Stato dell’esperimento COMPASS 19 maggio 2010

Slides:



Advertisements
Presentazioni simili
Metrica CSA07 1.Reconstruct events at the Tier-0 at greater than 100 Hz for 30 day a) The target is 24 hr/day, threshold 20 hrs/day 5 days a week Target:
Advertisements

L’ esperimento COMPASS
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Motor Sizing.
28 apr 041 Schema riassunto precedente lezione situazione sperimentale delle SSA per rivelare leffetto Collins; polarizzazione trasversa efficace del bersaglio.
Few considerations on the Perspectives for early discoveries BSM non SUSY at LHC Giovanni Franzoni University of Minnesota Lorenzo Menici Univerista’ La.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
1 Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - Napoli 23 Settembre Angelo Scribano TOTEM – settembre 2005.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
COMPASS marzo 2006 COmmon Muon and Proton Apparatus for Structure and Spectroscopy NA58 Czech Republic, Finland, France, Germany, India, Israel, Italy,
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
18 Set 2008 JLab12.0 JLab e CEBAF JLab12 Prima Riunione Plenaria 18 Settembre m 5 Recirculation Arcs 0.6 GeV Linac Extraction element End Stations.
MUG-TEST A. Baldini 29 gennaio 2002
CSN1, 17 settembre 2002 COMPASS prospettive verso la fase 2: tempi ed impegni italiani previsti F. Bradamante attivita’ della collaborazione per la fase.
SUMMARY Transmission and distribution of the electric energy RIEPILOGO Trasmissione e distribuzione dell’energia elettrica RIEPILOGO Trasmissione e distribuzione.
Franco Bradamante CSN1, Ferrara, 17 settembre 2009 run 2009 pubblicazioni in preparazione interazioni con il CERN e stato delle proposte per nuove misure.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
LUNA. The Ne-Na Cycle 22 Ne(p, g ) 23 Na Q=8.8 MeV Only upper limits (μeV) on the strength of the 14 possible resonances below 400 keV (factor 2000 on.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Gstaad Some have heard of it – some haven’t. Gstaad is a little place in Europe located in the french part of Switzerland. With a population of 3,400 it’s.
1 CSN I, ROMA 30-31/1/2012 AGPSilvia DALLA TORRE ERC Advanced Grant 2012 : PROPOSAL “Advanced Gaseous Photon detectors for Hadron Physics Investigation”:
Franco Bradamante CSN1, 29 gennaio F. BradamanteCSN1, 29 gennaio 2008 COmmon Muon and Proton Apparatus for Structure and Spectroscopy NA58 Finland,
Sommario richieste CSN1 Consiglio di Sezione 28/06/2013 Attilio Andreazza.
COMPASS relazione referee CSN1 30/6/2008. milestones 1.RICH−1: disegno della nuova scheda di front−end equipaggiata con C−MAD (prototipo) 1/1/08:100%
Michele Iacovacci (Napoli),
UNIFIED MODELING LANGAUGE BASICS
Compositi per ATLAS Overview del processo per la costruzione supporti per ATLAS Tempistica.
Stato di COMPASS risultati di fisica recenti run 2010
Il ruolo della Sezione di Genova
MPGD_NEXT Miscellanea: MILESTONES 2016 & 2017 SBLOCCO S.J.
Richieste 2017 HMPID e LHC_IF
Richiesta Cuore_dtz Padova anno2014 CdS 2/7/2013
Dichiarazione dei servizi di sito nel GOCDB
Stato delle analisi top
Daniele Pedrini INFN Milano-Bicocca
Analisi dei dati dell’Esperimento ALICE
14/10/2015.
R&D fase 2 – RPC 4st meeting
EXOTIC (7 ricercatori, 5.4 FTE)
relazione referee settembre 2009 p. branchini, s.ragazzi, m.sozzi
Gigi Cosentino - LNL 20 ottobre 2016
COMPASS, presente e futuro
Studi di Materials & Ageing G.Saviano for the Frascati group
Stato di COMPASS Franco Bradamante interazioni con il CERN run 2010
ONEDATA - distributed data caching -
EVEROLIMUS ASSOCIATO A DOSI MOLTO BASSE DI CYA DETERMINA ELEVATO GFR RISPETTO AL TRATTAMENTO STANDARD AIDA LARTI E. Bertoni, G. Rosso, L. Di Maria, M.
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
Environmental Radioactivity Monitoring for Earth Sciences - Uranium
Accelerator Disision March 3rd 2015
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
AusTel by taha.a.
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
DoPET DoPET is a stationary 2 heads tomograph gantry compatibility
PROBLEMA: Lo slow shaper, o comunque qualcosa tra preamplificatore e ADC, mostra un guadagno almeno dieci volte inferiore a quello dichiarato per MAROC3.
Atlas Milano Giugno 2008.
C. Bini, P. Paolucci, A. Tricomi
Riassunto della lezione precedente
Service Level The Service Level is defined as the percentage of orders cycles in which inventory is sufficient to cover demands, or.
Riassunto della lezione precedente
Direction-sensitive optical module for a km3-detector
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Svolgimento della Sezione 5: CONTROLLORI
Preliminary results of DESY drift chambers efficiency test
WP2: Protocollo, Gestione esame, Adeguamento Facility
CdS 2017: embargo fino a TAUP2017
P. Rossi JLAB12 Collaboration Meeting Roma, 9 Giugno 2011
Transcript della presentazione:

