MICE-2020 (INFN MIB, Na, PV, Rm3)

Slides:



Advertisements
Presentazioni simili
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Advertisements

R P Rivelazione Acustica Particelle A bassa temperatura e in Superconduttori Sommario problematica e risultati Nautilus Attivita svolta Programma del prossimo.
29/04/2004M.G.Catanesi1 Neutrino Beams present, past and future.
D. Di Bari II Convegno Sulla Fisica di ALICE – Vietri sul mare Perché estendere lintervallo di p T per PID Stato attuale in ALICE Proposte per rivelatori.
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
Esperimenti di fisica delle alte energie 1 Esperimenti di Fisica delle Alte Energie Periodo didattico : II semestre CFU : 6 Ambito disciplinare : FIS/04.
Esperimenti di fisica delle alte energie 1 Esperimenti di Fisica delle Alte Energie Periodo didattico : II semestre CFU : 6 Ambito disciplinare : FIS/04.
1 Astroparticle Physics in Space Claudia Cecchi Dipartimento di Fisica e Sezione INFN, Perugia Workshop Nazionale La Scienza e la Tecnologia sulla Stazione.
Introduzione: lequazione di stato (EoS) Particelle prodotte in collisioni ad energie relativistiche (1-2 AGeV) Pioni e kaoni come osservabili per lEoS.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
A B C Fascio continuo Energia GeV 200 A, polarizzazione 75-85% 1499 MHz Distribuzione simultanea in 3 sale.
Motor Sizing.
Enzo Anselmo Ferrari By Giovanni Amicucci. Di Enzo Questo è Enzo Anselmo Ferrari. Enzo compleanno è diciotto febbraio Enzo muore è quattordici agosto.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
G. Costa, Roma 16 maggio 2006 Commissione I LAr: status report 1.
Taccani1 7.4 Identification ANALISI DEI PERICOLI Hazard Analysis Identificazione Valutazione Misure di Controllo Control Measures Assessment.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations.
LHCb – RRB aprile 2006 MoF-A (previsioni 2007) MoF-B Stato finanziario dell’esperimento Stato dei finanziamenti INFN e necessita’ CSN1 – 4 aprile.
Metodi di indagine di molecole biologiche 2008 Piccioli-Turano Spettroscopia NMR di molecole Biologiche. Aspetti fondamentali della tecnica (Recupero nozioni.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
Laboratori Nazionali di Legnaro (Italy) A.Pisent Gruppo terzo Roma gennaio 2006 ROADMAP AT LNL.
MUG-TEST A. Baldini 29 gennaio 2002
SUMMARY High efficiency motors RIEPILOGO Motori ad alta efficienza RIEPILOGO Motori ad alta efficienza.
15.11,2005 LNFMarcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa ROADMAP B and SUPER B in Italia Gruppo1 LNF 15Novembre, 2005.
SUMMARY Transmission and distribution of the electric energy RIEPILOGO Trasmissione e distribuzione dell’energia elettrica RIEPILOGO Trasmissione e distribuzione.
Titolo evento Luogo, data Seminario INSPIRE Bologna, luglio 2012 Profili, strumenti ed implementazioni dei metadati Antonio Rotundo Agenzia per l’Italia.
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
