CALPRO Unconventional CALorimetry PROposal

Slides:



Advertisements
Presentazioni simili
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Advertisements

ASIC per TOF-PET: caratteristiche generali
Tomografia al Seno con Luce di Sincrotrone
RPC muon trigger 3 concentric cylindrical layers of RPC at 5, 7.5 and 10m radius 2 gas gaps and 2+2 readout planes for each detector element 2 mm gas gap.
Opzioni tecnologiche per l’elettronica di front-end del Gigatracker Angelo Rivetti – INFN Sezione di Torino.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
1 Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - Napoli 23 Settembre Angelo Scribano TOTEM – settembre 2005.
18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations.
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
INFN-LNL P. Colautti (50%), V. Conte (80%), A.Ferretti (100%), M. Lombardi (100%), M. Poggi (25%), S. Canella (20%), D.Moro (20%) INFN-PD L. De Nardo (80%),
MUG-TEST A. Baldini 29 gennaio 2002
GuidoTonelli/Università di Pisa ed INFN/Gruppo1/Roma Richiesta di partecipazione alle spese per il procurement attraverso il meccanismo del.
SUMMARY Transmission and distribution of the electric energy RIEPILOGO Trasmissione e distribuzione dell’energia elettrica RIEPILOGO Trasmissione e distribuzione.
Online U. Marconi Milano, 21/9/ ~ 9000 optical link 40 MHz PCIe based readout 30 MHz × 100 kB/evt 5 Gb/s, 300 m long fibres from the FEE directly.
Update su elettronica e local DAQ M. Iacovacci Incontro Referee, 21 settembre 2015.
RPC R&D ATLAS-CMS WG4 D. Piccolo, B. Liberti per il WG4 1.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
TomoSciDos SVILUPPO DI UN CALORIMETRO A FIBRE SCINTILLANTI PER LA DOSIMETRIA DI FASCI TERAPEUTICI DI PROTONI USANDO TECNICHE TOMOGRAFICHE Ernesto Lamanna.
1 OUTLINE CSN I, Roma 19-20/1/2015 RICH&THGEMSilvia DALLA TORRE Impegni per costruzioni – bilancio 2014 Read-out rivelatori ibridi ottobre 2014 – gennaio.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
Laboratorio II, modulo Conversione Analogico/Digitale ( cfr.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Mu2e Waveform Digitizer Review Franco Spinella Luca Morescalchi WD L3 Manager.
Bari, Bologna, LNF, Mi-Bicocca, Napoli, Pavia, Roma3 (1), Trieste.
1 CSN I, ROMA 30-31/1/2012 AGPSilvia DALLA TORRE ERC Advanced Grant 2012 : PROPOSAL “Advanced Gaseous Photon detectors for Hadron Physics Investigation”:
10 Mev e S(e)-S(mu) = % DS(mu)/S(mu) = 5-70 % Streamer.
Sommario richieste CSN1 Consiglio di Sezione 28/06/2013 Attilio Andreazza.
Dopo una prima fase di studi preliminari, ho scelto di operare alle seguenti condizioni: ● HV = -980V ● hold1_delay = 10 ns ● C_feedback = 900 fC (non.
ATLAS RM3 Preventivi 2016 FTE: Fisici 10.5  9.8, Tecnologi: 1.2  1, Tot 11.7  10.8 METABOLISMO: 11.7 Mesi Uomo Estero keuro  10.8 MU
Michele Iacovacci (Napoli),
L. Rossi – Bologna – ATLAS Italia
Lepton Flavour MEG A. Baldini CSN1 22 Nov. 2011: GGI.
Relazione Referee RD_FASE2
Sistema di distribuzione laser
Laboratorio II, modulo Conversione Analogico/Digitale (cfr. e
MPGD_NEXT Miscellanea: MILESTONES 2016 & 2017 SBLOCCO S.J.
Consiglio di Sezione: preventivi 2015, 15 luglio 2014
SYRMA-3D: Phase-contrast Breast-CT VS State-of-art Breast imaging
M.Biasini, P. Checchia 23 Settembre Riunione CSN1
R. Cerulli, M. Pavan e P. Sapienza CSN2 – Catania 18 settembre 2017
Amplificatore per rivelatore al diamante e tests
CALPRO Unconventional CALorimetry PROposal
The FOOT Calorimeter No TOF, high density and good energy resolution -> BGO TOF asks for 1.2 m lever arm -> R = 20 cm with 100 angular aperture of the.
Gagliardi Università degli Studi e INFN Torino
FOOT Pixel tracker daq view.
Analisi dei dati dell’Esperimento ALICE
Status attivita’ Roma1 2010/2011.
Measurements of level densities in hot nuclei
PixFEL PV Personale partecipante e richieste finanziarie
Waveform Digitizer Review
R&D fase 2 – RPC 4st meeting
EXOTIC (7 ricercatori, 5.4 FTE)
Gigi Cosentino - LNL 20 ottobre 2016
SVT Attivita’ 2013 Dopo il TDR entriamo in fase di costruzione.
UA9 Relazione dei Referee
RPC RD_FASE2 assegnazioni
Responsabile locale: F. Ferro
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
DoPET DoPET is a stationary 2 heads tomograph gantry compatibility
Stato pCT e test LNS M. Bruzzi, C. Civinini, G. Maccioni, F. Paulis, N. Randazzo, M. Scaringella, V. Sipala, C. Talamonti.
PROBLEMA: Lo slow shaper, o comunque qualcosa tra preamplificatore e ADC, mostra un guadagno almeno dieci volte inferiore a quello dichiarato per MAROC3.
ATLAS Italia Computing Richieste 2007 (Tier-2 e locali)
Dr. Pierluigi Paolucci - INFN di Napoli
Direction-sensitive optical module for a km3-detector
Dr. Pierluigi Paolucci - INFN di Napoli
Ottimizzazione dei materiali per la rivelazione simultanea di luce Cherenkov e di scintillazione Elena Vannuccini Elena Vannuccini 20/06/2014.
Preliminary results of DESY drift chambers efficiency test
AXIOMA Sviluppo di tecniche spettroscopiche su sistemi freddi per la rivelazione di Assioni Cosmologici Padova, Pisa, Legnaro, Napoli, Ferrara, Palermo,
CdS 2017: embargo fino a TAUP2017
Preventivi 2020 Esperimento Mu2e
Transcript della presentazione:

