Scaricare la presentazione
La presentazione è in caricamento. Aspetta per favore
PubblicatoFiorella Contini Modificato 11 anni fa
1
Metrica CSA07 1.Reconstruct events at the Tier-0 at greater than 100 Hz for 30 day a) The target is 24 hr/day, threshold 20 hrs/day 5 days a week Target: 100 Hz ~ 500 MB/s Otput Rate to Castor 2. Transfer data between CERN and the Tier-1 centers at agg. rate of 300MB/s a) Each Tier-1 site should have a successful transfer on 95% of the challenge days b) Each Tier-1 should reach their fraction of 300MB/s on 50% of the challenge days c) The threshold rate is 200MB/s Neil Geddes CSA07 Meeting 1 Nov 2007
2
3. Transfer data from a Tier-1 to any Tier-2 centers with 12 hour bursts between 20- 200MB/s depending on the link a) The threshold is 10MB/s for 12 hour bursts at 75% of the Tier-2 sites > 1 Tier-1 4. Transfer data from Tier-2 to associated Tier-1 at a sustained rate of 10MB/s a). Threshold goal is 50% of the participating Tier-2 centers 45 Active T2 sites during CSA07 As of last week (DDT) 31 sites have commissioned uplinks 30 sites have commissioned downlinks 12 sites have no commissioned links T2 sites transferring >430GB from a T1 in a day = 12 for production data (27%) BUT 36 for debug (80%) Number of T2 sites doing this from more than 1 T1 = 4 for production data (9%) BUT 26 for debug =(62%) T2 sites transferring >430GB to a T1 in a day = 0 for production data (no data to transfer) 29 sites (64%) for debug data
3
5. Demonstrate the execution of skimming and reprocessing jobs at Tier-1 centers a). Target from the computing model is 25k jobs/day. Threshold goal is 10k jobs/day 6. Demonstrate analysis processing at Tier-2 centers driven by user submissions a).The target is 75k jobs per day. The threshold goal is 50k 7.Simulate 50M events per month using the Tier-2 centers a). Threshold goal is 30M events per month Legnaro e tra i 36 siti sopra soglia in download in modalita Debug e tra i 29 siti sopra soglia in upload in modalita Debug In modalita Production non sono stati ricevuti files dalla CSA07 e sono stati inviati dati MC sotto il valore di soglia.
4
La CSA07 prevede il processamento di due gruppi di dataset 1)CSA07 Cocktail ~ 100 M di eventi di fondiCocktail Min bias (20 Mevt) QCD jets (25 Mevt) photon+jets (5 Mevt) Drell-Yan and Onia (10 Mevt) Electrons/muons enrich. (mostly from b-decays) (20 Mevt) W/Z (plus jets) (20 Mevt) Top (1 Mevt) 2) CSA07 Signal ~ 100 M di eventi di segnali e fondiSignal H->ZZ, H->WW, qqH, VVH, H->2 SUSY, Z, altri EWK Ogni gruppo verrà suddiviso in 7 Primary Dataset (raggruppamenti di stream HLT): Electron, Muon, Tau, bJet, JetMET, Photon, JetMETCa Stato CSA07 Ezio Torassa Padova 1/10/07
5
Stato CSA07 Ilaria Segoni EWK meeting 6/11/07 –CSA07 Cocktail Preparation of three soups:Cocktail - ALPGEN Chowder To Be Re-done - PYTHIA with Filters Stew Done - PYTHIA without Filters Gumbo To be done –Dividsion of each samples in 6+1 Primary Datasets based on HLT: Electron, Muon, JetMET, BJet, Tau, Gamma, AllEvent done for available soups (Chowder & Stew) ALPGEN Chowder (La zuppa di pesce) –ttbar+Jets (up to –W+Jets (up to 5 Jets) –Z/ *+Jets (up to 5 Jets) The Status: –The AllEvent PD was RECOed and Skimmed, but the RECO step included the HCAL bug it will be re-done (note that due to computing problems it would have had to be re-done anyways) /CSA07Muon/CMSSW_1_6_4-CSA07-Tier0-A2-Chowder/RECO /Wmunu/CMSSW_1_6_7-CSA07-1192835438/RECO …………… /Zmumu/CMSSW_1_6_7-CSA07-1192835913/RECO
6