Richieste IFR 2011 Roberto Calabrese Università e INFN – Ferrara Marzo 2011.
LASA, 4 Marzo 2008 SPARC-LAB: the Program Luca Serafini, INFN-MI Sara’ costituita da due elementi fondamentali: il fotoiniettore SPARC (+linee di fascio)
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
Presentazione in Sezione INFN Genova 7 luglio 2015 P.Fabbricatore Esiste un accordo di collaborazione tra CERN e INFN per “R&D Activities Relating to High-Luminosity.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
LUNA. The Ne-Na Cycle 22 Ne(p, g ) 23 Na Q=8.8 MeV Only upper limits (μeV) on the strength of the 14 possible resonances below 400 keV (factor 2000 on.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
STMan Advanced Graphics Controller. What is STMan  STMan is an advanced graphic controller for Etere automation  STMan is able to control multiple graphics.
MASSIMO BENETTONI STEFANO LACAPRARA MARIO POSOCCO PAOLO SARTORI ROBERTO STROILI EZIO TORASSA N.N. 17th B2GM 2014/02/06 1 iTOP activities in Padova.
Trento-Padova group in AEgIS Experiment L. Di Noto, S. Mariazzi, G. Nebbia, R.S. Brusa L. Penasa, M.Bettonte.
Bari, Bologna, LNF, Mi-Bicocca, Napoli, Pavia, Roma3 (1), Trieste.
1 CSN I, ROMA 30-31/1/2012 AGPSilvia DALLA TORRE ERC Advanced Grant 2012 : PROPOSAL “Advanced Gaseous Photon detectors for Hadron Physics Investigation”:
Silvia Minardi, Pavia 14 December maps and directions hours.
Quali attivita’ sono possibili per CSN1 sul muon collider?
PANNON GÉP PANNON GÉP KFT Production of agricoltural tools and equipments since Our company is distinguished for the use of high quality material.
Michele Iacovacci (Napoli),
Matrix Assisted Laser Desorption Ionization (MALDI)
UNIFIED MODELING LANGAUGE BASICS
Lepton Flavour MEG A. Baldini CSN1 22 Nov. 2011: GGI.
Compositi per ATLAS Overview del processo per la costruzione supporti per ATLAS Tempistica.
Sezione di Milano: Mauro Citterio, Stefano Latorre, Massimo Lazzaroni
Il ruolo della Sezione di Genova
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
SPES (highlights and economic plan)
Richieste 2017 HMPID e LHC_IF
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
The FOOT Calorimeter No TOF, high density and good energy resolution -> BGO TOF asks for 1.2 m lever arm -> R = 20 cm with 100 angular aperture of the.
Daniele Pedrini INFN Milano-Bicocca
Prof. Stefano Zambon Università di Ferrara e WICI
JetWalk: Agenda e review committee
Ricordate questa slide mostrata a Ferrara (settembre 2009) ?
Gigi Cosentino - LNL 20 ottobre 2016
P-ILC F. Bedeschi INFN-Pisa P-ILC Preventivi 2012 Preventivi 2012
Accelerator Disision March 3rd 2015
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
DoPET DoPET is a stationary 2 heads tomograph gantry compatibility
RD_FA / Pisa Preventivi 2018
Atlas Milano Giugno 2008.
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
A comparison between day and night cosmic muons flux
Group B – Gucci profile part II
Transcript della presentazione:

MICE-2020 (INFN MIB, Na, PV, Rm3) M. Bonesini INFN, Sezione di Milano Bicocca Milano Italy

M. Bonesini - commissione V Ferrara Motivazioni Lo scopo di MICE e’: Progettare, costruire e far funzionare una sezione realistica di un muon cooling channel Misurare le sue prestazioni per diversi settings di emittanza e momento del fascio I risultati servono per ottimizzare la costruzione di una Neutrino Factory o un Muon Collider 30/09/2014 M. Bonesini - commissione V Ferrara

Muon ionization cooling Stochastic cooling is too slow. A novel method for + and - is needed: ionization cooling principle reality (simplified) reduce pt and pl heating Build a section of cooling channel long enough to provide measurable cooling (10% ) and short enough to be affordable and flexible Wish to measure this change to 1% Requires measurement of emittance of beams into and out of cooling channel to 0.1% ! Cannot be done with conventional beam monitoring device Instead perform a single particle experiment: High precision measurement of each track (x,y,z,px,py,pz,t,E) Build up a virtual bunch offline Analyse effect of cooling channel on many different bunches Study cooling channels parameters over a range of initial beam momenta and emittances increase pl 30/09/2014 M. Bonesini - commissione V Ferrara

MICE setup: cooling + diagnostics Cools and measures about 100 muons/s 30/09/2014 M. Bonesini - commissione V Ferrara

MICE cooling channel Minimize heating term: High gradient reacceleration 10% reduction of muon emittance for 200 MeV muons requires ~20MV RF Challenge: integration of these elements in the most compact and economic way Minimize heating term: Absorber with large X0 SC solenoid focusing for small T 3 Liquid Hydrogen absorbers 8 cavities 201MHz RFs, 8MV/m 5T SC solenoids IEEE 2004 - Roma

Muon Emittance measurement G4MICE simulation of Muon traversing MICE Each spectrometer measures 6 parameters per particle x y t x’ = dx/dz = Px/Pz y’ = dy/dz = Py/Pz t’ =dt/dz =E/Pz Determines, for an ensemble (sample) of N particles, the moments: Averages <x> <y> etc… Second moments: variance(x) x2 = < x2 - <x>2 > etc… covariance(x) xy = < x.y - <x><y> > Covariance matrix M = Getting at e.g. x’t’ is essentially impossible with multiparticle bunch measurements Compare in with out Evaluate emittance with: 30/09/2014 M. Bonesini - commissione V Ferrara

Storia partecipazione INFN in MICE Si e’ svolta prima in NTA (come NTA-MICE) e poi in Gr V come MICE ed e’ regolata da un MOU firmato fra INFN e STFC a fine 2012 Finanziamenti esterni: ~ 200KE dal RAL all’ INFN nel 2007, attualmente stiamo cercando finanziamenti EU (proposal ETN MATiN con capofila INFN, rimandato al secondo round di gennaio 2015) Attivita’: principalmente rivolta ai rivelatori che instrumentano il fascio di MICE (sistema TOF+KL) MICE-2020 punta a capitalizzare gli investimenti fatti dall’ INFN negli ultimi anni ed ottenere i risultati relativi di Fisica degli acceleratori (STEP IV-STEP V nel 2015-2017) 30/09/2014 M. Bonesini - commissione V Ferrara

MICE installation status Target Beamline PID detectors SSC + trackers AFC Completo per lo STEP IV 30/09/2014 M. Bonesini - commissione V Ferrara

Compression of MICE Schedule STEP V semplificato 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara MICE Beamline ISIS 800 MeV proton synchrotron at RAL Titanium target, grazing ISIS beam p captured by quad triplet and momentum selected by dipole Followed by 5T decay superconducting solenoid (5 m long): contain p and decay m Second dipole momentum select muons 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara MICE Target Titanium target (UK) dipped into ISIS beam at end of 20 ms beam cycle at ~0.4 Hz This requires fine control of the position of the target as well as high acceleration (~80 g) Original target ran 190K dips into beam, but failed december 2008 (Tip melted) A simplified design is being constructed Understand target operation Beam loss Dip depth and timing How affect ISIS Number of particles in MICE beamline 30/09/2014 M. Bonesini - commissione V Ferrara

PID beam instrumentation 30/09/2014 M. Bonesini - commissione V Ferrara

Beamline Commissioning The beamline has been operated over a range of momenta, producing positrons, pions and protons TOF0 and KL detectors have been used to record beam profiles Time of flight have been used to identify pions and protons Pubblicato su JINST 300 MeV/c pion beam profile in TOF0. Left : 2D beam profile 30/09/2014 M. Bonesini - commissione V Ferrara

Sviluppato un nuovo metodo per misurare l’ emittanza con solo I TOF Pubblicato su Eur. J. Phys. C 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara I trackers di MICE 30/09/2014 M. Bonesini - commissione V Ferrara

Una visione piu’dettagliata dei solenoidi 30/09/2014 M. Bonesini - commissione V Ferrara

LO STEP IV: prima fase di MICE 2020 Tutto l’hardware e’ installato nella MICE Hall Run finale: da Marzo 2015, dopo il cambio del moderatore di ISIS 30/09/2014 M. Bonesini - commissione V Ferrara

