GRI 21-09-05M. Diemoz - INFN Roma ECAL Settembre 2005.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

CMS ECAL STATUS REPORT SCHEDULA PRODUZIONE CRISTALLI COSTRUZIONE MODULI NEI CR COSTRUZIONE SUPER MODULI ELETTRONICA E INTEGRAZIONE STATO IMPEGNI INFN.
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
Queuing or Waiting Line Models
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Stato dei sistemi di High Voltage Low Voltage Detector Control system.
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
1 referee-ATLAS CSN I, Roma 2-3/4/2007 RELAZIONE DEI REFEREE DI ATLAS F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 3 aprile 2007.
Stato del progetto RPC Riunione Commissione I Roma 4/4/2006 R. Santonico.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Opzioni tecnologiche per l’elettronica di front-end del Gigatracker Angelo Rivetti – INFN Sezione di Torino.
PINK FLOYD DOGS You gotta be crazy, you gotta have a real need. You gotta sleep on your toes. And when you're on the street. You gotta be able to pick.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
G. Costa, Roma 16 maggio 2006 Commissione I LAr: status report 1.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
R.N. - Referees LHCB-CSN1 09/021 LHCB : proposte dei referees Giulio D’Agostini Chiara Meroni Rosario Nania.
M. Diemoz – INFN Roma Catania 19 Settembre Gr I CMS ECAL STAUS REPORT Produzione Cristalli Produzione Moduli Produzione Supermoduli Stato Elettronica.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
GRI M. Diemoz - INFN Roma ECAL Maggio 2005.
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
Referees LHCB-CSN1 05/041 LHCB : proposte dei referees Giovanni Batignani Chiara Meroni Rosario Nania.
B.Borgia 26/3/20081 Stato elettronica UG controllo TRD 26 Marzo 2008 A.Bartoloni, B.Borgia, F.Spada.
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
Nicolo` Cartiglia Stato dell'elettronica di ECAL - La situazione e' in continua evoluzione. Entro l'estate si formalizzera` la decisione su quale elettronica.
Stato degli RPC di ATLAS Riunione CSN1 Catania 19/9/02 R. Santonico.
ATLAS MDT Italia Status report Stato della produzione Test beam Costi Conclusioni M. Livan Gruppo I Roma
ECAL (1) Torino intende assumersi la nuova responsabilita’ della costruzione completa delle Mother Boards per il VFE (gia` dati 30 kEuro nel 2003 per 100.
Roma S. Ragazzi Milano-Bicocca ECAL Aprile 2007.
SUMMARY Time domain and frequency domain RIEPILOGO Dominio del tempo e della frequenza RIEPILOGO Dominio del tempo e della frequenza.
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
ATLAS MDT Status report M. Livan CSN1 Roma Stato spettrometro Stato equipaggiamento camere Commissioning e installazione al CERN Stato HV e.
M. Paganoni, 24/6/03, CMS ECAL satus report (sistema di raffreddamento) Prototipo del sistema di raffreddamento (modulo M0’) Principio di funzionamento.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
M. DIEMOZ - GRI LECCE 25/09/03 CMS ECAL STATUS REPORT PRODUZIONE CRISTALLI COSTRUZIONE MODULI E SM NEI CR ELETTRONICA SISTEMA DI RAFFREDDAMENTO PROGRESSI.
MUG-TEST A. Baldini 29 gennaio 2002
Trieste M. Diemoz - INFN Roma ECAL Settembre 2006.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
CSN1, 17 settembre 2002 COMPASS prospettive verso la fase 2: tempi ed impegni italiani previsti F. Bradamante attivita’ della collaborazione per la fase.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
Relazione Referees CMS C. Bozzi G. Darbo M. Dell’Orso M. Morandin CSN1 - Napoli 21 settembre 2005.
R.N. - Referees LHCB - CSN1 06/021 LHCB : proposte dei referees Giulio D’Agostini Chiara Meroni Rosario Nania.
Frascati 14 Maggio Gr I M. Diemoz – INFN Roma CMS ECAL STATUS REPORT Produzione cristalli Produzione moduli Stato Elettronica Produzione SuperModuli.
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
MS - NA62 TDAQ INFN – Settembre 2011 TDAQ in generale Distribuzione clock/trigger: progetto definito, moduli finali in arrivo (?), installazione prevista.
Proposta Upgrade activities for Rome in 2014 Francesca 1.
CSN1 - Lecce - 22/9/03CMS referees1 Relazione Referees CMS R. Calabrese P. Campana M. Dell’Orso M. Morandin.
L. Carminati - P. GovoniIII Workshop sull fisica di ATLAS-CMS1 sessione di discussione uno spunto: la calibrazione in situ dei rivelatori CALORIMETRI ELETROMAGNETICI:
1 CSN1 - Lecce 26/09/2003 TOTEM Relazione e proposte finanziarie Referee: G: Chiefari, M. Curatolo, M. de Palma.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
Status of the INFN Camera F. Giordano INFN - Bari For the CTA-INFN Team Bari - CTA F2F MeeingSITAEL 11 Marzo 2015.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
1 OUTLINE CSN I, Roma 19-20/1/2015 RICH&THGEMSilvia DALLA TORRE Impegni per costruzioni – bilancio 2014 Read-out rivelatori ibridi ottobre 2014 – gennaio.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
TOF Upgrade e programmazione 2018
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Gigi Cosentino - LNL 20 ottobre 2016
PROBLEMA: Lo slow shaper, o comunque qualcosa tra preamplificatore e ADC, mostra un guadagno almeno dieci volte inferiore a quello dichiarato per MAROC3.
Atlas Milano Giugno 2008.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

