Lo sviluppo della rete GARR ricadute sull’attivita’ di ricerca dell’INFN Roma, INFN-CCR 21 Ottobre 2005

Slides:



Advertisements
Presentazioni simili
La Larga Banda della Pubblica Amministrazione AlexCurti.it.
Advertisements

Situazione finale installazione DF ENEA Portici – POP NA1
Aspetti critici rete LAN e WAN per i Tier-2
La Rete della Ricerca, il modello di evoluzione INFN - CCR Workshop - Otranto 7 giugno 2006 Claudia Battista
Il Contact Center Di Poste Italiane protagonista nella Giornata Nazionale della Relazione con il Cliente 11 ottobre 2006.
Grid Computing Sergio Andreozzi. Chi è interessato ad analizzare i dati generati da LHC? Circa 5,000 scienziati –distribuiti nel mondo –appartenenti ad.
Divisione Passeggeri N/I
25 ottobre 2002infn1 FIRB-Grid WP3,5 Grid deployment.
Technical Board 21 novembre 2000 WP5 - Network Luciano Gaido 1 Progetto INFN-GRID WP5 - Network Technical Board Cnaf, 21 novembre 2000.
LNL CMS M.Biasotto, Firenze, 22 maggio Hardware e tools di installazione Massimo Biasotto INFN – Lab. Naz. di Legnaro.
* * Data Challenge 04 Stato dei centri di produzione in Italia.
1 LA RETE In servizio da Aprile 2012 TORINO MILANO VENEZIA PADOVA BOLOGNA ROMA NAPOLI SALERNO FIRENZE Treni/giorno: 50 km/anno: 12 milionI.
La rete GARR stato ed evoluzione a GARR-Giganet
La rete per l’INFN: oggi e domani per LHC Riunione sul Calcolo INFN CSN1 Perugia, Novembre 2002.
Francesco Lazzeri Roma, 4 Luglio 2001
Trentino in Rete Trento, 13 marzo Reti per la comunità: il Trentino e la larga banda 2 Lo stato di attuazione (dorsale in fibra ottica) Tratte lineari.
GARR - Stato e prospettive Massimo Carboni 25 Maggio 2004 Terzo workshop sul calcolo nell'INFN Sant’Elmo CAGLIARI.
Roma, 14 maggio 2004 Nuovi strumenti per l’Italia Digitale
Tecnologie di rete avanzate prospettive e progetti Workshop CCR 2003, Pæstum 9-12/6/2003 M.Carboni, Consortium GARR.
Riunione CCR 21/12/2005 Gruppo Storage Relazione sulla analisi di infrastrutture Fibre Channel e presentazione attivita’ per il 2006 Alessandro Brunengo.
Il lavoro e le opportunità per giovani e cooperative: i servizi e le progettualità di Confcooperative Progetto per una offerta integrata di servizi per.
Occasione, Luogo, gg.mm.anno Nome Cognome GARR-X Le novità.
Evoluzione UMRP progetto “Tablet”. Premessa Con l’entrata in esercizio del tablet, dal 1°aprile 2015 sarà possibile centralizzare il processo di produzione.
LIVE TALK - Cloud e Big Data Speed Pitch di Cesare Veneziani, Amministratore Delegato, MC-link.
WORKSHOP GARR_08 GARR-X: il futuro della Rete _ Milano 1-4 aprile 2008 Modelli di MAN ed integrazione in GARR-X Marco Marletta Workshop GARR_08 Milano.
Piano esecutivo GARR-X Pianificazione per l’INFN CCR - INFN, Roma 6 ottobre 2010 C.Battista, M.Carboni.
LHC-OPN / LHCONE Update CCR LNS (CT), Maggio Stefano Zani (INFN CNAF)
Report sul Workshop GARR 06 netWORK in progress: la rete evolve con i suoi utenti Roma, novembre 06 P. Lo Re, CCR 13 dicembre 2006.
WORKSHOP GARR 08 GARR-X: il futuro della Rete - Milano 1-4 aprile 2008 Alessandro Inzerilli I PoP in GARR-X Alessandro Inzerilli GARR Operations.
Gaetano Maron, Presentazione T2 LNL-Padova, Legnaro 22 dicembre Il Servizio Tecnologie Informatiche ed Elettroniche dei LNL Gaetano Maron.
Referaggio apparati di rete 2012 Sessione giugno Gruppo referee rete Fulvia Costa Enrico Mazzoni Paolo Lo Re Stefano Zani Roma, CCR
Referaggio apparati di rete 2015 Seconde priorità Gruppo referee rete Fulvia Costa Paolo Lo Re Enrico Mazzoni Stefano Zani Roma 1, CCR marzo 2015.
26 Giugno 2007CSN1 - Frascati1 Temi di attualità nella CCR Accanto alla tradizionale attività di controllo dei finanziamenti per le infrastrutture di calcolo.
