CSN1 21 - 22 giugno 2004 - Comunicazioni Riunione R-ECFA ai LNF 21&22 maggio; buona impressione data dallEnte. Follow-up? Giornata PT 05-07 ai LNGS 3&4.

Slides:



Advertisements
Presentazioni simili
Brussels launch of the Association Bruno Trentin-ISF-IRES Fulvio Fammoni President Associazione Bruno Trentin-Isf-Ires (Italy) Brussels, 26 settembre 2013.
Advertisements

L’esperienza di un valutatore nell’ambito del VII FP Valter Sergo
FOXBIT property. The diffusion or disclosure of this document or the contained information without explicit authorization/agreement is prohibited. Any.
EBRCN General Meeting, Paris, 28-29/11/20021 WP4 Analysis of non-EBRCN databases and network services of interest to BRCs Current status Paolo Romano Questa.
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Copia darchivio (Preservation copy) A Preservation copy (or Archive copy) is the artefact designated to be stored and maintained as the preservation master.
1.E un algoritmo ricorsivo: Tutti le istanze di oggetti raggiungibili da un oggetto persistente diventano anchessi persistenti.
OWASP-Day e progetti OWASP-Italy
Metrica CSA07 1.Reconstruct events at the Tier-0 at greater than 100 Hz for 30 day a) The target is 24 hr/day, threshold 20 hrs/day 5 days a week Target:
1 Muon commissioning & prospettive Global Runs - Attivita di commissioning con i cosmici (run locali, indipendenti dal resto di CMS): - check sistematico.
L.Mandelli _CSN1_Settembre 02 LAr 2003 Stato della calorimetria Elettromagnetica Stato delle responsabilità INFN. Attività e responsabilità future del.
Chiara Carlucci - Isfol 15 giugno 2007 CDS Isfols specialised documentation centre.
Corso di Laurea in Ingegneria Elettronica - U niversità di N apoli F EDERICO II Autori XXXXX XXXXXXX YYYYY YYYYYYY ZZZZZ ZZZZZZZ Titolo tesina Parte X:
3/07/2006Catania CSN11 KLOE Stato dellesperimento: –a marzo si è conclusa con successo la presa-dati dellesperimento, Raccolti: 2.5 fb -1 on-peak0.250.
Infrastruttura & Competenze ICT ENEA
Avis Contact Centres Review
1 Astroparticle Physics in Space Claudia Cecchi Dipartimento di Fisica e Sezione INFN, Perugia Workshop Nazionale La Scienza e la Tecnologia sulla Stazione.
Metadati gestionali e amministrativi per oggetti digitali nativi Antonio Scolari Seminario nazionale sui metadati Roma, 3 aprile 2001.
2000 Prentice Hall, Inc. All rights reserved. 1 Capitolo 6: Classi e astrazione dati 1.Introduzione 2.Definizione delle strutture 3.Accedere ai membri.
Progetto pilota per lintroduzione della Razza Bovina Marchigiana in Albania: Primi risultati Pilot project for the installation of a Marchigiana cattle.
National Project – on going results Potenza 7/10 November 06 IT-G2-SIC-066 – Social Enterprise and Local Development.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Institute for Atmospheric Pollution – EKOLab Consiglio Nazionale delle Ricerche Environmental Terminology Workshop 2 nd Ecoterm Group Meeting UBA - Umweltbundesamt.
S. Bolognesi (1) from CMS A. Di Simone (2) from ATLAS 1 Università di Torino ed INFN Torino 2 Università di Roma Tor Vergata ed INFN Roma 2 V workshop.
Test-beam X5/H Workshop a dicembre su organizzazione attivita 2003 Mail generale inviata a tutti da F.Cerutti Date del workshop (definitive) Venerdi.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
BML-D 001 Monitoring Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino, F. Conventi, R. de Asmundis, M.Della Pietra, D.
ATLAS RPC Meeting, Lecce Roberto Perrino INFN Lecce RPC Atlas Bachelite Assemblaggio Altro.
VII EBRCN GM, Berlin, 26-28/09/20041 EBRCN Site: current status Béatrice Dutertre Questa presentazione può essere utilizzata come traccia per una discussione.
Palermo, may 2010 F.Doumaz, S.Vinci (INGV-CNT- Gruppo di telerilevamento)
STAGE IN LINGUA INGLESE ISIS GREENWICH SCHOOL OF ENGLISH GREENWICH Data: dal al Studenti delle II-III-IV classi Docenti coordinatori:
1 © 2013 Cobra Italia SpA All rights reserved Cobra group website Gennaio 2013.
Andrea Petricca Problematiche di rete nella sperimentazione di file-system distribuiti su WAN per applicazioni di GRID-Computing Rapporto trimestrale attività
Socrates - Grundtvig D E S I G N I N G I N C L U S I V E S P O R T A C T I V I T I E S F A C I L I T I E S Questa presentazione può essere.
Italiano 6 Test review – Days, Dates, Months, Seasons, Weather Press View Slide Show. Then click through the slide show and review the various topics.
Micro-Robot di dispensazione a 3 assi EzROBO 3
Last quarter work and future activities
Rivelazione raggi cosmici ad alta energia con controllo remoto
Imprinting e giunzione Nanoclusters metallici
Giovedì 17 Aprile 2008 Heroes {Community} Launch Giovedì 17 Aprile 2008.
I City Camps sono la vacanza-studio in inglese animata da Tutors anglofoni direttamente nella scuola della nostra citta' durante i mesi estivi.
* * Data Challenge 04 Stato dei centri di produzione in Italia.
FOR EVERY CALLOUT THAT YOU WILL SEE IN ENGLISH PROVIDE (IN WRITING) THE CORRECT ITALIAN SENTENCE OR EXPRESSION. REMEMBER TO LOOK AT THE VERBS AND PAY.
20 maggio 2002 NETCODE Set up a thematic network for development of competence within the Information Society.
Biomedical Engineering Dep.,Mario Negri Institute, Bg, Italy
Analysis and Development of Functions in REST Logic: Application to the «DataView» Web App UNIVERSITA’ DEGLI STUDI DI MODENA E REGGIO EMILIA DIPARTIMENTO.
The optimal therapeutic approach to Bone Metastasis
Early Language Learning and Multilingualism: Scottish and European Perspectives BILINGUALISM MATTERS.
Roma 18/12/2001Mauro Savrié1 Articoli 2222 Tipologia e criteri: - minimo di 4 mesi - prestazione d’ opera (occasionale) - sono “ ad personam” e non ripetibili.
1 Acceleratori e Reattori Nucleari Saverio Altieri Dipartimento di Fisica Università degli Studi - Pavia
1 aprile '03 Mauro Morandin Proposte referees relative a richieste ordin. amm. CMS.
Lecce, 24 sett. 2003Referee Magneti Atlas & CMS1 ATLAS Le bobine sono finite e consegnate al CERN Rimangono problemi sugli schermi termici di cui INFN.
PROPOSTE PER CMS Calabrese Campana Morandin ( ) Discussione sj locali + fondo indiviso per DT + RPC + MI ECAL (il resto e’ rinviato a settembre)
WG-SLHC Dove siamo, …. dove e come andiamo? Spunti per una discussione M. de Palma Roma, CSN1 16 Maggio 2006.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
CMS – Richieste finanziarie Tracker M.Est. – partecipazione test beam M.Int. – Meeting di consorzio italiano Consumi – Quasi partenza produzione, tooling.
10 Ottobre CSN1 P. Capiluppi Tier2 CMS Italia 3Bari  In comune con Alice 3Legnaro  In comune con Alice 3Pisa 3Roma1  In comune con Atlas Sedi.
ATLAS / CMS /RD-FASE2 M.Grassi, S.Miscetti, A.Passeri, D.Pinci, V.Vagnoni M.Grassi D.Pinci F.Marchetto, R.Bellazzini.
Elezione Responsabile Nazionale ATLAS
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
R&D fase 2 – RPC 4st meeting
Oggi è mercoledì l’undici dicembre 2013
RPC RD_FASE2 assegnazioni
ONEDATA - distributed data caching -
Il trigger per muoni dell’esperimento CMS
CMS – Richieste finanziarie – 22 giugno 2004
Oggi è lunedì il nove dicembre 2013
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Transcript della presentazione:

CSN giugno Comunicazioni Riunione R-ECFA ai LNF 21&22 maggio; buona impressione data dallEnte. Follow-up? Giornata PT ai LNGS 3&4 giugno; presentazione CSN1 nella ns area web; fatto il punto per ASSIA e PAX. In futuro piu discussione scientifica Workshop HIF Biodola 5-7 giugno: grande successo, alto livello, discussioni molto interessanti. Nel sito web ( ) ci sono tutte le presentazioni ed i video. Follow-up ? FAI 2004: inviato raccomandazioni CSN1; le richieste devono farle, come al solito, i Direttori. Verificate per favore che tutto fili liscio….. Referee: Roberto Calabrese chiede sostituzione; chiesto a Nanni Darbo Nuovo responsabile nazionale ATLAS: Sergio Patricelli --> Luciano Mandelli

Nuovi coordinatori: Roma3: da fine giugno Paolo Branchini Pavia : da giugno Roberto Ferrari Ferrara: da luglio Concezio Bozzi tantissimi ringraziamenti a Enrico, Valerio e Mauro per il lavoro a supporto dell INFN !! Riunione di settembre: ISCRIVETEVI E FATE ISCRIVERE !

MAGNET 1) Module CB+1 (March) 2) Module CB+2 (May) DT 1) 9 DT assembled and tested at Legnaro by June 2) All tools needed for the production of MB4 ready in Torino by March. 3) Start-up of the MB4 production line in Torino by June. RPC 1) Test facility operational in Pavia (January). 2) Final results at the GIF facility (March) 3) Functional test of a prototype module for HV/LV (radiation and magnetic field) (April) ECAL 1)* Quality control on 4400 by June. 2)* Assembly and Test of modules 11 by June. 3) Pre-production of the cooling bars for 9 supermodules (June). 4) Setting-up of the validation test for the Mother Boards (June). 5)Production of a pre-series of 240 Mother Boards and start-up of the final production(June). *subject to availability of material TRACKER 1) Production of 1500 modules by June at a rate of 250 modules per month; 2) Production and test of 2000 optohybrids by June 3) TIB mechanical structures ready (June) 4) Complete integration of Layer #3 (May) 5) Complete integration of Layer # 1 (June) COMPUTING 1) Participation of at least three sites to DC04 [March] 2) Integration of the computing cluste of CMS Italy in LCG [June]