GRI M. Diemoz - INFN Roma ECAL Settembre 2005

GRI M. Diemoz - INFN Roma Cristalli BTCP Produzione regolare, media di nelle ultime 26 settimane 1148xl/mese

GRI M. Diemoz - INFN Roma Cristalli : BTCP Problema di qualita' messo in evidenza a giugno (rad hardness). Rigettato un intero Batch, giro di vite sul QC (irraggiamenti). Conclusi contratti precedenti, inclusi 500 xl rimpiazzo. Nuovo contratto 18K Barrel EE (+ contributo in-kind EE) firmato con Russian Electronika a fine Giugno. Partenza a Settembre per 1100xl/mese + incentivo quantita' eccedente (ad oggi la frequenza media di consegna e' stata di 1150xl/mese) Opzione per una ulteriore produzione prevista nel contratto Recente visita alla fabbrica positiva, qualita' cristalli tornata quasi ok (da tenere comunque sempre sotto controllo).

GRI M. Diemoz - INFN Roma PROBLEMA BTCP Apr-May 2005 June-Aug 2005 Criterio della slope tranmissione non piu' efficace per rigettare i xl non rad-hard S>3%

GRI M. Diemoz - INFN Roma BCTP crystals Quality 360nm Time LY But In June, we had observed a slight deterioration of rad-hardness (despite increased LY and transmission !) Quality is back to normal

GRI M. Diemoz - INFN Roma Cristalli: SIC Ricevuti pre-serie 350 EE Ricevuta pre-serie of 100 EB Raggiunto accordo per l'irraggiamento da parte di SIC di tutti i cristalli con rilascio di certificato. Protocollo tecnico definito dopo un'intensa attivita' incrociata di irraggiamento e dosimetria. Formalmente firmato contratto 2700 EB EE Produzione in aumento (verso 150 xl/mese) Problema permanente –Pt import/export (si importa ma non è chiaro se si esporta...) –Se non si risolve SIC produrra' 1300 EB

GRI M. Diemoz - INFN Roma SIC crystals quality (July batch) Length Dispersion of Transv. transmission LY FNUF

GRI M. Diemoz - INFN Roma Radiation hardness SIC Comparison  Rome & SIC after 720 Gy at  30 Gy/h A clear correlation is observed, 14% difference still there. Dosimetry SIC performed by ETHZ are on the way. Total dose=720 Gy/h China Dose Rate= 30 Gy/h Rome Dose Rate = 34 Gy/h

