Il database dei timesheets integrati Sabina Pellizzoni INFN – Servizio Fondi Esterni.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

Pratiche edilizie on-line
Unità Progettazione e rendicontazione progetti di ricerca
V.I.D.E.O. Video-CV to Increase and Develop Employment Opportunities
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Rendicontazione del 7° PQ delle Università al Full Cost
Queuing or Waiting Line Models
11 1 Roma, 11 dicembre 2006 Laura Gasparini Garanzia su Portafogli Estero.
OpenAIRE: aggiornamenti sul progetto. OpenAIRE – alcuni dati OpenAIRE = Open Access Infrastructure for Research in Europe Programma: FP7 – Research Infrastructures.
Accesso a DynaMed su iPhone, iPod touch e iPad Tutorial
Lo Shop di MLOL e il prestito digitale
Il processo di sviluppo del Sw: strategia make
Fondo di Ateneo per la Ricerca FAR 2010 La Valutazione Tempistica: Dal 1 ottobre 2010 sarà possibile iniziare le operazioni di valutazione Entro il 29.
Palermo, 14 giugno 2011 Barbara Rebecchi, Università di Modena e Reggio Emilia SIMOR Sistema Informatico per il MOnitoraggio, la gestione e il controllo.
Come nella stampa tradizionale, un giornale online può essere di informazione informazione o un periodico dedicato a una disciplina specifica.
Project Review Novembrer 17th, Project Review Agenda: Project goals User stories – use cases – scenarios Project plan summary Status as of November.
Bologna, 28 gennaio 2012 Fondi europei, politica di coesione e nuova programmazione il sito Europafacile
ERGON WEB INFOPOINT Nuovo Sistema Rilevazione Presenze
EMPOWERMENT OF VULNERABLE PEOPLE An integrated project.
Milano, Marzo 2014 Corso di Europrogettazione HORIZON 2020: Struttura della Proposta Lauro Pollachini – FSP.
Registrazione alle istanze on-line
OpenProj: una valida alternativa a MS Project
Giovanni Biondi ICT e trasformazione della Scuola.
Servizio Supporto alla Ricerca e al Trasferimento Tecnologico “Bando regionale per progetti di ricerca in materia di Scienze umane e sociali per l’anno.
1/21 CALL FOR PROPOSALS 2015 FINANCIAL GUIDELINES FOR APPLICANTS Seminario Formativo COSTRUIRE LA RETE CISL PER UNA PROGETTAZIONE EUROPEA EFFICACE ANALISI.
PINK FLOYD DOGS You gotta be crazy, you gotta have a real need. You gotta sleep on your toes. And when you're on the street. You gotta be able to pick.
4/20/20151 Metodi formali dello sviluppo software a.a.2013/2014 Prof. Anna Labella.
Love, Love, Love. Love, Love, Love. Love, Love, Love. There's nothing you can do that can't be done. Nothing you can sing that can't be sung. Nothing.
By The Beatles. Yesterday, all my troubles seemed so far away, Now it looks as though they're here to stay, Oh I believe in yesterday. Suddenly, I'm not.
Taccani1 7.4 Identification ANALISI DEI PERICOLI Hazard Analysis Identificazione Valutazione Misure di Controllo Control Measures Assessment.
Successione degli Stati nei trattati Successione di Stati = mutamento di sovranità territoriale. Conseguenze di tale mutamento sui diritti ed obblighi.
MyEconLab_Univerità degli studi di Milano, corso Prof.ssa Valentina Raimondi How to Access MyEconLab 1.
Azione esterna dell’Unione europea – Come rafforzare il ruolo dell’Europa Elisabetta Capannelli, Commissione Europea
SUMMARY Time domain and frequency domain RIEPILOGO Dominio del tempo e della frequenza RIEPILOGO Dominio del tempo e della frequenza.
Each student will be able to ask an adult or stranger: What do you like to do? and What don’t you like to …?
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