Riunione PRIN STOA - Bologna - 18 Giugno 2014 Testbed del T2 distribuito Napoli-Roma Dr. Silvio Pardi INFN-Napoli Riunione PRIN STOA – Bologna 18 Giugno.
Workshop finale Avviso 1575, Catania, Enzo Valente "La rete GARR: stato attuale e prospettive future"
Stato Progetto GARR-X M.Carboni & C.Battista INFN-CCR:
Domenico Elia1Riunione PRIN STOA-LHC / Bologna Attività per ALICE: sommario e prospettive Domenico Elia Riunione PRIN STOA-LHC Bologna, 18 Giugno.
Proposta di rete GARR-X Fase0 Claudia Battista, Massimo Carboni INFN-CCR 1/10/2008.
Stato di GARR-X Claudia Battista Workshop CCR INFN - Isola d’Elba 17 maggio 2011.
Referaggio sigla CALCOLO D. Bonacorsi, G. Carlino, P. Morettini CCR – Roma 9 Settembre 2014.
ATLAS e CMS Relazione dei referees A. Cardini, M. Grassi, G. Passaleva, A. Passeri, V.Vagnoni.
L’evoluzione della Rete GARR Massimo Carboni. Agenda  Il disegno di rete  Da GARR-X a GARR-X Progress  Evoluzione del modello trasmissivo  L’integrazione.
Esigenze di rete per il calcolo LHC Workshop CCR LNL, Febbraio 2011 Stefano Zani INFN CNAF 1S.Zani INFN CNAF.
GARR – chi siamo Il Consortium GARR progetta e gestisce la rete telematica nazionale dell'Università e della Ricerca. Attualmente è costituito come associazione.
IL PROGETTO WORKSHOP GARR_08 GARR-X: il futuro della Rete _ Milano 1-4 aprile 2008
Il progetto Padova, 23-Giugno-2008 Ugo Monaco GARR Network Engineer Prospettive di sviluppo della Rete della Ricerca Scientifica:
11 Richieste di banda Anno 2010 T.Ferrari, M.Morandin CCR, Roma, 30 settembre 2009.
Uso della rete geografica e richieste di upgrade CCR 31/3/2015 (Roma) S.Zani.
Netgroup (Rapporto di aggiornamento alla Commissione) Stefano Zani (INFN CNAF) CCR Roma, Ottobre 2013.
19/4/2013 D. Menasce, M. Serra - Referaggio Progetti INFRA e WLCG 1.
Stato e previsione rete nelle sedi INFN Survey ed ipotesi di sviluppo fino al 2018 CCR 8-10 Settembre 2018 (Roma) 1 S.Zani (Netgroup)
International Research Networking ll progetto ASTRA per ricostruzione di strumenti musicali antichi con GRID su GEANT2 e EUMEDCONNECT Domenico Vicinanza.
Referaggio apparati di rete 2013 Seconde priorità Gruppo referee rete Fulvia Costa Paolo Lo Re Enrico Mazzoni Stefano Zani Referaggi aprile 2013.
Riunione CSN1, Roma, Gennaio 2012F. Bedeschi, INFN-Pisa 1 Riunione CSN1  Comunicazioni  Comunicazioni varie  Riunioni future  Similfellows  Regole.
WORKSHOP GARR_08 GARR-X: il futuro della Rete _ Milano 1-4 aprile 2008 Maurizio Scarpa Architettura di GARR-X.
Aggiornamento potenziamento collegamenti e stato del Progetto GARR-X Claudia Battista CCR-INFN - 3 marzo 2008.
Aggiornamento Netgroup R.Gomezel Commissione Calcolo e Reti LNF 29/09/ /10/2009.
Referee ALICE C.Agodi, D.Calvo, A.Di Ciaccio, P.Iaselli, S.Pirrone CSN3 – Torino, 17 - settembre 2013.
EGEE is a project funded by the European Union under contract IST Il pre-production service in EGEE e in INFN-GRID D. Cesini - INFN-CNAF IV.
L’infrastruttura del progetto ReCaS Paolo Lo Re on behalf of ReCaS collaboration.
Aggiornamento fornitura circuiti INFN Maggio 2007.
L.Perini Milano: 10 Gennaio Ex-ATLAS-Grid (Tier2 incluso) l Ruolo dei Tiers in ATLAS e grid l Le persone di Milano e le attività l Le infrastrutture.
Esigenze di Rete degli Esperimenti LHC e di Gr1 G. Carlino – INFN Napoli CCR – Roma 8 Settembre 2014.
Relazione utilizzo rete, proposte per banda e collegamenti extra GARR
EU-IndiaGrid Project Joining European and Indian grids for escience
GARRX 8 aprile 2008 Rete Futura GARRX 8 aprile 2008
Collegamento a Garr-X Il collegamento alla nuova rete Garr-X dovrà garantire il massimo della efficienza nella gestione della banda. Per identificare opportunamente.
Calcolo distribuito in Radioastronomia
Transcript della presentazione:

Lo sviluppo della rete GARR ricadute sull’attivita’ di ricerca dell’INFN Roma, INFN-CCR 21 Ottobre 2005

2 [INFN-CCR, Roma, 21 Ottobre 2005] Agenda  GARR-G Status –Phase 3 GÈANT2 –INFN Tier1 Status –INFN Tier2 Status –Phase 4 GN2-JRA4 CBF Activity  LCG Testing Activity  INFN Tier1 vs GARR- G & GÈANT2  Conclusions

3 [INFN-CCR, Roma, 21 Ottobre 2005] GARR-G Phase 3  Implementation ongoing  Completed Dec ‘05  10G lambdas (Red Lines)  2x10G accesses, several 1G  L3 infrastructure  GEANT2 access:n*10Gbps starting from Nov ’05 FI PG 2.5Gbps SDH/WL 10Gbps SDH/WL Dark Fibre/DWDM EumedConnect MI2 MI4 GEANT2 INFN-CNAF (10Gbps) Juniper M320 / M20 Cisco GSR-124xx CA SS AQ AN PV 155M SDH / 622M SDH CO CS ME RC PZ MT LE PA TS VE GE GX Telia Seabone SA LHC – Backup via CBF  INFN Tier1 at 10GE LAN-PHY end of Oct ’05 BO PD MI1 MI3 FRA RM2 RM1 NA TO PI BA CT

4 [INFN-CCR, Roma, 21 Ottobre 2005] Accessi INFN

5 [INFN-CCR, Roma, 21 Ottobre 2005] The INFN Tier2 Status  All Sites are connected at 1Gbps on a dedicated port. No limitation from the GARR Perspective. CNAF access will be upgraded at 10Gbps in few days.

6 [INFN-CCR, Roma, 21 Ottobre 2005] GARR-G Network Technology  Network technology vs. Advanced Application –IPv4, IPv6, Multicast –QoS e2e –MPLS, VPN, (VPLS under study) –Bandwidth on Demand –IP premium, diffserv (only if really needed) –Network monitoring

7 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

8 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

9 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

10 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

11 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

12 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

13 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

14 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

15 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

16 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

17 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

18 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

19 [INFN-CCR, Roma, 21 Ottobre 2005] # GARR-G * Current map * December 2004 * July 2004 * May 2004 * March 2004 * May 2003 # GARR-B * December 2002 * December 2001 * September 2001 * April 2000 * May 1999 * April 1999 * January 1999 # GARR-2 # GARR-1

20 [INFN-CCR, Roma, 21 Ottobre 2005] Fase Fase Fase Fase Fase BackBone 54Gbps GARR-BGARR-G Accesso 29Gbps Fase POP: 15 TI + 1 GARR 1 Carrier POP: 15 TI + 4 GARR 1 Carrier BackBone 1Gbps Accesso 500Mbps Fase POP: 7 TI + 30 GARR 8 Carrier Gigabit/sec

21 [INFN-CCR, Roma, 21 Ottobre 2005] GEANT2 Network Architecture

22 [INFN-CCR, Roma, 21 Ottobre 2005] INFN Tier connectivity Nov’05 Dec’05  GARR-G will provide a 10Gbps light-path vs. CERN Nov’05 and 2x10Gbps Dec’05 –Unprotected path –Unmanaged from the GEANT2 CERN side 1H06  Second 10Gbps light-path vs. CERN on a differentiated path on 1H06 via CBF  GARR and INFN Tier1 are ready at 10GE on a dedicated 10G-SDH path Bo-Mi-Gva