Lo STEP V semplificato : fase finale di MICE 2020 Il DOE ha chiesto una compressione della schedula di MICE, con fine entro il 2017. Cio’ ha portato a disegnare una fase V semplificata (dimostrazione del muon cooling con riaccelerazione) . La transizione dallo STEP IV allo STEP V richiede l’aggiunta di due moduli RF (gia’ disponibili a FNAL) ed un altro AFC (gia’ disponibile al RAL) Questa configurazione, rispetto a quella originale con RFCC dello US Study 2, corrisponde di piu’ agli ultimi studi IDS 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara Stato Cavita’ RF 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara RF power train 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara Conclusioni MICE 2020 ha realisticamente la possibilita’ di concludere il programma di studio del muon cooling in un tempo limitato (2015-2017) l’hardware in pratica non necessita di ulteriori completamenti da parte US e permette di capitalizzare sull’investimento (anche umano) INFN degli ultimi anni 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara Backup slides 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara Sensitivity of Nufact X 5 0.10 10 2.50 50 130 M. Mezzetto present limit from the CHOOZ experiment 0.75 MW JHF to super Kamiokande with an off-axis narrow-band beam, Superbeam: 4 MW CERN-SPL to a 400 kt water Cerenkov@ Fréjus (J-PARC phase II similar) Neutrino Factory with 40 kton large magnetic detector. 30/09/2014 M. Bonesini - commissione V Ferrara IEEE 2004 - Roma

International Scoping Study baseline Neutrino Factory International Scoping Study baseline Proton Drive (4 MW, 2 ns bunch) Target, Capture, Drift (π→μ) & Phase Rotation Hg Jet 200 MHz train Cooling 30 pmm ( ^ ) 150 pmm ( L ) Acceleration 103 MeV ® 25 GeV Decay rings (baseline is race-track design): 7500 km L 4000 km L ISS Accelerator WG report: RAL-2007-023 30/09/2014 M. Bonesini - commissione V Ferrara 24 24

 beams: conventional and nufact beams Problem in conventional n beams: a lot of minority components (beam understanding) Following muon collider studies, accelerated muons are ALSO an intense source of “high energy”  Crucial features: high intensity (x 100 conventional beams) known beam composition (50%  50% e) Possibility to have an intense e beam Essential detector capabilities: detect  and determine their sign WANF (conventional n beam at SPS) Nufact beam 30/09/2014 M. Bonesini - commissione V Ferrara

IDS Study – Physics Reach 3s contours shown ISS Physics Group Report: arXiv:0710.4947v2 Sin22q13 Hierarchy d CP SPL: 4MW, 1MT H2OC, 130 km BL T2HK: 4 MW, 1MT H2OC, 295 km BL WBB: 2MW, 1MT H2OC, 1300 km BL NF: 4MW, 100KT MIND, 4000 & 7500 BL BB350: g=350, 1MT H2OC, 730 km BL 30/09/2014 M. Bonesini - commissione V Ferrara 26

M. Bonesini - commissione V Ferrara Neutrino Factory R&D High power (MW) proton driver Target and collection (HARP/MERIT) Maximize + and - production Sustain high power (MW driver) Optimize pion capture Muon cooling (MICE) Reduce +/- phase space to capture as many muons as possible in an accelerator Muon acceleration Has to be fast, because muons are short-lived ! (RLA, FFAG, …) 30/09/2014 M. Bonesini - commissione V Ferrara

STEP V nella configurazione prevista con RFCC 30/09/2014 M. Bonesini - commissione V Ferrara

MICE STEP V semplificato 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara RF phasing with muons 30/09/2014 M. Bonesini - commissione V Ferrara

M. Bonesini - commissione V Ferrara RF phasing with muons 30/09/2014 M. Bonesini - commissione V Ferrara