Stato dell’esperimento COMPASS 19 maggio 2010 Sezione di Torino Stato dell’esperimento COMPASS 19 maggio 2010 Stato dei progetti INFN DY proposal 2009 DY test New large hodoscope 2009 primakoff data taking CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan Workshop at CERN Sezione di Torino Drell-Yan Workshop at CERN http://indico.cern.ch/conferenceDisplay.py?confId=85721 Tutto il materiale disponibile alla pagina web del workshop Più di 80 partecipanti Teorici e sperimentali Discussione molto interessante del caso fisico CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s From Mauro Anselmino concluding remarks Sezione di Torino Accessing PDF’s From Mauro Anselmino concluding remarks CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s CSN1 Torino - 19-05-10 Daniele Panzieri Sezione di Torino Accessing PDF’s CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s TMD PDF’s, like Sivers, can be accessed both from Sezione di Torino Accessing PDF’s TMD PDF’s, like Sivers, can be accessed both from Semi-Inclusive DIS (SIDIS) and Drell-Yan (DY) process CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s CSN1 Torino - 19-05-10 Daniele Panzieri Sezione di Torino Accessing PDF’s CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s: Boer-Mulder Sezione di Torino Accessing PDF’s: Boer-Mulder TMD PDF’s, like Sivers or Boer-Mulder are sizeable in the valence quark region CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s: Sivers Sezione di Torino Accessing PDF’s: Sivers CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s: Sivers Sezione di Torino Accessing PDF’s: Sivers CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s: Sivers Sezione di Torino Accessing PDF’s: Sivers TMD PDF’s, like Sivers or Boer-Mulder are sizeable in the valence quark region Dimuon mass range 4–9 GeV/c2. The left panel shows the first kT - moment of the u-quark Sivers PDF calculated at Q2 = 25 GeV2 from Anselmino et al. PRD79 (2009) 054010, the right panel the COMPASS acceptance for this region. CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s: QCD prediction Sezione di Torino Accessing PDF’s: QCD prediction CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s: QCD prediction Sezione di Torino Accessing PDF’s: QCD prediction CSN1 Torino - 19-05-10 Daniele Panzieri

Accessing PDF’s: conclusions Sezione di Torino Accessing PDF’s: conclusions From mauro Anselmino concluding remarks CSN1 Torino - 19-05-10 Daniele Panzieri