23 [INFN-CCR, Roma, 21 Ottobre 2005] PoP Geant2 - IT AT GARR CNAF RT1.BO1 RT.RM1 RT.MI1 CERN eBGP AS513 – AS137 T1 T0 T1 T2 10GE-LAN STM-64 IP access 10GE-LAN lightpath access GFP-F STM-64 10G – leased λ’s Italian LHC Architecture PoP Geant2 - CH

24 [INFN-CCR, Roma, 21 Ottobre 2005] I router Juniper al GARR 3 Juniper M20 from Apr Juniper M320 from Aug 2004

25 [INFN-CCR, Roma, 21 Ottobre 2005] LCG / Tier1 testing activity  LCG 2*GbE  INFN Tier1  GEANT

26 [INFN-CCR, Roma, 21 Ottobre 2005] Il 95 th percentile misura dell’uso della banda  Il consumo di rete viene campionato ad intervalli regolari (5min.). Il 5% dei campioni piu’ alti viene scartato. Il 95 th percentile e’ il valore piu’ grande dei campioni rimanenti.  Tale valore e’ quello che viene attribuito ad una singola sede. Questa assunzione equivale a dire che il picchi di rete non sono rappresentativi del normale uso di rete e dunque vengono scartati.

27 [INFN-CCR, Roma, 21 Ottobre 2005] INFN-CNAF: 95 th percentile un caso reale ENTE AVERAGE IN (kbps) AVERAGE OUT (kbps) PEEK IN (Mbps) PEEK OUT (Mbps) VOLUME IN (100 GB) VOLUME OUT (100 GB) 95% IN (Mbps) 95% OUT (Mbps) 95% (Mbps) FAULT (Hours dec.) AVAILABILIT Y (%) INFN di Bologna CNAF Average Out Mbps 95 th percentile Mbps Peak Mbps Average Out Mbps 95 th percentile Mbps Peak Mbps

28 [INFN-CCR, Roma, 21 Ottobre 2005] Consumo 95 th percentile 2005

29 [INFN-CCR, Roma, 21 Ottobre 2005] Bw al 95 th percentile nel 2005 Mbps

30 [INFN-CCR, Roma, 21 Ottobre 2005] Attivita’ di Ricerca e Sviluppo (1/3)  Come già nel 2005, una parte importante delle risorse verrà destinata alla partecipazione ed al supporto di attività e progetti di ricerca e cooperazione, con particolare riguardo ai progetti finanziati dalla Commissione Europea nell’ambito del 5° e 6° Programma Quadro e del Programma EUROPAID.  Il 2006 vedrà la conferma dell'impegno del Consortium GARR nei progetti EGEE, GN2, MUPBED, EUMEDCONNECT e ALICE.  Per quanto riguarda in particolare le attività di ricerca all’interno di GN2, proseguirà l’impegno GARR nelle JRA1, JRA2, JRA3, JRA4 e, indirettamente, JRA5 attraverso la partecipazione alle TF di TERENA l’attivita’ di JRA5. Importante, sia in termini di manpower che di impatto sulla rete GARR e sui servizi offerti all'utenza, anche l'impegno in SA3. L'attività di maggiore interesse e’ attualmente la sperimentazione e l’implementazione del servizio Premium IP.

31 [INFN-CCR, Roma, 21 Ottobre 2005] Attivita’ di Ricerca e Sviluppo (2/3)  Accanto alla prosecuzione dei progetti già in essere, è prevista la partenza, nel corso del 2006, di una serie di nuovi progetti Europei a partecipazione GARR, sia nell’ambito della connettività internazionale che delle Griglie.  EUMEDGRID, EUChinaGRID e EU-IndiaGRID mirano ad un allargamento della infrastruttura di EGEE ad aree extraeuropee ritenute strategiche e con cui l’INFN ha rapporti di cooperazione. I primi due hanno appena (20 settembre) concluso positivamente la fase di negoziazione con la Commissione Europea e se ne prevede la partenza per Gennaio 2006, mentre per il terzo si prevedono tempi più lunghi in quanto è ancora in attesa dei risultati del review da parte degli esperti della Commissione.  Per quanto riguarda la connettività internazionale, GARR sarà coinvolto nei progetti AUGERACCESS, il cui scopo è quello di collegare all'Europa il laboratorio argentino dell'esperimento AUGER) ed ORIENT, che si propone di creare un link diretto Francoforte-Shangai. Anche questi progetti hanno portato a termine la fase di negoziazione con la Commissione e se ne prevede pertanto una rapida partenza.

