SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March 2008 o SLHC Phase I & II Upgrades Roma, March 16 th, 2008 G. Darbo - INFN / Genova Agenda.

Slides:



Advertisements
Presentazioni simili
P. Capiluppi Organizzazione del Software & Computing CMS Italia I Workshop CMS Italia del Computing & Software Roma Novembre 2001.
Advertisements

Queuing or Waiting Line Models
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Paolo Bagnaia - 10 January invecchiamento. elettronica di read-out; shielding (MDT, RPC, …); HLT + DAQ; _________________________ NB :non include.
LHC-f Referee M.Biasini, P. Checchia 17 Settembre 2009 Riunione CSN1 Risultati 2009 Strategia run / Resistenza radiazione Proposte finanziarie 2010 Milestone.
Costo per l’Upgrade del Tracker di ATLAS G. Darbo - INFN / Genova Roma 1, 10 Gennaio 2006 Costo per l’Upgrade del Tracker di ATLAS G. Darbo - INFN / Genova.
R&D muoni. Stato dell’arte Il gruppo ha appena cominciato il lavoro – Prospettiva: preparazione workshop Definizione temi del workshop Analisi stato dell’arte.
R&D per ATLAS G. Darbo - INFN / Genova Frascati, 24 Novembre 2005 Attivit à Specifica di R&D per il Rivelatore ATLAS G. Darbo - INFN / Genova Talk Overview:
I giorni della settimana
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
1 referee-ATLAS CSN I, Roma 2-3/4/2007 RELAZIONE DEI REFEREE DI ATLAS F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 3 aprile 2007.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Referees LHCB-CSN1 lug/061 LHCB : relazione dei referees Giovanni Batignani Roberto Ferrari Chiara Meroni Rosario Nania.
1 referee-ATLAS CSN I, Roma maggio 2007 RELAZIONE DEI REFEREE DI ATLAS F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 14 maggio 2007.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - 6 luglio TOTEM – luglio 2005 Politecnico di Bari and Sezione.
1 Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - Napoli 23 Settembre Angelo Scribano TOTEM – settembre 2005.
R.N. - Referees LHCB-CSN1 09/021 LHCB : proposte dei referees Giulio D’Agostini Chiara Meroni Rosario Nania.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
WG-SLHC Dove siamo, …. dove e come andiamo? Spunti per una discussione M. de Palma Roma, CSN1 16 Maggio 2006.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
Preparazione RRB Commissione Scientifica Nazionale I 1-2 aprile 2003 S. Patricelli Consuntivo fondi M&O 2002 Divisione tra subdetectors dei fondi extra-CORE.
LHCb – RRB aprile 2006 MoF-A (previsioni 2007) MoF-B Stato finanziario dell’esperimento Stato dei finanziamenti INFN e necessita’ CSN1 – 4 aprile.
F. Marchetto – INFN- Torino GigaTracKer: status report 25 Maggio Update su infra-structures 2. Stato del cooling 3.Bump-bonding e thinning 4. Stato.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
CSN1, 17 settembre 2002 COMPASS prospettive verso la fase 2: tempi ed impegni italiani previsti F. Bradamante attivita’ della collaborazione per la fase.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
15.11,2005 LNFMarcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa ROADMAP B and SUPER B in Italia Gruppo1 LNF 15Novembre, 2005.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
MS - NA62 TDAQ INFN – Settembre 2011 TDAQ in generale Distribuzione clock/trigger: progetto definito, moduli finali in arrivo (?), installazione prevista.
Timing and pixel Diamond Plans for phase I and II
1 CSN1 - Lecce 26/09/2003 TOTEM Relazione e proposte finanziarie Referee: G: Chiefari, M. Curatolo, M. de Palma.
24 Sett. 04Totem -Relazione dei referee1 CSN1 - Assisi 24/09/2004 TOTEM Relazione e proposte finanziarie Referee: G: Chiefari, M. Curatolo, M. de Palma.
Presentazione documenti inviati al RRB e piani futuri Commissione Scientifica Nazionale I 13 ottobre 2003 S. Patricelli Punti principali in discussione.
ATLAS al SLHC ( L=10 35 cm -2 s -1 √s= 14 TeV) Cosa è stato fatto: - Giugno 2004 : creato uno Steering Group “leggero” con il compito di organizzare workshop.
Risorse per Meccanica e Simulazione dell'ITk D. Giugni INFN-MI D. Giugni Risorse per Meccanica e Simulazione dell'ITk
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
P. Morettini 6/7/2015PM - CdS Genova 1. High Luminosity LHC  HL-LHC comincerà la presa dati nel 2025/26, con una luminosità livellata di 5-7 x
ATLAS / CMS Relazione dei referees M.Grassi, S.Miscetti, A.Passeri, D.Pinci, V.Vagnoni.
Referees di ATLAS-CMS: commenti sulle attività di upgrade M.Grassi S.Miscetti A.Passeri D.Pinci V.Vagnoni Sulla base di quanto presentato nell’incontro.
ATLAS Relazione dei referees A. Cardini, M. Grassi, D. Lucchesi, G. Passaleva, A. Passeri.
AIDA Advanced European Infrastructures for Detectors at Accelerators Proposal number CUP codice unico procedimento (richiesto) Budget finanziato.
Call 5: ACTIVE – 3 rd Meeting G. Darbo – INFN / Genova 8 July 2013 o ACTIVE – 3 rd Meeting G. Darbo – INFN / Genova Indico agenda:
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
Riunione CSN1, Roma, Marzo 2009F. Bedeschi, INFN-Pisa ATLAS Relazione referees  Sblocchi SJ  Nuovi Similfellows  Richieste da tasca per SLHC  Milestones.
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
CMS – Relazione dei referee su SLHC G. Bruni, A. Cardini, P. Giannetti, M. Grassi, D. Lucchesi Commissione Scientifica Nazionale I 30 Marzo 2009.
P. Morettini 23/1/2015P. Morettini - R&D Phase II Italia 1.
Upgrades per HL-LHC di ATLAS / CMS Relazione dei referees M.Grassi, S.Miscetti, A.Passeri, D.Pinci, V.Vagnoni.
TOTEM: rapporto dei referee C.Bini, M.Curatolo, P.Paolucci 21 settembre 2007.
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
IBL – Attività e Richieste G. Darbo - INFN / Genova ATLAS Italia - Bologna, 17 June 2009 o IBL – Attività e Richieste CERN, July 7 th, 2009 G. Darbo -
Sommario richieste CSN1 Consiglio di Sezione 28/06/2013 Attilio Andreazza.
Compositi per ATLAS Overview del processo per la costruzione supporti per ATLAS Tempistica.
WRITING – EXERCISE TYPES
G.Alimonti INFN, Milano 12 Gennaio 2011
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
RD_FASE2: Mechanics and Cooling Pixel R&D Projects Meeting Milano, 8 giugno 2015 Simone Coelli, Andrea Capsoni, Carlo Gesmundo, Mauro Monti, Ennio Viscione.
SLHC Phase I & II Upgrades
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Transcript della presentazione:

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March 2008 o SLHC Phase I & II Upgrades Roma, March 16 th, 2008 G. Darbo - INFN / Genova Agenda Page:

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March ATLAS Upgrade Week - Highlights AUW – 23-27/2/2009 –– Indico agenda: Some statistics: 29 Sessions ~232 Talks ~232 People? AUW themes: Moving from R&D based towards a systematic project Phase II LoI Layout Task Force Joint TDAQ/Systems effort kick-off IBL TDR - Begin 2010 AUW News – Phase I delayed by one year: 2013  2014 M. Nessi reported L. Evans words. Next AUW 2009 – CERN 26-30/10/ – two AUW (proposed end of September in Prague)

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March LHC: Luminosity Plot L= 3 x cm -2 s Shifted by one year Ref. F. Zimmermann - AUW SLHC Phase I delayed by one year 2014 Ref.: M. Nessi (AUW) from L. Evans SLHC I New Triplet IBL Installed SLHC I New Triplet IBL Installed SLHC II New injectors + IR upgrade SLHC II New injectors + IR upgrade Luminosity Plot Ref. R. Garoby – LHCC 1/7/2008 –– Peak Luminosity Plot – Before LHC Accident

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March SLHC

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March R&D  Systems November Total of 34 proposals or expression-of- interest submitted since ~210 Institutes participating (multiple times), 7% of INFN Two new EoIs: TDAQ upgrade (Norman Gee) – see mail archive ( LV1 track trigger (Richard Brenner) – see: R&Ds working groups as backbone of LoI mapped into LoI sections.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Inner Tracker R&D Status – November 2008 Approved by Executive Board EoI, Proposal presented to USG Pixel Strips Inner Detector

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Calorimeter, Muon & Other R&D Status – November 2008 Approved by Executive Board EoI, Proposal presented to USG Calorimeter Muon Trigger, Elec, …

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March LoI – Time Line Immediate Needs: - Propose LoI outline – going through today to get first feedback - Set up an editorial board - 2 main editors - Review working groups, overall (sub-)systems contacts – appoint chapter editors - Include the current R&D projects in working groups as appropriate - Spot critical issues Ref. M. Capeans – Upgrade PO & SG -3/3/2009