DY @ COMPASS summary CSN1 Torino - 19-05-10 Daniele Panzieri Sezione di Torino DY @ COMPASS summary CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan beam test in COMPASS Sezione di Torino Drell-Yan beam test in COMPASS In 2007 and 2008, short Drell-Yan beam tests were performed, to check the feasibility of the measurements in COMPASS In 2007, with a p- beam of 160 GeV/c on a NH3 target, and without hadron absorber, ≈ 90000 (< 12 hours of data-taking) ….. CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan beam test in COMPASS Sezione di Torino Drell-Yan beam test in COMPASS In 2008, a test without hadron absorber have been performed. Increasing the p- beam intensity, it was seen a too large detectors occupancy already at 1/10 of the foreseen luminosity (L = 1.2 x 1032 cm-2 s-1) Go for a solution with hadron absorber In 2009, a preliminary version of the absorber have been placed after the target, to study: detectors occupancy the combinatorial background mass and vertex resolution radiation issues J/y production yield with absorber CSN1 Torino - 19-05-10 Daniele Panzieri

2009 beam test configuration Sezione di Torino Drell-Yan 2009 beam test 2009 beam test configuration Beam of 190 GeV/c and Ibeam = 5 x 106 p-/s beam size: 4xs (s ≈ 2 mm) Trigger: same as for 2007 + 2 m in Hcal1 Target: 2 polyethylene cells of 40 cm, 20 cm of space between them Absorber: 2 m long, downstream the target Concrete shielding: around the absorber, 40 cm thick, except on the top (80cm) CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan 2009 beam test Part of W from NA50/60 3 pieces: Sezione di Torino Drell-Yan 2009 beam test Part of W from NA50/60 3 pieces: 200 x 40 (mm) 200 x 78 (mm) 200 x 92 (mm) CSN1 Torino - 19-05-10 Daniele Panzieri

Sezione di Torino Drell-Yan 2009 beam test I due elementi dell’assorbitore in posizione con il bersaglio di polietilene CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan 2009 beam test occupancy Sezione di Torino Drell-Yan 2009 beam test occupancy Occupancies are ~ factor 10 lower with respect to standard muon or hadron spectroscopy data taking Micromegas Drift chamber CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan @ COMPASS DY 2009 beam test: radiation aspects Sezione di Torino Drell-Yan @ COMPASS DY 2009 beam test: radiation aspects Allowed ambient dose equivalent rate in accessible areas at COMPASS: < 3 mSv/h at permanent workplaces like the control room, and < 15 mSv/h in low occupancy areas 2009 Test beam conditions for DY: 190 GeV negative pions (p-) 5×107 p- per spill (SPS supercycle time 39.6s) 5 days beam time Total 5.45×1011 p- Calculations were performed with the Monte-Carlo particle transport code FLUKA Calculated: prompt dose rate during beam time Residual dose rate around the absorber 300 s, 1 h, 8 h, 1 day, 1 month after beam stop CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan @ COMPASS DY 2009 beam test: radiation aspects Sezione di Torino Drell-Yan @ COMPASS DY 2009 beam test: radiation aspects Prompt dose rate at COMPASS - 5×107 p- per spill (spill time 9.6s and SPS supercycle time 39.6 s) Beam height ~ 2 m above beam height black line 50 mSv/h pink line 15 mSv/h Magenta line 3 mSv/h CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan 2009 beam test radioprotection Sezione di Torino Drell-Yan 2009 beam test radioprotection Beam intensity: 7-8 E7 pions per spill (1.5E8 during a short period on 22/11/2009) Also at 1.5x108 /spill dose rate below 0.5 uSv/h (allowed 3 uSv/h) situation well under control CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan 2009 beam test radioprotection Sezione di Torino Drell-Yan 2009 beam test radioprotection Dose equivalent rate measured with a mobile station close to gate PPX221.1 (placed inside the hall) Beam intensity: 7-8 E7 pions per spill (1.5E8 during a short period on 22/11/2009) ‘red’ counter …IG5(H2O).. sensitive to neutrons ‘Blue’ counter… IG5 (Ar) ..not sensitive to neutrons CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan 2009 beam test CSN1 Torino - 19-05-10 Daniele Panzieri Sezione di Torino Drell-Yan 2009 beam test CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan 2009 beam test qT and xF ranges CSN1 Torino - 19-05-10 Sezione di Torino Drell-Yan 2009 beam test qT and xF ranges CSN1 Torino - 19-05-10 Daniele Panzieri