32 [INFN-CCR, Roma, 21 Ottobre 2005] Attivita’ di Ricerca e Sviluppo (3/3)  Per questi nuovi progetti, il coinvolgimento GARR prenderà varie forme: da un lato, continuerà l’impegno tradizionale al livello di network, sia in termini di supporto che di ricerca ed innovazione (un caso di particolare interesse sarà in questo senso l'impegno in EUChinaGRID, che vede un importante impegno sul fronte dello studio dell'interoperabilità IPv4-IPv6, ponendosi come prosecuzione del lavoro fatto all'interno del progetto 6Net, terminato nello scorso giugno); accanto a questo, verranno però enfatizzate le due aree relativamente nuove della disseminazione e del project management.  Un discorso a parte riguarda un quarto progetto di griglia, EGEE2, che si propone di proseguire il lavoro di EGEE (che terminerà i lavori nei primi mesi del 2006). In questo progetto, GARR sarà coinvolto non sotto il profilo tecnico, ma su quello politico e dei requirements. Lo scopo è di nuovo quello di supportare gli utenti GARR che partecipano a EGEE o ne utilizzano l’infrastruttura.  Inoltre, GARR ccontinuerà a fornire supporto a quei progetti che coinvolgono suoi utenti (DEISA, JIVE) e ad essere presente, direttamente o attraverso i suoi gruppi di lavoro, all'interno di numerose task forces di TERENA TF-NGN, TF-PR, TF-CSIRT, TF-VVC, TF-EMC2 e TF-MOBILITY

33 [INFN-CCR, Roma, 21 Ottobre 2005] GARR-G Phase 4  Next generation network –GARR-x Pilot  Owned optical infrastructure –Roma-Bologna-Milano –1000 Km total fibre length –DWDM: 4x10G initially on each span  Deployment and Integration of a complementary infrastruction based on GN2-JRA4 CBF activity TO GigaPOP MegaPOP 2.5Gbps SDH/WL 10Gbps SDH/WL Dark Fibre/DWDM EumedConnect BO SA CA SS PG AQ AN SA NA MT LE BA CS PZ ME RC CT PA TS VE PD PI GE PV RM2 FRA RM1 MI1 CO MI4 MI2MI3 GEANT2 LHC – Backup via CBF LambdaPOP FI

34 [INFN-CCR, Roma, 21 Ottobre 2005] Manno Zurich/CH Italy Cross Border Fibres TO PG AQ AN SA MT LE CS PZ ME RC TS VEPD PI GE FRA PA SS CA MI4 MI1 PV MI2 Ljubljana EumedConnect Tirana RM2 MI3 CO BO RM1 BA NA CT FI

35 [INFN-CCR, Roma, 21 Ottobre 2005] NODO LancettiCalderaColomboBovisaComo Lancetti x---8 km---43 km Caldera ---x15 km13 km--- Colombo 8 km15 kmx--- Bovisa km---x43 km Como 43 km kmx Anello Metropolitano: Milano-Como  Anello di 130Km in fibra ottica G.652 su 5 sedi  La configurazione iniziale 6 lambda fino ad un massimo di 32 lambda  Coesistenza di accessi utente G/ETH protetti e lambda a 2.5Gbps SDH non protette  Predisposizione per la crescita a 10Gbps

36 [INFN-CCR, Roma, 21 Ottobre 2005] Infrastruttura ottica su fibra spenta nazionale Anello WDM 130Km

37 [INFN-CCR, Roma, 21 Ottobre 2005] Conclusioni  La rete GARR-G e’ over-provisioned, questo paradigma diventera’ ancora piu’ evidente con l’ulteriore evoluzione verso l’infrastruttura ottica proprietaria.  L’accesso del Tier1 INFN nel 2006 sara’ ad almeno 2*10G su cammino ottico dedicato  La Fase4 di GARR-G consentira’ di avere un accesso trasparente a Livello2 relativo all’interconnessione Tier0- to-Tier1  L’integrazione tra GEANT2 and CBF consentira’ di immaginare un modello scalabile di collegamento tra i differenti Tier–to–Tier.  L’evoluzione della rete analogamente al passato rendera’ disponibili accessi (F/G)Ethernet su fibra a tutte le sedi INFN.

38 [INFN-CCR, Roma, 21 Ottobre 2005]