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March LoI Structure Intro & Overview Sub- systems Performance Installation Responsibilities Ref. M. Capeans Upgrade PO & SG -3/3/2009 Ref. M. Capeans Upgrade PO & SG -3/3/2009

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Layout Task Force 3 ID strawman layouts for SLHC have been studied so far (2006, 2007, 2008) Limitations have shown-up at <<400 pile-up events A LoI for SLHC is due early 2010, we therefore must converge on a defendable ID layout by then. Current ID performance Task Force: Chaired by: Leonardo Rossi Report in 6 months First ideas and strategy at AUW Ref. L. Rossi - AUW

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Single Muon Triggers ATLAS Ref.: T. Kawamoto Muon Week - 28/10/2008 No control of rate for p T >20 GeV/c Physics rates still OK pT>20 GeV/C CMS : L3 - ATLAS : EF Use track trigger? CMS going this way, ATLAS is still studying a solut6ion.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March TDAQ & LV1 SLHC Phase I Several detectors have limited event volume; L1A rate at 3 x will be limited to 50-60kHz at 100% traffic levels Some detector inefficiencies as latency approaches 2.5 µs SLHC Phase II Several detectors can use fast clear or trigger directly from level 1.5 For most, 6.4 µs latency is fine. Exception is muon 3.2 µs Options to improve muon trigger rates by adding chambers Write R&D proposal for TDAQ upgrade work Define document structure, appoint chapter editors,… Covering Phase-I and Phase-II, plus evolution Level-1 Trigger Phase I topological upgrade – (Still need to prove that this is useful…) Phase II – Track Trigger: both simulation and hardware studies underway  progress at the AUW  need lot of efforts for answers to LoI Ref. N. Gee – AUW & R. Brenner ATUW (Nikhef)

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Sestri Levante Incontro a Sestri Levante: Locazione decentrata Alitalia e blocco per incidente dell’autostrada la hanno resa più remota Ma la tranquillità del luogo ha permesso una maggior concentrazionesui temi in discussione. 50 partecipanti: ATLAS, CMS, CSN1 (Nando + referee), Umberto e Sergio sono intervenuti in remoto (la GE li ha trattenuti a Roma). Sito WEB:

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Sestri Levante - Participants See report to CSN1

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Outcome: ATLAS, CMS & INFN Upgrade degli Esperimenti Per entrambi gli esperimenti la sfida sono l’ottenimento di prestazioni “simil LHC”: Prestazioni del tracker interno e L1 trigger sono la difficoltà maggiore. Il management INFN ha preso atto dell’esistenza di una importante comunità Italiana che guarda al futuro di LHC (SLHC) ATLAS e Phase I ATLAS: B-Layer – “Impossibile” sostituirlo -> IBL CMS: Il rivelatore a Pixel ha meno “vincoli” -> varie opzioni possibili R&D per SLHC In futuro gli R&D in cui il CERN si impegnerà dovranno essere finalizzati alle necessità degli esperimenti che per gli upgrade. Nell’INFN gli R&D devono essere “strategici” per la partecipazione delle comunità negli upgrade degli esperimenti. Partecipazione a SLHC di entrambi ATLAS e CMS, ma concentrazione delle attività per mantenere visibilità. La CSN1 ha una tasca per il 2009… ai referee il giudizio sulle attività…

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March IBL Organization, INFN interests, money. IBLIBL

