic Triggers + LAS Data at - 10  C Data taking at -10C still ongoing, Plan for ~ 1M Cosmic Triggers

CSN M. Diemoz Tracker alignment No alignment After 2 iterations of alignment procedure After alignment (30 iterations) Iteration 30 Layer 1 Layer 4Layer 3 Layer 2 Aligning strings in the first step –Local x and  (rotation around local normal axis) floated –Starting with an estimated error of 900 µm Nearly all strings converged after 30 iterations  ’s L1: 140 µm L2: 160 µm L3: 220 µm L4: 160 µm

CSN M. Diemoz TK Real Data: Layer efficiency The layer efficiency in the region considered is more than 99.7% for single side layers and more than 99% for double side layers. Further cross check need for double side layers. Region considered ** preliminary ** TIB TOB

CSN M. Diemoz TK: comportamento in T & t Noise of the TK measured at different times proves to be very stable (less than 2% variations vs time). Gain of electronics changes linearly with temperature as expected. Change of the height of the header of the APV measured by the FED with T

CSN M. Diemoz TK: S/N.vs. T & t S/N performance stable in time and temperature (15  C,10  C, 0  C) Fit to Landau convoluted with a gaussian. Plotted the most probable value 15  C10  C0C0C 15C 10  C0C0C

CSN M. Diemoz TK: movimenti con T Observed differences –RMS: 18  m –Max: 50  m No movement observed within measurement precision TK laser system n place to detect movements and deformations of the Tracker Sub-Detector with a precision better than 100  m PRELIMINARY  dati di allineamento RT e 10  C

CSN M. Diemoz TK: prossimi passi La prossima settimana si scendera’ a -20C. Per fare questo si accende solo il 18-19% del SectorTest. Si programma di prendere dati in due configurazioni: 1.Laser run (4%TOB,2%TIB, 50% TEC) 2.Cosmic run (25%TIB/TOB, 5%TEC) Si tornerà quindi a T ambiente Data taking per 2 settimane: Studio del comportamento del sistema dopo un ciclo completo in temperatura. Preparazione del TK per il trasporto in P5 da metà Luglio

CSN M. Diemoz Installazione servizi YB0 + end: Tracker patch panels (PP1s), & pipes installed and insulated, tracker cables being installed, then install ECAL SMs in July, L0 scint, ECAL/HCAL services. - end: Tracker patch panels &ECAL, L0 scint. installed, start tracker pipes installation this week, then tracker cabling, ECAL/HCAL services. L’installazione dei servizi di YB0 continua ad essere il punto critico per l’inserimento del Tracker

CSN M. Diemoz Installazione servizi YB0 Pipes isolate e cavi del tracker Work in progress CONTRIBUTO INFN:14 FTE

CSN M. Diemoz Underground Services Cavern May 06 May 07 USC Work in progress

CSN M. Diemoz Installation of Off-Detector Electronics - USC55 S1 Trigger Systems TTC DT HV Trigger Systems TTC DT HV RPC HV Tracker FEDs TKR FED in 186 Pixels Connectivity tests completed for all sub- detectors. 1st global run end-May

CSN M. Diemoz Installation of Off-Detector Electronics - USC55 S2 HCAL HV ECAL RCT ECAL RCT Totem PreShower HCAL - HTR ECAL HV HCAL - HTR ECAL HV

CSN M. Diemoz Trigger Installation in USC55 Regional Calorimeter Trigger: –18 crates RCT Crates installed in 10 Racks –10 crates have all tested cards installed –6 Global Cal. Trig. Crates also installed –Cables connected to ECAL, HCAL, GCT Most other trigger systems have crates & cards installed –Integration “pattern tests” underway –HCAL HTR’s, ECAL TCC’s  RCT  GCT RCT ECAL TCC HTR

CSN M. Diemoz Stato Data Acquisition D2S (USC) INSTALLED & tested 650 Slink/FMM cables 650 FRL/FMM modules 60 FRL/FMM crates 200 DAQ/DCS PCs D2S (USC-SCX) INSTALLED & Tested Myrinet switches Myrinet Fibers (1024) D2S optical cables MiniDAQ SCX (DAQ Farms) 800 PC 2x2 2GHz Xeon, 4 GB DELIVERED 650 RU/BU PCs (650) Under Installation Event Builder GBE switches (Force10) INSTALLED Mass storage (22 TB, 1GB/s) ORDERED

CSN M. Diemoz CMS Commissioning Two areas : hardware/online and offline Plan to commission hardware at pit: DONE: Off-detector electronics and connection to central trigger and DAQ Full chain (front-end to data logging) tested for HCAL, planned this month for detectors connected to USC: CSC and DT LV1 trigger: all hardware components available at Pt. 5. Check of trigger functionality and connectivity ongoing and so far successful. Schedule of Detector commissioning: start commissioning slices of systems and debug functionality of all ‘components’ (front-end firmware, data-links, trigger-links, online software, databases, DQM etc) Plan of regular monthly global runs: First one end of May. Each “run” period will test increasing functionality and complexity. Also serve as milestones and synchronization points for software and computing milestones.

