P-ILC Stato delle cose Massimo Caccia Catania, 4 luglio 2006.

Slides:



Advertisements
Presentazioni simili
Responsabile Nazionale: Stefano Giulini Castiglioni Agosteo,
Advertisements

R P Rivelazione Acustica Particelle A bassa temperatura e in Superconduttori Sommario problematica e risultati Nautilus Attivita svolta Programma del prossimo.
MAIS WP5 – Architectures Luca Negri Politecnico di Milano Roma – novembre 05.
I FINANZIAMENTI EUROPEI ALLA RICERCA BIOMEDICA: MITO E REALTA Maria Romano Fondazione S Raffaele del Monte Tabor Ferrara 25 Ottobre 2006.
P. Capiluppi Organizzazione del Software & Computing CMS Italia I Workshop CMS Italia del Computing & Software Roma Novembre 2001.
Introduzione alle attivita Software e Computing di Atlas Napoli M. Biglietti – G. Carlino – F. Conventi - A. Doria – L. Merola - A. Migliaccio Software:
Silvia Arcelli 1 Metodi di Ricostruzione in fisica Subnucleare Corso di Metodologie Informatiche Per la Fisica Nucleare e Subnucleare A.A. 2009/2010 I.
Progetto MATISSE MAmmographic and Tomographic Imaging with Silicon detectors and Synchrotron radiation at Elettra Tomografia Digitale per la diagnosi di.
24 settembre 2004Commissione Scientifica Nazionale I 1 KOPIO: Relazione dei referee Anna Di Ciaccio, Enrico Graziani Commissione Scientifica Nazionale.
Laboratorio di Strumentazione Elettronica
Laboratorio di Strumentazione Elettronica
Esperimenti di fisica delle alte energie 1 Esperimenti di Fisica delle Alte Energie Periodo didattico : II semestre CFU : 6 Ambito disciplinare : FIS/04.
ASIC per TOF-PET: caratteristiche generali
Tomografia al Seno con Luce di Sincrotrone
Consiglio di sezione INFN, 7 marzo 2006
PRIN2003 – PRIN2005 Università di Pavia Università di Bergamo
Front-End VLSI CMOS 0.35mm per dispositivi SiPM mirato ad applicazioni TOF con soglia regolabile ed ampio range dinamico. Davide Badoni – INFN Roma Tor.
Università di Modena e Reggio Emilia
Ischia, giugno 2006Riunione Annuale GE 2006 Elettronica di front-end per sensori monolitici a pixel attivi in tecnologia CMOS deep submicron a tripla.
Big Data e Big Science Alberto Di Meglio CERN openlab CTO DOI: /zenodo.8610.
26 settembre 2003Commissione Scientifica Nazionale I 1 KOPIO: Relazione dei referee Anna Di Ciaccio, Enrico Graziani Commissione Scientifica Nazionale.
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
1 referee-ATLAS CSN I, Roma 2-3/4/2007 RELAZIONE DEI REFEREE DI ATLAS F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 3 aprile 2007.
Opzioni tecnologiche per l’elettronica di front-end del Gigatracker Angelo Rivetti – INFN Sezione di Torino.
Relazione Referee Btev G.D’Agostini,C.Luci,M.Primavera L’esperimento è ancora in una fase di R&D volta alla sua approvazione. L’attività di R&D andrà completata.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
P-ILC Breve stato delle cose CSN1 - 6 febbraio 2006 M.Caccia Uni. Insubria & INFN Milano  inizio attivita’ a Roma 1 & LNF  sviluppo di sensori SOI -
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
R.N. - Referees LHCB-CSN1 09/021 LHCB : proposte dei referees Giulio D’Agostini Chiara Meroni Rosario Nania.
G. TONELLI / GR1-ROMA 5/6 APRILE CMS: PRESENTAZIONE DOCUMENTI RRB18.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 Ugo Montanari Dipartimento di Informatica Università di Pisa Moving Forward at the Age of 33 A new building for the Dipartimento di Informatica June.
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
An anomalous positron abundance in cosmic rays with energies 1.5–100 GeV PAMELA First Result from the Alpha Magnetic Spectrometer on the International.
Misure di Sezioni d’urto di Reazioni Nucleari di Interesse Astrofisico
CMS a Trieste Roma, 05/04/2005 GDR. 2 Cronologia : Matura interesse per LHC in Sezione/Gruppo 1 a Trieste Giro d’orizzonte degli esperimenti.