GRI M. Diemoz - INFN Roma SIC crystals quality In addition to the “usual” mechanical and optical measurements, every crystal from SIC is irradiated by the producer. –Dosimetry to control SIC irradiation conditions –Correlation between SIC (24 h, 30 Gy/h) and standard CERN (1h20, 350 Gy/h) irradiation conditions established at Rome/ENEA –Sample irradiations performed at CERN and Rome/ENEA

GRI M. Diemoz - INFN Roma Stato costruzione Moduli & S-Moduli-1 SM0SM0 SM1SM1 SM2SM2 S M3 SM4SM4 SM5SM5 SM6SM6 SM7SM7 SM8SM8 SM9SM9 S M 10 S M 11 S M 12 S M 13 S M 14 S M 15 S M 16 S M 17 M1 CERN M2 Rome M3 Rome M4 CERN Bare SM Complete SM Module Completed in RC Module In progress Module Completed & shipped to CERN/lab27 Bare* Super-Module Completed Super-Module In progress

GRI M. Diemoz - INFN Roma Stato costruzione Moduli & S-Moduli-2 S M 18 S M 19 S M 20 S M 21 S M 22 S M 23 S M 24 S M 25 S M 26 S M 27 S M 28 S M 29 S M 30 S M 31 S M 32 S M 33 S M 34 S M 35 S M 36 M1 CERN M2 Rome M3 Rome M4 CERN Bare SM Complet ed SM Module Completed in RC Module In progress Module Completed & shipped to CERN/lab27 Bare* Super-Module Completed Super-Module In progress

GRI M. Diemoz - INFN Roma Cooling integration problems (1) Early May, we noticed root porosity (= oxidation) on some of the welds on the internal cooling manifolds (5 SM già prodotti) This was traced down to insufficient neutral gas inertion inside the tubes during welding. –Could be easily fixed by the producers However, this triggered further investigations of the welds quality (by Xrays and endoscopy). –Lack of full penetration observed on some of the manifold welds –Full penetration of the weld: this is required by CERN for high pressure/velocity circuitry, –Welding faults ( cracks and craters) : such fault cannot be tolerated as they can evolve in time and lead to leaks. Cooling integration (and therefore electronics integration) is stalled. Already assembled SMs (4) will have to be retro-fitted.

GRI M. Diemoz - INFN Roma Saldature a penetrazione totale Penetrazione totale ok Penetrazione totale non ok

GRI M. Diemoz - INFN Roma Saldature cooling blocks Manifolds of cooling blocks

GRI M. Diemoz - INFN Roma Cooling integration problems (2) Considerable effort during the Summer to fix the problem at the factory –Frequent visits of CERN welders –New TIG welding equipment bought / optimization of pipe thickness –Not succeeded to get 100% reliability on welds Mid August, it was decided to in-source the welding work at CERN, under responsibility of TS division –modification of collector shape allowing Electron Beam welding of the small pipes from inside. –Design modification quickly done (early September) –Small scale tests successful –Complete manifold being welded before end of september Mini-review to be held by A.H. on September 29th Schedule: –1 set of 4 cooling blocks by Mid October; then 4 sets per month –Electronics integration being upgraded to sustain the same rhythm.

GRI M. Diemoz - INFN Roma Cooling Una stima precisa del costo ci sarà una volta dimostrata la validità della soluzione tecnica prevista Alcuni costi (nuovo tubo collettore) sono già chiari e dovranno essere affrontati a breve Il costo principale è relativo al manpower (CERN) necessario a gestire il processo di saldatura ad electron beam Il management di ECAL è in completo accordo sul reperire questi fondi con la collaborazione di più istituti (CERN, INFN, UK)

GRI M. Diemoz - INFN Roma H4 cosmic test Extremely useful bench for DAQ and DCS debugging

GRI M. Diemoz - INFN Roma Cosmics intercalibration Useful statistics in 1week data taking Good uniformity along  module boundary, reduced veto power VERY Preliminary

GRI M. Diemoz - INFN Roma Cosmici.vs.Lab LY misurato nei Centri Regionali (Roma M2,M3 e CERN M1,M4) nel 2002 SM5 non è stato su fascio, unico confronto possibile con LAB