Sezione di Torino H2 CSN1 Torino - 19-05-10 Daniele Panzieri

Drell-Yan @ COMPASS Accettanze DY (p- 190 GeV) Sezione di Torino Drell-Yan @ COMPASS Accettanze DY (p- 190 GeV) attuale configurazione: bersaglio upstream di 260 cm, assorbitore 140 cm Al2O3 + 60 cm Fe Eventi DY in accettanza Nella regione di valenza ~ 57% degli eventi DY in accettanza ha entrambi i muoni nel LAS ~ 42% degli eventi DY in accettanza ha un muone nel LAS e uno nel SAS occorre un trigger di muoni nel LAS CSN1 Torino - 19-05-10 Daniele Panzieri

Il nuovo sistema di trigger Sezione di Torino Il nuovo sistema di trigger CSN1 Torino - 19-05-10 Daniele Panzieri

Il nuovo sistema di trigger Sezione di Torino Il nuovo sistema di trigger H1H davanti al RICH1, a z = 6 m 2.2 x 1.8 m2 (32 scintillatori, 64 ch. R/O) = 64 ch  H2H dietro al primo muon filter, a z = 17 m 5.0 x 4.2 m2 (32 scintillatori, 64 ch. R/O) x 2 =128 ch Totale: 96 scintillatori 192 PM 192 ch R/O         CSN1 Torino - 19-05-10 Daniele Panzieri

Il nuovo sistema di trigger The Hodoscopes System: H2 Sezione di Torino Il nuovo sistema di trigger The Hodoscopes System: H2 32 slabs h = 135 mm thikness = 20 mm Total dimension (mm) 6200 x 4500 x 216 (!) Weight ~ 2 tons 5000 mm 4200 mm 1500 mm 785 mm CSN1 Torino - 19-05-10 Daniele Panzieri

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 32

The Hodoscope System: H2 the frame Sezione di Torino The Hodoscope System: H2 the frame Al L bar 120 x 150 x 2 Al profile 20 x 100 x 2 Not standard! Each frame (6) is welded and stabilized in a oven before machining Stainless steel CSN1 Torino - 19-05-10 Daniele Panzieri 33

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 34

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation From the simulation program: maximum deformation is ~ 0.35 mm CSN1 Torino - 19-05-10 Daniele Panzieri 35

The Hodoscope System: H2 the suspension system Sezione di Torino The Hodoscope System: H2 the suspension system CSN1 Torino - 19-05-10 Daniele Panzieri 36

The Hodoscope System: H2 the suspension system Sezione di Torino The Hodoscope System: H2 the suspension system CSN1 Torino - 19-05-10 Daniele Panzieri 37

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation Simulated model CSN1 Torino - 19-05-10 Daniele Panzieri 38

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation Total relative deformation CSN1 Torino - 19-05-10 Daniele Panzieri 39

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation Total displacement (x 162) CSN1 Torino - 19-05-10 Daniele Panzieri 40

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation Out of plane displacement (x 162) CSN1 Torino - 19-05-10 Daniele Panzieri 41

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation Vertical displacement (x 162) CSN1 Torino - 19-05-10 Daniele Panzieri 42

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation Horizontal displacement (x 162) CSN1 Torino - 19-05-10 Daniele Panzieri 43

The Hodoscope System: H2 structure simulation Sezione di Torino The Hodoscope System: H2 structure simulation Scintillator slab displacement (x 162) (without central support) CSN1 Torino - 19-05-10 Daniele Panzieri 44