Secondo Circolo di Carmagnola I FRONTESPIZI DEGLI INVITI ALLE SERATE COMENIUS Invitations to the Comenius Evenings 9 febbraio febbraio giugno.
From this year, by kind permission of Taeco S.r.l., the Working Retrievers Club Italia has the pleasure to award the prize “Big Hunter Project”. This.
MyEconLab_Univerità degli studi di Milano, corso Prof.ssa Valentina Raimondi How to Access MyEconLab 1.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
SUMMARY High efficiency motors RIEPILOGO Motori ad alta efficienza RIEPILOGO Motori ad alta efficienza.
Le nuove regole di HORIZON 2020
Geothermal energy Geothermal energy is a renewable energy and can be obtained by tapping into The heat of the earth's hydrothermal sites. The water that.
Alessandra De Cugis Progetto Tempi e Orari del Comune di Milano Time in the cities, a holistic approach for urban time issues, the case of Milan Paper.
Relative pronouns Forms and uses. Relative pronouns Uses and functions of the relative CHI Translates he who, she who, those who, everybody who Does not.
Project Review Novembrer 17th, Project Review Agenda: Project goals User stories – use cases – scenarios Project plan summary Status as of November.
Che ora è? Che ore sono? Telling time. Fate Adesso: If you were to stop someone on the street to ask the time how would you get their attention? If you.
I FINANZIAMENTI EUROPEI 24/11/2015 Pisa – Italy.  Horizon2020 “Progetti di Ricerca”  LIFE+ “Progetti Dimostrativi”  Fast Track to Innovation in H2020.
Simple Sentences in Italian
40 years of the Italian JPO Programme: an overview 14 dicembre Camera dei deputati - Roma Giovani italiani nelle Nazioni Unite: una storia lunga.
ENergy Auditor Competences Training and profiles Corso di formazione per auditor energetico nel settore residenziale MODULO ISCRIZIONE Nome e Cognome _________________________________.
L’ottenimento del Grant: gestione I Michela Giovagnoli INFN – Servizio Fondi esterni Roma e Roma 3 _________________________________________________________________.
A.S Digiaro Antonio Classe 3°A I.T.E. Tutor aziendale: Adriano Fortinelli Tutor scolastico: Angela Ferrari.
Buon giorno, ragazzi oggi è il quattro aprile duemilasedici.
Domenica Taruscio Direttore Centro Nazonale Malattie Rare Istituto Superiore di Sanità Roma
Accertamento norme internazionali. Una delle tre funzioni essenziali sistemi giuridici Nessuna autorità sovraordinata In linea di principio, ciascun soggetto.
PROGETTO COMENIUS Partenariato Scolastico Multilaterale Anno 2012/2013 CIRCOLO DIDATTICO S.G. BOSCO- BIANCAVILLA- CT.
A.A CORSO INTEGRATO DI INFORMATICA E BIOINFORMATICA per il CLT in BIOLOGIA MOLECOLARE Scuola di Scienze, Università di Padova Docenti: Proff.
ORGANISATION OF THE EDUCATION SYSTEM IN ITALY 2010/2011.
Activity diagrams Data & Control Flows Esempi
SUMMARY Checking RIEPILOGO Verifiche RIEPILOGO Verifiche.
Gestione del bilancio CSN4 per futuri preventivi Antonello Paoletti Servizio coordinamento banche dati ricerca INFN Frascati Firenze, 27 Marzo 2008.
T HE TRANSLATION OF TOURIST TEXTS 9 th lesson. W HISKY TOURS – LE VIE DEL WHISKY There are many ways to enjoy a dram in Scotland, whether it be in pub.
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
Fonti del diritto internazionale (art. 38 Statuto CIG)
Definizione del piano delle attività di progetto L’esperienza CoBaSys Donata Franzi IMT Alti Studi lucca Università degli Studi di Modena e Reggio Emilia.
Silvia Minardi, Pavia 14 December maps and directions hours.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Statute of the ICJ, Article 38
TITLE [CENTURY GOTHIC, 35] TITLE [CENTURY GOTHIC, 35]
Transcript della presentazione:

Il database dei timesheets integrati Sabina Pellizzoni INFN – Servizio Fondi Esterni

Sommario Il contesto Il database dei timesheets integrato Indicazioni operative Le novità introdotte con Horizon 2020

Contesto Gli enti finanziatori, e in particolar modo la Commissione Europea, richiedono che l’ente beneficiario si doti di un sistema che permetta, nel caso di personale che lavora su più attività e progetti, di rilevare non solo il tempo dedicato al progetto finanziato ma anche alle altre attività che concorrono al monte ore annuo, al fine di evitare sovraesposizione delle ore ed eventuale rischio di double funding, cioè il rischio di finanziare costi per una stessa attività.

Contesto – Indicazioni UE “Only the hours worked on the project can be charged. Working time to be charged must be recorded throughout the duration of the project by timesheets, adequately supported by evidence of their reality and reliability. In the absence of timesheets, the beneficiary must substantiate the cost claimed by reasonable means (alternative evidence) giving an equivalent level of assurance, to be assessed by the auditor”. Fonte: Guide to Financial Issues relating to FP7 Indirect Actions – p.55

Requisiti timesheet – Indicazioni UE 1/4 Il timesheet per rispettare i requisiti previsti dalla base giuridica dell’FP7 deve esporre le seguenti informazioni: full name of beneficiary as indicated in the ECGA; full name and signature of the employee directly contributing to RTD project; title of RTD project as indicated in the ECGA; project account number; periodicity of filling in (for instance on daily, weekly, monthly basis) according to the beneficiary's normal practice; Fonte: Guide to Financial Issues relating to FP7 Indirect Actions – p.56

Requisiti timesheet – Indicazioni UE 2/4 amount of hours claimed on the RTD project. All hours claimed must be able to be verified in a reliable manner; full name and a signature of a supervisor (person in charge of the project); the timesheets must be reconcilable with the absences for holidays, illness, travels or others.

Requisiti timesheet – Indicazioni UE 3/4 Ulteriori requisiti: the time records disclose the hours worked on a daily basis; a reference to the tasks or WP included in the Description of Work, allowing an easy reconciliation of the work done with the work assigned; a reference to the type of activity (RTD, management, other) to which the work has been attributed; a description of the actions carried out by the staff, allowing to understand the work done and substantiate it.

Il timesheet deve rappresentare tutto il tempo dedicato all’attività lavorativa «In cases where personnel work on several projects during the same period the time recording system must enable complete reconciliation of total hours per person, listing all activities (EU projects, internally funded research, administration, absences etc.)» Requisiti timesheet – Indicazioni UE 4/4

Il database dei timesheets integrato INFN Il 30 luglio 2014 con la Disposizione n del Presidente dell’INFN si introduce l’utilizzo del database dei timesheets integrato per il calcolo del tempo produttivo del personale afferente a progetti derivanti da bandi competitivi nazionali ed internazionali, in ottemperanza a quanto richiesto dai regolamenti degli enti finanziatori. Il database dei timesheets è disponibile al seguente link:

Indicazioni operative 1/3 Personale tenuto alla compilazione Principal Investigators Coordinatori scientifici Personale assunto sul Progetto Personale staff INFN del quale si espongono i costi del tempo dedicato al Progetto Personale staff INFN o associato di cui non si espongono i costi del tempo dedicato al Progetto ma che hanno partecipazioni rilevanti nell’ attività di ricerca Metodo di compilazione Nel timesheet dovranno essere indicate, oltre alle ore lavorate per il Progetto nei relativi Work Packages, anche le ore per le attività istituzionali riconducibili al salario ordinario (voce Internal and National Projects) Coloro che registrano le ore lavorate con badge hanno l'onere di accertare che le ore lavorate e registrate corrispondano alle ore indicate nel timesheet tranne nel caso di opportune eccezioni (es. missioni – in cui si inserirà il monte ore giornaliero standard) Sono stati predisposti dei campi per inserire ferie, malattie e altri congedi speciali Firma del timesheet integrato Una volta compilato e validato online il timesheet integrato dovrà essere stampato e firmato in originale dal partecipante al Progetto e controfirmato dal Responsabile Scientifico del Progetto (previa firma del responsabile scientifico locale, o del Direttore della Struttura se il responsabile locale non è definito) e consegnato al Financial Officer del Progetto che provvederà all'archiviazione, dopo averlo siglato Per i dipendenti che utilizzano il badge è richiesto di allegare anche l'estratto mensile delle timbrature