PYTHIA with Filters Stew (lo stufato) The Samples: –BbartoJpsi –BtoJpsi –bbe_Pt_170_up, bbe_Pt_50_170, bbe_Pt_5_50 –QCD_Pt_0_15 –Charmonium_Pt_20_inf, Charmonium_Pt_0_20 –Bottomonium_Pt_20_inf, Bottomonium_Pt_0_20 –Electron_ppEleX –Muon_ppMuX The Status: –Split in 6+1 Primary Datasets: Done –RECO (with CMSSW_167, HCAL BUG fixed release): Ongoing –Skimming: Starting /CSA07Muon/CMSSW_1_6_7-CSA07-Tier0-A2-Stew/RECO
7
PYTHIA without Filters Gumbo (la zuppa densa) The Samples: –QCD di-jets (Pt_hat >15 GeV) –MinBias –Gamma+Jets –DY (ee,, ), only 10GeV <M_ll <40GeV bin (M_ll already included form Alpgen Z/ *+Jets) The Status: to be done CSA07 SignalSignal The Status: GEN-SIM: Started in September (almost done for Pythia, started last week for Alpgen as a new release, 149, was needed to include all new phase space grids and input files) DIGI & DIGI To Raw HLT RECO Ongoing for samples already GEN-SIMed
8
Mh=120 No GEN-SIM-DIGI-RAW-HLT-RECO /H130_WW_2l/CMSSW_1_6_7-CSA07-1194126306/RECO - cmssrm.fnal.gov dpm01.ifca.es - srm.grid.sinica.edu.tw /H140_WW_2l/CMSSW_1_6_7-CSA07-1192835331/RECO ccsrm.in2p3.fr - dpm01.ifca.es 80% - /H150_WW_2l/CMSSW_1_6_7-CSA07-1194126384/RECO - cmssrm.fnal.gov dpm01.ifca.es - srm.grid.sinica.edu.tw /H160_WW_2l/CMSSW_1_6_7-CSA07-1192836764/RECO 80% 80% 80% srm.cern.ch - /H165_WW_2l/CMSSW_1_6_7-CSA07-1194126460/RECO ccsrm.in2p3.fr cmssrm.fnal.gov dpm01.ifca.es srm.cern.ch - /H170_WW_2l/CMSSW_1_6_7-CSA07-1194126536/RECO - cmssrm.fnal.gov dpm01.ifca.es - srm.grid.sinica.edu.tw Mh=180 No GEN-SIM-DIGI-RAW-HLT-RECO /H190_WW_2l/CMSSW_1_6_7-CSA07-1194126661/RECO -cmssrm.fnal.gov dpm01.ifca.es - srm.grid.sinica.edu.tw /H200_WW_2l/CMSSW_1_6_7-CSA07-1192835385/RECO ccsrm.in2p3.fr - dpm01.ifca.es 5% - DBS2 12/11/07 ore 11
9
Request 15801 (12/11/07 ore 10:44) /CSA07Muon/CMSSW_1_6_7-CSA07-Stew-P1-PDMuon-Skims0-wToMuNu_Filter/USER Creato da: Sridhara Dasu Sottoscritto da: Ezio Torassa Files: 103 Bytes: 97.6 GB Request 15802 (12/11/07 ore 10:56) /CSA07Muon/CMSSW_1_6_7-CSA07-Stew-P1-PDMuon-Skims0-zToMuMu/USER Creato da: Nicola De Filippis Sottoscritto da: Ezio Torassa Files: 540 Bytes: 691.5 GB Stato CNAF (da Daniele Bonaccorsi, 12/11/07 ore 10:55): Ci sono dei problemi strutturali su Castor che al momento bloccano interamente le attivita' (e non hanno certo facilitato le operazioni in CSA07). Ne stiamo discutendo ora con i responsabili storage. Stato Legnaro: Sottoscritti i primi due skim elencati di seguito. I dati sono attualmente a PIC ed il link verso tale Tier-1 per Legnaro non e attivo, servira un trasferimento ponte.
10
Ian Fisk CSA07 meeting 8/11/07 La CSA07 si considera conclusa Martedí 6 Novembre. La conclusione si riferisce allo studio della metrica, i processi previsti (skim, trasferimenti ai Tier-2, analisi dei dati) continueranno fuori dalla CSA07
11
Stato Analysis Notes Presentazioni di E. Di Marco e J. Alcaraz ai Physics Days 25 Ottobre
12
Sections Editors The CMS Detector Yves Sirois Monte Carlo Datasets G. Gomez-Ceballos, F. Stoeckli Trigger Selection and Event Skimming E. Torassa Reconstruction and Selection of Isolated Leptons E. Di Marco, E. Delmeire Central Jet Veto and Missing Transverse Energy J. Weng Event Selection and Kinematics F. Stoeckli, C. Rovelli Control of Background Rates From Data Systematics Mass Hypothesis Dependent Analysis using Sequential Cuts F. Stoeckli, P. Govoni, C. Rovelli Analysis Using Multivariate Techniques G. Gomez-Ceballos
17
Primo Draft 18 Ottobre Aggiornamenti 20 Novembre (presentazioni o pre-approval) Approvazione finale 10-14 Dicembre (CMS week) oppure 22-24 Gennaio (Physics Days) Deadlines Analysis Notes
Presentazioni simili
© 2024 SlidePlayer.it Inc.
All rights reserved.