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March IBL Organization Project Leader (IBL-PL) endorsed by ATLAS CB Technical Coordinator (IBL-TC): H. Pernegger Organization structure in preparation: Project is an ATLAS Upgrade for Phase I Thinking at working groups (WG), technical board (TB), steering group – covering all project (Pixel CORE and TC) Report line to Pixel Institute Board (PIB) and Upgrade Project Office (PO) TDR – Early editors (one senior) with overall knowledge of the Pixel detector and involved/interested in the IBL project. Try to reduce options for TDR: Cooling (CO2 – C3F8): 2 kW CO2 cooling plant to gain experience set up at CERN Sensors: reduce options, define requirements and specifications.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March INFN Possible Interests - I FE-I4 New front-end chip. 50x250µm2 pixels, 26.9k pixels, 160 Mb/s R/O. 5 labs: Bonn, CPPM, Genova, LBNL, Nikhef Sensors 3D & Planar (n-in-n) sensors are the options: 3D more charge after life dose (>3x1015 n/cm2) but scale production needs demonstration. Planar known technology but high Vbias (>800÷1000V) is a system issue. Genova (with IRST in 3D) & Udine (3D & Planar) in ATLAS. IRST-FBK, TN & TS in IGRV (3D sensors) Stave mechanics Low density carbon foam structure with titanium or carbon fiber (CF) pipe option. CF pipe advantages: low X0, thermal matching with carbon foam support, non corrosion issues. Good progress in CF pipes: tested at 150 atm, no leakage (<10 -7 atmcc/s). New technology: need qualification for micro-crack development, develop fittings, find second source for production Milano actively involved in the pipe R&D and in the stave design.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March INFN Possible Interests - II Stave Flex Hybrid Genova interested in the development of the “Stave” Flex Hybrid. Nice complement of the stave design in Milano to which the component is tightly connected. Module/Stave Loading & QC Genova interested in a role (to be better defined) in the module testing/stave loading & qualification process. PP2 Milano interested in the PP2 deliverable. They will provide it, if design need minimum changes (no redesign of the board). Other deliverables / activities Under investigation possible contribution on other parts: ROD? Existing ROD could be used with DSP code rewriting and FPGA reprogramming, but new design could bridge to SLHC design & improve architecture (slow VME bus access, more memory). Bologna considering ROD deliverable, Italian leading role in Pixel DAQ could play a role. Opto-link: opto-chip design if a redesign is needed? Milano may contribute.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March IBL – Costi e Finanziamenti Costo e finanziamento del progetto in via di definizione Il costo del progetto in via di definizione. Presentato all’RRB un piano per 4.4MCH nei MOF-B (2009÷2012) che copre il costo “Pixel CORE”. Altri finanziamenti tramite nuovi laboratori e MOF-A (Installazione. Cooling plant, new beam-pipe) coprono il rimanente 50%. L’INFN è supposto contribuire in modo diretto per il 25% dei 4.4 MCH dei MOF-B e indiretto tramite I MOF-A. MOF-B del Sono disponibili 134 k€ (201 kCH) di sj. Opportuno avere una definizione del progetto (interim MoU) prima di sbloccare la somma. Responsabilità italiane e del resto della collaborazione in via di definizione.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Richieste IBL R&D Genova: 80 k€: recupero assegnazione 2008 andata in residuo (quota FE-I4 + contributo 10 k€: deposizione bumps (4 wafers sensori) e flip-chip (~40 single chip devices) Milano (vedi presentazione Danilo): 5 k€: una mini serie di tubi in CF (prototipi già realizzati) per testarne l'affidabilità sotto i vari aspetti: resistenza alla pressione, resistenza alla radiazione, misure di coefficienti termici, etc 10 k€: prototipo di stave completo da caratterizzare sotto vari aspetti e confrontare con le simulazioni realizzate dall’officina meccanica. 20 k€: per sviluppare i fitting in fibra di carbonio tra lo stave e il circuito di cooling fino a PP1, che funzionino ad alta pressione Udine (vedi presentazione Mario Paolo): 10 k€: sviluppo e test sensori Missioni: MI 1k€, ME 4mu.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Richieste IBL – Sommario 03/09 Sommario richieste Pixel IBL and SLHC R&D e IBL prototipaggio / costruzione.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Richieste IBL: Settembre ‘08 Corretta Sono 134 k€ sj Anticipi GE 80 k€

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March R&D SLHC Richieste finanziarie. Vedi presentazioni separate.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Richieste R&D: LAr (FE Elec) Interesse manifestato per sviluppo d’elettronica di front-end per calorimetria (nel 2007 e 2008 CSN1, Sestri Levante): Vedi presentazione Mauro di oggi. Richieste finanziarie per sviluppo elettronica di front-end per calorimetri (Milano): 1. Realizzazione di una piccola facility di test per la caratterizzazione delle diverse tecnologie (Progettazione e realizzazione di PCB, Componentistica varia, Schede di interfaccia/acquisizione/memorizzazione): 7 k€ 2. Test con radiazioni (Protoni al TSL di Uppsala (~ 2x10 14 p/cm 2 ), Tempo fascio, 11x800 €/ora + set-up dedicato): 11 k€ 3. Partecipazione ad una nuova sottomissione di un test chip (Insieme con le altre istituzioni, lo schema temporale dipende dai risultati sul primo test chip IBM. Possibile nuova sottomissione fine 2009, inizio 2010): 15 k€.

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Altre Richieste: … Ricevuto solo possibile richiesta di 2 k€ per micromega. Altro? discussione

SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March Richieste SLHC – 09/08 e 03/09 Richieste Settembre 2008 Richieste Marzo 2009 (Sblocchi)