Indicazioni operative 2/3 Il timesheet dovrà essere compilato entro 7 giorni dalla chiusura del mese precedente e validato on-line Il responsabile scientifico locale provvederà a verificarlo e validarlo non oltre il 10° giorno del mese seguente Il responsabile nazionale del progetto dovrà validarlo non oltre il 15° giorno Validato dal responsabile nazionale il timesheet sarà consolidato e immodificabile

Indicazioni operative 3/3 Il Financial Officer e il Responsabile Scientifico dell’esperimento avranno accesso alla visualizzazione completa dei timesheets del progetto per il relativo monitoraggio* Potranno usufruire dei privilegi di inserimento e modifica dei workpackages e delle categorie L’inserimento o la modifica delle afferenze e delle responsabilità del personale sul progetto sono gestite tramite Godiva (dagli incaricati nelle Sezioni a gestire le associazioni) Ogni richiesta gestionale o segnalazione di problemi tecnici riguardante il database dei timesheets deve essere sottoposta attraverso il sistema di ticketing Jira raggiungibile dall’area Supporto del Portale del Servizio Coordinamento Fondi Esterni *L’inserimento delle ore resta in carico a ciascun team member

Il template UE

Il template INFN

La compilazione Lato Utente

La compilazione

La gestione e il monitoraggio Responsabile Scientifico e Financial Officer

Ruoli operativi Responsabile Scientifico (Responsabile Nazionale) Responsabile Locale (Locale) Financial Officer (Finaoff) Supporto al Fo National (National Financial Responsible)

Inserimento / modifica Work packages e categorie

Le categorie di default: possono essere nascoste solo se non sono presenti ore caricate da nessun team member nuove: categorie possono essere aggiunte, rinominate e rimosse Gestisci i WP

Cosa manca? Integrazione col sistema rilevazione presenze Personalizzazione delle anagrafiche sui singoli workpackages Introduzione anagrafica responsabili workpackages

Le novità in H2020 Il personale al 100% sui progetti non dovrà fare i timesheets ma compilare una dichiarazione di commitment congiunta con l’Host Institution per ciascun reporting period del progetto “As an exception, for persons working exclusively on the action, there is no need to keep time records, if the beneficiary signs a declaration confirming that the persons concerned have worked exclusively on the action” Attenzione! Only one declaration per reporting period. Intermittent (i.e. sporadic or random) periods of ‘exclusive’ dedication can NOT be covered by a declaration. If the person worked for the action also after the uninterrupted time-period covered by the declaration, then it must keep time records for that period AGA — Annotated Model Grant Agreement: H2020 General MGA: V1.7 – December 2014 – p.160

Le novità in H2020 Il personale non al 100% dovrà utilizzare il database dei timesheets con le stesse modalità presentate per le azioni del 7PQ “For persons who do NOT work exclusively for the action, the beneficiaries must: − show the actual hours worked, with reliable time records (i.e. timesheets) either on paper or in a computer-based time recording system. Time records must be dated and signed at least monthly by the person working for the action and his/her supervisor.” AGA — Annotated Model Grant Agreement: H2020 General MGA: V1.7 – December 2014 – p.160

Establishing systems from the start: You must keep time records! Regular errors: - Staff working on the project and sick or on holiday at the same time!! -Hours claimed cannot be supported -Impossible number of hours claimed

Establishing systems from the start: Staff working on the project must keep time records (MGA Article 18)! - staff must record the hours they spend on the project - regularly (daily, weekly) - countersigned by a supervisor

Tempo produttivo in H2020 Three options: 1720 hours for persons working full time (or corresponding pro-rata for persons not working full time) (‘1720 fixed hours’) the total number of hours worked by the person in the year for the beneficiary (‘individual annual productive hours’) the ‘standard number of annual hours’ generally applied by the beneficiary for its personnel in accordance with its usual cost accounting practices (‘standard annual productive hours’)

Grazie dell’attenzione INFN – Servizio Coordinamento Fondi esterni