CSN M. Diemoz CMSSW Validation Reproduce with CMSSW framework (1.2M lines of simulation, reconstruction and analysis software) the detector performance reported in PTDR vol. 1 (ORCA) e momentum at vertex electron/supercluster matching Indispensabile per CSA07 e esercizio di analisi previsto

CSN M. Diemoz Prepare for CSA07 An infrastructure by CMS to help Tiers to exercise transfers –Based on a new traffic load generator –Coordination within the CMS Facilities/Infrastructure project Exercises –T0  T1(tape), T1  T1, T1  T2 (‘regional’), T1  T2 (‘non-regional’) Important achievements –routinely transferring –all Tiers report it’s useful –higher participation of Tiers –less efforts, improved stability –Automatic, streamlined operations T0-T1 only CMS LoadTest Cycles ~2.5 PB in 1.5 months CMS CSA06 CSA07: 50% 2008 system scale CMS LOAD TEST 2007

CSN M. Diemoz CSA07 misura del successo Commission the global computing infrastructure

CSN M. Diemoz CMS Schedule v36 Beam-pipe Closed and Baked-out by End March In v36 this point will be reached in mid-Feb 08. Major Features of v36. By end-September 07: Tracker insertion started In December 07: recording cosmics with Tracker/EB/HB etc. (Expt open) By end-March 08, CMS is closed (including pixels and one ECAL endcap) and taking cosmics with Field-ON The main uses/consequences of the new guidance: - commission the entire detector/data flow and analysis systems with cosmics data - reduce risks (e.g. by separating tracker cabling from beam-pipe installation that was previously in parallel. -Time to carry out untried operations (HF riser system in UX, pixel comm. sys.. -Open +end to allow commissioning to proceed -Repair/replace defective parts (RPC HV cables, DT fibres,… -Accommodate delay in YB0 services Tutto si sistema, basta aspettare…

CSN M. Diemoz CMS Cosmic Runs (CCR) CMS COSMIC RUNS (CCR) meant to be stepping stones on the way to run CMS at LHC. They are meant to test for extended period of runs the consolidation of (major parts of) CMS First run (End October): Plus SIDE run. YB+1,+2 against endcap. Possibly Last chance before february/march 08 to see cosmic tracks correlated between endcaps and barrel muon chambers Second run (End November): focus on YB0 (and open +endcaps) GREM 24/30 may GREJ 25/29 June GREJ’ 23/27 July GREA 20/24 Aug GRES 24/28 Sep CCR 1 29 Oct CCR 2 26 Nov GREJ’’ 28/31 Jan GREF 25/28 Feb CCR 3 31 Mar Third run (End March 08): all CMS with magnet on Una sequenza di commissioning impegnativa che pagherà al momento di fare fisica

CSN M. Diemoz June July Aug Sep Oct Nov Dec Jan Feb Mar Tracker Inserted Pre CSA07 MC Production for Startup HLT Exercise S/w Release 2_0_x (Production of startup MC samples) Trigger/DAQ Ready Commissioning 1) Detector Installation, Commissioning & Operation 2) Preparation of Software, Computing & Physics Analysis Barrel ECAL Inserted CMS Cosmic Run Phase 2 (YB0) Beam-pipe Closed and Baked-out CMS Cosmic Run Phase 3 (-end,RE) Tracker cabled & Commissioned Last Heavy Element Lowered CMS Cosmic Run Phase 4 (4T) CMS Cosmic Run (CCR) Phase 1 (+end) ≥ 2 EE Dees Installed, Pixels installed 2007 Physics Analyses Completed CSA07 Test Magnet at low current S/w Release 1_7 (CCR2, HLT Validation) S/w Release 1_6 (CSA07, CCR1) S/w Release 1_8 (Lessons of ‘07) V36

CSN M. Diemoz CMS Schedule v36

CSN M. Diemoz CONCLUSIONI CMS CONTINUA A FARE PROGRESSI SU TUTTI I FRONTI INSTALLAZIONE E COMMISSIONING PROCEDONO A PIENO RITMO (CRUCIALE L’APPORTO INFN PER I «PROPRI » SOTTORIVELATORI) L’INSTALLAZIONE DEI SERVIZI DI YB0 RESTA SEMPRE UN PUNTO CRITICO (CHIAVE L’APPORTO INFN) CMS STA ADATTANDOSI ALLA NUOVA SCHEDULA DI LHC ELABORANDO LA V.36 DELLA PROPRIA SCHEDULA LA V.36 ACCOMODA I RITARDI E PERMETTE UN COMMISSIONING MOLTO ACCURATO DELL’ESPERIMENTO NEL SUO INSIEME LA NECESSITA’ DI MANPOWER CONTINUA AD ESSERE PRESSANTE PER IL SUCCESSO DELL’IMPRESA