GRI M. Diemoz - INFN Roma Cosmici.vs.Lab Confronto intercalibrazioni cosmici-lab in funzione di eta

GRI M. Diemoz - INFN Roma Cosmici 2004 Cosmics calibration from Milano group for 143 crystals in Mod.1 3.3%  2.7%

GRI M. Diemoz - INFN Roma Monitoring on-line TRIESTE SI E’ BEN INTEGRATA IN ECAL

GRI M. Diemoz - INFN Roma Integrazione Il problema del cooling ha bloccato l’integrazione dei Super Moduli (prevista iniziare a luglio) Cambio di strategia: l’assemblaggio di molte componenti del SM previsto in parallelo al montaggio stesso. Si stanno creando dei buffer di parti di questo tipo in modo da rapidizzare l’integrazione finale. Si sta approntando una quarta linea per recuperare l’inevitabile ritardo. Se la produzione del sistema di raffreddamento partirà a novembre come possibile e verrà mantenuto il ritmo di 4SM/mese riusciremo a tenere la schedula

GRI M. Diemoz - INFN Roma Integration Area at B867 We have a space for integration where we can work on 3 integration line in parallel. The integration is under the responsability of W.Lustermann of ETH Zurich. The coordinators of the 3 integration lines are: D.Bailleux (Minnesota Univ.), C.Biino (INFN Torino), L.Djambazov (ETH Zurich)

GRI M. Diemoz - INFN Roma Principal Integration Items ItemAbbr.N / SMN / EB Mother Boards *MB Very Front End electronicsVFE Low Voltage RegulatorsLVR Front End electronicsFE Token Ring BoardsTRB4148 Gigabit Optical HybridsGOH Distributed Fiber Patch PanelDFPP12444 Precision Temperature Monitoring PTM10370 Temperature Safety SystemTSS8296 Humidity MonitoringHM4148 Water Leak DetectorWLD137 Low Voltage DistributionLVD17612 Mechanical SupportsMS137 Super Module Patch PanelSMPP137 * MB installed at B27 but test repeated at arrival at B867

GRI M. Diemoz - INFN Roma VFE/LVR Front Cover Mounting of the front covers (for VFE/LVR) done at CERN: deposition of gap pad paste on each component, 12 screws to fix the cover and 5 gap pads glued on the cover. Up to now we have prepared about 4000 VFE, and 4800 VFE are waiting for the front cover delivery. AD ESEMPIO...

GRI M. Diemoz - INFN Roma Low Voltage Distribution (LVD) Assembly of the cables and connectors

GRI M. Diemoz - INFN Roma Low Voltage Distribution (LVD) Each one of the 17 LVD in a SM has cables of different length since the cables are very stiff and there is not space to store the eventual extra cable length. At the moment we are adding a protection resistence and we have nearly finished the assembly of all 612 pieces.

GRI M. Diemoz - INFN Roma Installation of Sensors Installation of the first layer of temperature and humidity sensors in a bare SM.

GRI M. Diemoz - INFN Roma Assembly and Testing During the installation of the first 3 SM there has been a lot of learning on defining and optimizing the installation procedure and testing. Two completely installed SM are available at the moment as test benches for DAQ (et al.) studies : SM11 in B867, SM5 in H4

GRI M. Diemoz - INFN Roma Electronics system Very Front End (VFE) CARD (5 Channels) Very Front End (VFE) CARD (5 Channels) Very Front End (VFE) CARD (5 Channels) Very Front End (VFE) CARD (5 Channels) Very Front End CARD (VFE) 5 Channels Crystal Motherboard Crystal Trigger Primitives (Continuous) Data (on Level 1) Front End Card (FE) 25 Channels (7 FENIXs Control ) Crystal APD Or VPT Amplifier *1 Amplifier *6 Amplifier *12 ADC Channel 2 (12bit) ADC Channel 1 (12 bit) ADC Channel 0 (12 bit) 14 bit Channel Data: Buffer Complete production of Front-End electronics for EB in 2005 Production of Electronics for EE starts end 2005 (same VFE of EB except few capacitors, new FE layout complete)