CALPRO Unconventional CALorimetry PROposal Proposta di nuovo esperimento alla CSN 5, INFN Sez: Napoli, Roma2, Salerno M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 ARGO YBJ: a single layer RPCdetector Detector description BigPad =CHARGE readout PIXEL, 123 x 139 cm2, 3120 (central carpet) Cluster = DAQ unit = 12 RPCs 78 x 74 m2 110 x 100 m2 σt≈1.8 ns, e > 95% RPC BigPad BP Amplitude : mV to many Volts M. Iacovacci, Cds - Luglio 2016 7/24

M. Iacovacci, Cds - Luglio 2016 A shower event … Shower as recorded by ARGO-YBJ through the analog readout system. … what about shower energy? (According to Montecarlo simulations, the shower would correspond to a primary proton of about 2 PeV) M. Iacovacci, Cds - Luglio 2016

… from lateral distribution: The number of particles within 10 m from shower core, P10 ; The slope of the lateral distribution s’ obtained fitting with M. Iacovacci, Cds - Luglio 2016

MC predictions about P10 and s’: The truncated size P10 as a funtion of energy for four simulated primaries, namely proton, Helium, CNO and Iron. Air showers simluatated by CORSIKA[2] . Fluxes generated according to [3] Lateral distribution fitted with polynomial NKG : Local age s’ as a function of energy for the four primaries - Moliere radius,rM = 30 m. M. Iacovacci, Cds - Luglio 2016

MC: a combination of P10 and s’: Y (s’, P10) is a good energy estimator, mass independent  reconstructed energy Erec M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 Energy resolution …. Log10 (E /TeV) M. Iacovacci, Cds - Luglio 2016

… applied to measure the CR all-particle spectrum All-particle spectrum as measured by ARGO-YBJ in two overlapping energy ranges, namely 100-500 TeV (red filled circles) and 300-3000 TeV (blue filled circles), and comparison with the prediction of the Horandel model (dashed blue line). M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 Progetto CALPRO Obiettivo: Validare l’approccio a piu’ basse energie. Generalizzare Calorimetria mono layer a + layer  come scala con Energia e n.Layer  Simulazione Osservabili: densità di carichi intorno all’asse dello sciame; profilo laterale  Ottimizzazione Rivelatori, studio nuovi rivelatori Elettronica capace di ricostruzione online dei parametri s’ e P10 M. Iacovacci, Cds - Luglio 2016