P-ILC 2007 Massimo Caccia Universita’ dell’Insubria & INFN Milano Trieste, 20 Settembre 2006.
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
P-ILC Proposta per un inizio di attivita’ Massimo Caccia Universita’ dell’Insubria / INFN Milano Napoli, 20 Settembre 2005.
F. Palla INFN Pisa CSN 1 - Roma - 16 maggio 2006 PRIN06 - Un Super Tracciatore per CMS Titolo e composizione  Un Super-Tracciatore per SLHC  Pisa (G.
P326 Relazione dei Referee L. Bosisio, M. Curatolo, A. Di Ciaccio, V. Vercesi CSN1 – Maggio 2006.
Catania, Kopio - Relazione dei referee1 KOPIO: Relazione dei referee Anna Di Ciaccio, Enrico Graziani Commissione Scientifica Nazionale 1 Catania,
G. PassalevaCSN1 Napoli – 20/09/2005 P-ILC relazione dei referees M. Dell’Orso, R. De Sangro, G. Passaleva.
2500 ricercatori da 150 Istituti di Ricerca e Universita’ di 35 paesi Per: attivita’ ricerca, strumenti, collaborazione Dissemination!!! Coordinatore:
- Referees PBTEV-CSN1 09/031 P-BTeV Relazione e proposte dei referee G.Batignani, C.Luci, M.Primavera Situazione 2003 L’esperimento e’ ancora in attesa.
Relazione su P-ILC G. Batignani, M. Diemoz, G. Passaleva.
Lo scenario del Linear collider LHC vs ILC: LHC è un progetto del CERN (strettamente europeo) È regolato dal Council cioè dagli stati membri 1 voto per.
MS - NA62 TDAQ INFN – Settembre 2011 TDAQ in generale Distribuzione clock/trigger: progetto definito, moduli finali in arrivo (?), installazione prevista.
Mara Martini Università di Ferrara Un Gigatracker per NA48/3 – P326.
L. Carminati - P. GovoniIII Workshop sull fisica di ATLAS-CMS1 sessione di discussione uno spunto: la calibrazione in situ dei rivelatori CALORIMETRI ELETROMAGNETICI:
1 CSN1 - Lecce 26/09/2003 TOTEM Relazione e proposte finanziarie Referee: G: Chiefari, M. Curatolo, M. de Palma.
18 Settembre Gruppo 11 BTeV: stato ed attivita’ Luigi Moroni Riunione Commissione 1 Catania, 17 Settembre 2002.
24 Sett. 04Totem -Relazione dei referee1 CSN1 - Assisi 24/09/2004 TOTEM Relazione e proposte finanziarie Referee: G: Chiefari, M. Curatolo, M. de Palma.
ATLAS al SLHC ( L=10 35 cm -2 s -1 √s= 14 TeV) Cosa è stato fatto: - Giugno 2004 : creato uno Steering Group “leggero” con il compito di organizzare workshop.
Report dalla CSN Settembre Sala dei Mappamondi - Torino Gianpaolo Carlino – Consiglio di Sezione, 5 Novembre 2012.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
PixFEL G. Rizzo 9-Maggio PIXFEL Non ripeto qui tutte le considerazioni fatte da Valerio e Francesco in meeting precendenti. Goal del progetto: sviluppare.
Riunione CSN1, Roma, Gennaio 2012F. Bedeschi, INFN-Pisa 1 Riunione CSN1  Comunicazioni  Comunicazioni varie  Riunioni future  Similfellows  Regole.
University of Pisa - presentation Mauro Dell’Orso University of Pisa.
SUMMARY Checking RIEPILOGO Verifiche RIEPILOGO Verifiche.
PIXEL R&D NETWORK F.Forti Milano, 27/3/2013. Ieri oggi domani Da molti anni lavoriamo insieme in varie attività di R&D PRIN a partire dal 1999 Vari progetti.
RIUNIONE DEI PRESIDENTI DELLE COMMISSIONI COMPETENTI IN MATERIA DI OCCUPAZIONE, RICERCA E INNOVAZIONE Roma, novembre 2014 Camera dei deputati (Palazzo.
1 OUTLINE CSN I, Roma 19-20/1/2015 RICH&THGEMSilvia DALLA TORRE Impegni per costruzioni – bilancio 2014 Read-out rivelatori ibridi ottobre 2014 – gennaio.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
Status Acceleratore e budget. Status Nell’ Ottobre 2010 abbiamo terminato la stesura di un nuovo “CDR2” pubblicato su:
Low Energy Particle Detector: Laser Induced DORELAS Rivelatori a Bassa Soglia di Energia vs Fisica Dai KeV all’eV sguardo d’insieme e prospettive Pompaggio.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
PixFEL PV Personale partecipante e richieste finanziarie
Transcript della presentazione:

P-ILC Stato delle cose Massimo Caccia Catania, 4 luglio 2006

Lo scenario internazionale  LCWS, 9-13 Marzo, Bangalore : ILC Global design effort team conferma la scala temporale definita nel 2005 (7 anni di costruzione ed installazione dal momento in cui la garanzia della copertura finanizaria e’ assicurata) e concorda sulla metodologia di valutazione dei costi. Viene riconosciuto il “ Quarto Concetto ” sperimentale, che assume un DREAM calorimeter vengono presentati, in bozza, i Detector Outline Document dei quattro “concetti”  EPP2010: Elementary Particle Physics in the 21 st Century ; Il rapporto finale del comitato incaricato dalla National Academy of Sciences Americana e’ reso pubblico il 26 Aprile

The results of the committee’s analysis have led to its chief recommendation. TheUnited States should remain globally competitive in elementary particle physics by playing a leading role in the worldwide effort to aggressively study Terascale physics. To implement the committee’s chief recommendation, the Department of Energy and the National Science Foundation should work together to achieve the following objectives in priority order: Fully exploit the opportunities afforded by the construction of the Large Hadron Collider (LHC) at the European Center for Nuclear Research (CERN). Plan and initiate a comprehensive program to become the world-leading center for research and development on the science and technology of a linear collider, and do what is necessary to mount a compelling bid to build the proposed International Linear Collider on U.S. soil. Expand the program in particle astrophysics and pursue an internationally coordinated, staged program in neutrino physics. Dal sommario del rapporto finale:

A vision for Fermilab Presentation to the National Academy Panel EPP 2010: Elementary Particle Physics In the 21 st Century Pier Oddone, 5/16/05 The Energy Frontier (ILC) The Energy Frontier (ILC) is the highest priority initiative for the laboratory

Una delle decisioni e’ stata quella di giungere, entro la fine dell’anno, alla bozza di un White Paper A detailed guide to the activities of the VTX community (Chief editor: MCa)

P-ILC 2006  focalizzato sullo sviluppo di rivelatori monolitici a pixel con architettura di sparsificazione  unita’ di Milano (Politecnico & Insubria) [testing & commissioning, simulazione ISE-TCAD, analysis sw], Pavia (Pavia e Bergamo) [design 0.13  m STm], Roma III [design 0.25  m TSMC, Si Strip telescope, analysis sw], Ferrara [DAQ, FPGA based]  contesto internazionale/sinergie: EUDET, un progetto I3 (integrated infrastructure activities) nel contesto del VI Programma Quadro, dedicato allo sviluppo delle infrastrutture di test su fascio per I rivelatori dedicati ad ILC ECFA – L(arge)D(etector)C(oncept) activities collaborazione con FNAL (sensor design) SLIM-5, progetto di gruppo 5 (Pavia) + PRIN05-07 MIMOSA, progetto di gruppo 5 (Roma III)