GRI M. Diemoz - INFN Roma TEST BEAM 2006 FASCIO DA Giugno a Novembre H4 (calibrazione): 4w iniziali + 2w beam/2w cosmici alternate fino a fine periodo H2 (ECAL+HCAL): 2 x 4w

GRI M. Diemoz - INFN Roma Test-beam performance Electronics noise measured on 1000 crystals Design performance achieved with final electronics Single crystal noise Mean=39 MeV Noise on a 3x3 crystal matrix Mean=120 MeV

GRI M. Diemoz - INFN Roma Noisy towers (HV problems) TT5TT6TT9TT10  Noise in 3x3 for a 1000 xtals mean= 119MeV  Noise in 5x5 for a 1000 xtals mean= 202MeV  No strong spatial correlations Test-beam performances

GRI M. Diemoz - INFN Roma Test-beam performances Mean values Mean values: Stochastic=3.36, Constant = 0.45, Noise=162 MeV Resolution versus beam energy for a 3x3 crystals for 9 different crystals (uniform beam impact with impact point corrections from ECAL info alone) Mean values Mean values: Stochastic=3.18, Constant = 0.41, Noise=160 MeV IT WORKS!

GRI M. Diemoz - INFN Roma BURN-IN : 3 Max 40 MB insieme a HV=500 V monitorando la corrente e usando una switching matrix per escludere MB con I > 10  A TEST di VALIDAZIONE: Test di tutte le connessioni sulla MB Test motherboard Torino

GRI M. Diemoz - INFN Roma MOTHERBOARD STATUS PRODUZIONE ad oggi ~ 620 MB prodotte entro gara assemblaggio: 136 in SM5 e SM11 gia’ integrati 220 al CERN pronte per l’installazione (3 SM + spares) 100 a Torino pronte 120 sotto test e verifica 44 da riparare Problemi: –10% kapton da sostituire – corto  I >10  A – < 1% errato assemblaggio connettore/kapton – ~ 30% banali imperfezioni di saldatura (di facile correzione) Luglio – Agosto 2005: raggiunto rate di produzione kapton 3SM/mese assemblaggio schede /mese rate di test sotto controllo, grazie anche a un nuovo setup di validazione – verificato con misure ripetute a luglio (in fase di duplicazione)

GRI M. Diemoz - INFN Roma Assemblaggio Build 27 Prima di installazione cooling Dopo installazione cooling Goal produzione: 3 SM/mese Installazione e test (B27): 1 SM/settimana (3-4 gg) (possibile parallelizzare operazioni su + SM)

GRI M. Diemoz - INFN Roma VFE: TO test setup 7 schede di test (meccanica finale inserimento VFE) VFE sistema funzionante e debuggato nei 3 siti: Lione – CERN (ETH) e Torino

GRI M. Diemoz - INFN Roma Test e calibrazione VFE - calibrazione delle VFE (3600 calibrate su 8800 prodotte) - analisi del funzionamento delle VFE in supportoall'analisi Attivita’ a Torino: - set-up del database locale e delle interfacce con database esperimento - sistema di calibrazione cariche iniettate nel sistema di test - analisi dei risultati delle VFE -analisi VFE usate nel TestBeam 2004 Charge [pC] ADCADC Range di cariche iniettate per i diversi guadagni 1/6/12

GRI M. Diemoz - INFN Roma Stato impegni INFN PRODUZIONE GRIGLIE (RM): TERMINATA 05/03 (36X4=144 PEZZI + spares) PRODUZIONE SUPER BASKETS (RM) : TERMINATA 06/04 (36 SB + spares) PRODUZIONE PS HV APD (RM):TERMINATA 12/03 (18 CRATE, 144 BOARD + spares) PRODUZIONE CAVI HV (RM): TERMINATA 06/05 SISTEMA DI RAFFREDDAMENTO (MI): PRODUZIONE DI SERIE FERMATA PER PROBLEMI DI CONFORMITA' DELLE SALDATURE AGLI STANDARD RICHIESTI DAL CERN MOTHERBOARD (TO): PRODUZIONE DI SERIE IN CORSO OK