Test-beam X5/H Workshop a dicembre su organizzazione attivita 2003 Mail generale inviata a tutti da F.Cerutti Date del workshop (definitive) Venerdi 6 dicembre 14: :00 ySabato 7 dicembre 9: :30 14: :00 y Domenica 8 dicembre 9: :30 14: :00
Agenda preliminare workshop 6 dicembre 14: :30 Results from 2002 X5 run: MDT, RPC, TGC, CSC 16: :00 Results on H8, GEANT4 simulation 7 dicembre 9: :30 Results on Barrel and EC Alignment 10: :30 Trigger chambers integration, Discussions 14: :30 Trigger chambers (continued), Alignment test, MDT Elect. 16: :00 DAQ, Services (Gas systems, HV, LV) 18: :00 MDT, CSC, RPC and TGC plans 8 dicembre 9: :30 DAQ and Services (continued), Software issues 10: :30 Discussion, Conclusions
Preparazione al workshop(F.Cerutti) 7 Novembre 16:00: First "General telephone conference" : General discussion on all relevant arguments (trigger, elex, DAQ, services). 14 Novembre 8:30: Telephone conference on "Trigger chamber" integration (RPC/TGC). Requested representatives of trigger community, DAQ, H8 Barrel MDTs. 21 November 16:00: Telephone conference on "NEW MDT electronics" integration. Requested the participation of electronics experts,DAQ experts and H8 MDT institutes. 28 November 16:00: Second "General telephone conference" on December ws preparation: final discussion on contributions to the ws and preliminary discussion on cost and responsibility sharing.
Schedula X5/H (ancora preliminare)
Programma X5 6 settimane (di cui 2 main users) per misurare le efficienze camere con i muoni +sorgente ed fare confronti con il sistema di ricircolo del gas che sara pronto a febbraio (richiesta A.Sharma) 1 settimana per studi di LVL1 alla fine (Stefano).Quale Layout?
Programma H8 Fascio disponibile (quasi) sempre 1 settimana run a 25ns (test trigger) Integrazione BML MDT/RPC/TRIGGER yRichieste 2 stazioni BML yQuale lettura? Altre integrazioni yBOL? yBOS?