Threshold energy for method: E>100 GeV (?) Spatial scale of investigation cm2, density >1/ cm2 M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 CALPRO Program Realizzazione di un prototipo, struttura meccanica e rivelatore, con layout baseline ma anche flessibile, capace di accogliere assorbitori ma anche rivelatori aggiuntivi, quindi in grado di fare da dimostratore. Esposizione del dimostratore a fasci di varia natura Sviluppo elettronica per alta densità e con capacità di ricostruzione online Simulazioni, Analisi dati e verifica dell’idea beam RPC m-RWELL 50 cm M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 Method relies on particle density measurement : what’s the limit with RPC? Test beam at BTF (LNF, Frascati) streamer mode (avalanche factor 10 higher density) M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 Elettronica di front-end (RPC) HARDROC @ 64 ch: preamplificatore veloce a bassa impedenza (guadagno variabile a 8 bits per canale) slow shaper (50-150ns) con track and hold multiplexato; segnale di carica fino a 15 pC fast shaper seguito da 3 discriminatori per segnale di trigger (da 10 fC fino a 10pC); le soglie sono settate da un DAC a 10 bit I parametri per la gestione del chip (gain, tempi di shaping, soglie dei discriminatori ecc) sono configurati attraverso uno Slow Control. 128 bit di encoder per i 3 segnali di trigger sono registrati a seguito di un wiredOR in una memoria digitale M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 Readout Board (RPC) Scheda di readout gestisce 4 chip HARDROC ADC per ogni HARDROC FPGA per la gestione dei segnali di trigger e per l’acquisizione dei dati digitalizzati Bus di interfaccia verso il livello 2 per il completo event-building Un processore a bordo della scheda di livello 2 consente l’archiviazione locale e/o il trasferimento verso uno storage per un’analisi off-line. L’obiettivo ulteriore è quello di operare un processamento on-line per la ricostruzione dell’evento usando tools software su un LinuxOS. M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 μ-RWELL μ-RWELL_PCB composto da: a) WELL patterned kapton foil : come amplificatore b) Rigid Resistive stage: come soppressore di scarica e collettore delle correnti Sono compatte e di semplice costruzione Solo due componenti meccaniche μ-RWELL_PCB + cathode b) No incollaggio No tensionamenti No cornici rigide M. Iacovacci, Cds - Luglio 2016

FE Slow e DAQ system GIBs (μ-RWELL) FE interface 1024 readout channels 16 copper serial links@100Mbit/s each (double edge technique) for readout - On line input data processing: Data integrity check, data decoding, zero suppression 16 SPI interfaces for FE setting, monitoring and control Trigger/DAQ / slow control interfaces 1 single bidirectional optical link @2Gb/s Trigger interface (unidirectional- GIB input) First level trigger decoding Second level trigger decoding - Data transmission to DAQ DAQ interface (unidirectional – GIB output) First level event building and DATA format, and data transmission Slow control interfaces (bidirectional) Receive, decode and execute control commands Receive , decode and execute FPGA parameters setting Console for local operations: RS232,USB, Eth FE power section Single line for each FE board M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 Sensor #2: Ge-doped fiber within a FBG Fabry-Pèrot The sensor showed a detection limit of 160 mGy within a sensitive volume of only 6 x 10-4 mm3 Future work 2 cm 10 cm FBG Irradiated Ge-doped fiber volume Gamma rays -Charged particles instead of photons (electrons, µ, π) -Energy ~ 50-100 MeV …but….radiation-matter interaction for high-energy particles in silica fibers still needs to be investigated S. Avino, V. D'Avino, A. Giorgini, R. Pacelli, R. Liuzzi, L. Cella, P. De Natale, G. Gagliardi, “Ionizing Radiation Detectors Based on Ge-doped Optical Fibers Inserted in Resonant Cavities”, Sensors 15, 4242-4252 (2015) M. Iacovacci, Cds - Luglio 2016

M. Iacovacci, Cds - Luglio 2016 Groups, People Sede Nominativo Istituzione Ruolo FTE NAPOLI M. Iacovacci Univ “Federico II”, Dip, Fisica, Napoli P.A. 0.4   S. Mastroianni INFN, Sez. Napoli Ric. 0.3 O. Escalante Dott 0.2 E. Voevodina F. Ricci Univ “Federico II”, Dip, Ing. Industr., Napoli 1.0 R. Di Stefano Univ di Cassino, Dip, Ing. Elettr., Cassino F. Marignetti P.A G. Gagliardi INO (CNR), Pozzuoli I Ric. S. Avino FTE Napoli 3.1 ROMA “Tor Vergata” F. Messi Univ “Tor Vergata”, Dip, Fisica, Roma D. Moricciani INFN, sez. RM2 M. De Crescenzi P.O. 0.5 M. Scarselli FTE RM2 1.5 SALERNO A. Di Bartolomeo Dip. di Fisica "E.R. Caianiello" UniSa C. Ripoli Dott. N. Funicello FTE SALERNO Totale FTE 6.1 Previsione Budget: < 50 kE/anno M. Iacovacci, Cds - Luglio 2016

Richieste finanziarie RM2 μ-RWELL costruzione di 1 piano 20x20 4CHF Elettronica FE + acquisizione ~ 5Kc# (6Keuro) 8CHF (si potrá risparmiare? Seconda strada sviluppo ACQ in sede) Costruzione attrezzatura cavi connettori tot.x4 1.5Keuro Missioni e trasporti 10Keuro ? tot. IVA inc. ~ 40Keuro (abbiamo giá sistema di gas e tutta la progettazione dell’elettronica) Na in tot. richiederá circa 20Keuro miss. Incluse Sa solo spese di calcolo e missioni… p.s.: una volta terminata la costruzione del detector saranno solo richieste di calcolo, gas, manutenzione, missioni. M. Iacovacci, Cds - Luglio 2016