Una selezione dei risultati  implementazione di una architettura di sparsificazione in una tecnologia con D(eep)N-W(ell) (PV-BG): La DeepNWell domina l’area del pixel; funge da collettore ed ingloba i dispositivi PMOS necessari per poter integrare l’architettura di sparsificazione

Single pixel test structures 8 x 8 matrix + dummies consegnato in Gennaio 06 5 single pixel cells (con capacita’ di iniezione e output analogico) matrice 8 x 8 di pixel di 50 μm passo con discriminatore integrato nel pixel e segnale binario Test essenzialmente completati (Pisa, Pavia, Bergamo) strutture dedicate saranno prodotte nei run di – Agosto: matrice 8x8 con pitch 50 um, blocchi digitali per lettura sparsificata per interfacciamento con trigger livello I (specifiche B-factory) + matrice 3x3 con uscite analogiche (P-ILC; interazione con ROMA III); costo a carico di SLIM5 - Novembre: matrice di passo 20 um (P-ILC), front-end italiano e, possibilmente, circuito di sparsificazione di FNAL (costo a carico di P-ILC) Il chip APSEL1 (PRIN04-06)

Alcuni risultati su APSEL1: Rumore; netto miglioramento rispetto ai 140 e r.m.s del primo prototipo: Guadagno: risolto il problema del basso guadagno d’anello rilevato in Apsel0 (essenziale per rendere il guadagno indipendente da C D ) Dispersione di soglia ancora alta (segnale da una mip ~ 1200 elettroni) Instabilita’ del sistema, probabilmente dovuta ad una massa comune tra il substrato ed il digitale Peaking time [s] ENC [e - rms] Charge sensitivity [mV/fC] Apsel1Apsel2 Sezione analogica340 e - 42 e - Sezione analogica + discriminatore 340 e - 50 e -

 design & caratterizzazione di un prototipo in tecnologia quarter micron TSMC + telescopio a strip (ROMA III) [MIMOSA gr 5]: Pitch = 17  m 4096 pixels Pitch = 34  m 1024 pixels Test structures TSMC 0.25  m spessore epitassiale ~ 8  m topologia dei transistori secondo i canoni della radiation hardness diverse configurazioni, in termini di numero e forma di diodi collettori) architettura SENZA sparsificazione

Alfa event small pitch (17  m ) MIMOSA chip Risultati Preliminari Alfa event large pitch (34  m ) X 5.9 KeV 8.4 Kev

 costruzione di un telescopio basato su strip a singola faccia (5 piani, ognuno con 2 rivelatori con strip incrociate) (ROMA III): Distribuzione dei residui, da un run di cosmici in fase di ultimazione primo test su fascio alla BTF di Frascati a Luglio (Roma III, Como)

 sviluppo di un sistema di DAQ, controllato da FPGA, che integri funzionalita’ di sparsificazione (FERRARA + pre-existing know-how SUCIMA/LEPSI): il progetto e’ stato completato lo sbroglio e la produzione e’ in corso I test ed il commissioning avranno inizio in Luglio (Ferrara + Como) adottata da EUDET come DAQ per il telescopio a pixel review in ottobre EUDRB_DCA: Analog daughter card (June 15th 2006) EUDRB_DCD: Digital daughter card (June 22nd 2006) Screenshot from a TLA714 logic analyzer: an MBLT block read of 64 bytes, initiated by the CPU when nAS goes low and terminated when the slave shows by driving nBERR low that it holds no more data to be read. L.Chiarelli, A.Cotta R., Ferrara, June 2006

 sviluppo di una metodologia generale di test di rivelatori e strutture (hw & sw) (Como); esempi, utilizzando I sensori MIMOSA 5 e MIMOTERA (SUCIMA): 0/ mappe di piedestallo e rumore Analisi con la SUCIMAPIX sw suite (Como-Roma), adottata come piattaforma di sviluppo per EUDET-pixel

1/ linearita’ della risposta con un sistema laser [complementata da misure di image lag e di image blooming] (MIMOTERA) IR laser Red laser SUCIMA DAQ board