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 central support CSN1 Torino - 19-05-10 Daniele Panzieri 45

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 46

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 47

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 48

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 49

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 50

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 Beam direction Saleve Jura SM2 mWALL1 Assembly area Restricted area CSN1 Torino - 19-05-10 Daniele Panzieri 51

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 52

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 CSN1 Torino - 19-05-10 Daniele Panzieri 53

The Hodoscope System: H2 Sezione di Torino The Hodoscope System: H2 La struttura è risultata più complessa del previsto (a giugno 2009!) a causa dello spazio estremamente ridotto disponibile e alle dimensioni del telaio: - Le caratteristiche della struttura (come descritto precedentemente) non hanno permesso di realizzare in sede i telai - Abbiamo dovuto modificare la struttura di sospensione a causa del ridotto spessore dei telai e data la sua dimensione (6 m) è stato necessario costruirla al CERN CSN1 Torino - 19-05-10 Daniele Panzieri

Measurement of pion polarizabilities at COMPASS via Primakoff reaction Sezione di Torino Measurement of pion polarizabilities at COMPASS via Primakoff reaction CSN1 Torino - 19-05-10 Daniele Panzieri

Measurement of pion polarizabilities at COMPASS via Primakoff reaction Sezione di Torino Measurement of pion polarizabilities at COMPASS via Primakoff reaction CSN1 Torino - 19-05-10 Daniele Panzieri

Sezione di Torino Measurement of pion polarizabilities at COMPASS via Primakoff reaction: 2009 CSN1 Torino - 19-05-10 Daniele Panzieri

Sezione di Torino Measurement of pion polarizabilities at COMPASS via Primakoff reaction: 2009 2009 2004 Small sample of 2009 statistics CSN1 Torino - 19-05-10 Daniele Panzieri

Resolution expected with the 2009 run for ap Sezione di Torino Measurement of pion polarizabilities at COMPASS via Primakoff reaction: 2009 Resolution expected with the 2009 run for ap Moreover: First observation of Prikmakoff scattering with kaons First measurement of ap (w) and ap (M) CSN1 Torino - 19-05-10 Daniele Panzieri

Sezione di Torino spares CSN1 Torino - 19-05-10 Daniele Panzieri

Sezione di Torino Costi   ditta ordine n. costo in CHF costo (con IVA) staffe per PM nuova olpa 1017/OR 3806,40 telai (6) camib 10121/OR 11952,00 collari per PM 1034/OR 2880,00 acciao adriano prod. Sider. 1041/OR 1655,28 viteria col-fer 1084/OR 400,20 sistema di sospensione per H2 cern 1089/OR 13800,00 9936,00 acciao cern MAG 4324705 1014,98 730,79 ensemble support JOB 4348155 546,00 393,12 JOB 4349502 costruzione spalle acciao @ cern JOB 4348492 4100,00 2952,00 decoupe material TID 4352799 780,00 561,60 totale 35660,51 Dalla tabella dei costi sono escluse le somme per minuteria di “routine” che ammontano a circa 1 keuro. CSN1 Torino - 19-05-10 Daniele Panzieri

Abbiamo appena iniziato il run (7 maggio)!! Sezione di Torino Costi Dal sito web infn https://preprod-as-lh.lnf.infn.it:9999/experiments/view/ Capitolo Descrizione Stanziato Variato Subjudice e Cong. Impegni Disponib. Proposta in corso Disp. Teorica U212_520110 IMPIANTI ATTREZZATURE MACCHINARI 7.000,00 2.241,05 4.758,95 U102_121410 TRATTAMENTO MISSIONI NAZIONALI 14.000,00 12.281,37 1.718,63 U102_121420 TRATTAMENTO MISSIONI ESTERE 130.000,00 40.000,00 65.292,70 24.707,30 Abbiamo appena iniziato il run (7 maggio)!! CSN1 Torino - 19-05-10 Daniele Panzieri