2/ calibrazione del guadagno/misura della efficienza di raccolta di carica dalla rivelazione degli X di fluorescenza da un cristallo esposto ad un fascio usato per diffrattometria (MIMOSA 5) Golden peak di calibrazione

Richieste per P-ILC 2006  sblocco del sub-judice per il run 0.13  m (PV)  sblocco del sub-judice per il sistema di raffreddamento del telescopio (Roma III)  xtra missioni interne (2 kEUR/sezione; 8 kEUR totali)  a carico di chi sono le missioni esplorative (distinguendo eventualmente tra I preliminari & i contatti di chi, nel 2007, entrera’ nella collaborazione)?

P-ILC 2007  consolidamento delle unita’ legate ai Pixel :  estensione alla calorimetria adronica, assumendo come photon detector i SiPhotoMultiplier; in fase di convergenza (LNF, ROMA I, Pg ( Giovanni Ambrosi )); base di partenza: RAPSODI (EC project lead by Como) + INFN-IRST agreement  possibile estensione al Software (Lecce)  estensione alle attivita’ teoriche (coordinate da Firenze/Lnf: Daniele Dominici & Stefania De Curtis, Lia Pancheri); workshop ad Ottobre + Galileo FTE 2006FTE 2007 Milano ROMA III Ferrara Pavia3.04.5

… sullo stato del software

E’ in corso un tentativo di “armonizzazione” dei sw packages e delle risorse

??? The Folder Browser TPC.RecPoints.root Object Tree Root dir Folder Event #1 TPC.Hits.root Event #2 TreeH Kine.root Event #2 TreeK Event #1 TreeK TPC.Digits.root Event #1Event #2 File EMC.Tracks.rootEMC.Digits.rootTPC.Tracks.rootEMC.Hits.rootTPC.RecPoints.root Object g ILC.root RunLoader gILC TreeE TreeD In cui si inserisce, in modo alternativo, la proposta del gruppo di Lecce, sviluppata per giungere al Detector Outline Doc. Del IV concetto

La proposta : riconoscere al gruppo di Lecce un year of grace, con risorse sufficienti a garantire un anno di attivita’ per inserirsi (e non per contrapporsi) alle attivita’ di DESY & SLAC, con una priorita’ agli algoritmi piuttosto che all’architettura ed una focalizzazione sul tracking, dove per ora si utilizzano ancora algoritmi e codici ereditati da LEP

P-ILC pixel Milano% Massimo Caccia, PA100 Chiara Cappellini, Assegnista50 Fabio Risigo, Assegnista50 Marcin Jastrzab, Ing. Elettronico, Borsista50 Andrea Castoldi, PA (POLIMI)20 Giacomo Langfelder, Dottorando (POLIMI)30 Servizio di off. meccanica20 Pavia% Valeria Speziali, PO50 Valerio Re, PA70 Lodovico Ratti, RU40 Massimo Manghisoni, RU80 Gianluca Traversi, RU60 Claudio Andreoli, dott.rando100 Enrico Pozzato, dott.rando50 Luigi Gaioni (EUDET)100 Ferrara% Concezio Bozzi (Ric INFN) 30 A. Cotta-Ramusino (primo tecnologo) 15 Livio Piemontese (DR) 30 Tomassetti (tecnologo) 25 Davide Spazian (EUDET) 100 Roma III deve ancora finalizzare nomi e %

P-ILC 2007 – calo & soft LNF% Riccardo de Sangro40 Alessandro Calcaterra40 Giuseppe Finocchiaro30 Piero Patteri30 Marcello Piccolo40 Matteo Rama30 Roma I% Simonetta Gentile, PA40 Carlo Bosio50 Katerina Kuznetova, assegnista 40 Dip. Ing. Elettronica (4 persone) 120 CNR (2 persone)60 ISS (2 persone)60 Lecce (sw)% Corrado Gatto(Ric INFN) 100 Anna Mazzacane (dott.rando) 100 Giuseppina Terracciano (dr.rando) 100 Daniele Barbareschi (borsista) 100