F.Forti: Italian Groups

Slides:



Advertisements
Presentazioni simili
Cache Memory Prof. G. Nicosia University of Catania
Advertisements

V.I.D.E.O. Video-CV to Increase and Develop Employment Opportunities
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
5-6 novembre 2002Riccardo de Asmundis - Riunione Roma II 1 Infrastrutture e monitoraggio ad X5 Descrizione delle installazioni e del sistema di monitoraggio.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Motor Sizing.
Stato dei sistemi di High Voltage Low Voltage Detector Control system.
Paolo Bagnaia - 10 January invecchiamento. elettronica di read-out; shielding (MDT, RPC, …); HLT + DAQ; _________________________ NB :non include.
Ottimizzazione del tempo morto
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
SOTTOSISTEMA DI MEMORIA
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
Nicolo` Cartiglia Stato dell'elettronica di ECAL - La situazione e' in continua evoluzione. Entro l'estate si formalizzera` la decisione su quale elettronica.
Sezione di Torino D. Panzieri - CSN1 Trieste 18/09/061 Attività in corso a Torino  Commisioning e running del RW  Commisioning e running elettronica.
MUG-TEST A. Baldini 29 gennaio 2002
SUMMARY Dinamic analysis RIEPILOGO Analisi dinamica RIEPILOGO Analisi dinamica.
15.11,2005 LNFMarcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa ROADMAP B and SUPER B in Italia Gruppo1 LNF 15Novembre, 2005.
Filtri del secondo ordine e diagrammi di Bode
 SLP Tests in VME test stand: Saverio – Pierluigi (Daniel)  New test stand: Enrico (Saverio – Pierluigi)  VME Tests versus new test stand tests (Enrico-Saverio-Pierluigi)
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
RPC R&D ATLAS-CMS WG4 D. Piccolo, B. Liberti per il WG4 1.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
Architettura Energy (sviluppo del nodo)
SUMMARY Checking RIEPILOGO Verifiche RIEPILOGO Verifiche.
TGC upgrade for SLHC (ATL-P-MN-0028 ) Fra le parti più colpite dall’aumento di rate previsto a SLHC ci sono le Small Wheels Le TGC con catodo a bassa resistività.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
STMan Advanced Graphics Controller. What is STMan  STMan is an advanced graphic controller for Etere automation  STMan is able to control multiple graphics.
MASSIMO BENETTONI STEFANO LACAPRARA MARIO POSOCCO PAOLO SARTORI ROBERTO STROILI EZIO TORASSA N.N. 17th B2GM 2014/02/06 1 iTOP activities in Padova.
Antonio CaponeKm3 - incontro con referees INFN presentazione richieste Composizione del Gruppo Km3 nel 2014.
10 Mev e S(e)-S(mu) = % DS(mu)/S(mu) = 5-70 % Streamer.
Sommario richieste CSN1 Consiglio di Sezione 28/06/2013 Attilio Andreazza.
Dopo una prima fase di studi preliminari, ho scelto di operare alle seguenti condizioni: ● HV = -980V ● hold1_delay = 10 ns ● C_feedback = 900 fC (non.
ATLAS RM3 Preventivi 2016 FTE: Fisici 10.5  9.8, Tecnologi: 1.2  1, Tot 11.7  10.8 METABOLISMO: 11.7 Mesi Uomo Estero keuro  10.8 MU
Do You Want To Pass Actual Exam in 1 st Attempt?.
Michele Iacovacci (Napoli),
L. Rossi – Bologna – ATLAS Italia
Raffaele Giordano for the uSOP Team
Ciro Esposito - Area Networking
Roberto Calabrese Università e INFN - Ferrara
MPGD_NEXT Miscellanea: MILESTONES 2016 & 2017 SBLOCCO S.J.
C.Bini, P.Paolucci, A.Tricomi 18/09/2008
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Richieste 2017 HMPID e LHC_IF
The FOOT Calorimeter No TOF, high density and good energy resolution -> BGO TOF asks for 1.2 m lever arm -> R = 20 cm with 100 angular aperture of the.
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
Stato Elettronica e Misure su SiPM Napoli
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Humidity and Temperature Control
Programma di attività e preventivo di spesa 2013
JetWalk: Agenda e review committee
Waveform Digitizer Review
Digitizer ReAdout Controller Dirac
relazione referee settembre 2009 p. branchini, s.ragazzi, m.sozzi
Gigi Cosentino - LNL 20 ottobre 2016
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Programma di attività e preventivo di spesa 2013
PROBLEMA: Lo slow shaper, o comunque qualcosa tra preamplificatore e ADC, mostra un guadagno almeno dieci volte inferiore a quello dichiarato per MAROC3.
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
Il trigger per muoni dell’esperimento CMS
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
Digitizer ReAdout Controller - DIRAC Status report
CdS 2017: embargo fino a TAUP2017
A comparison between day and night cosmic muons flux
Transcript della presentazione:

F.Forti: Italian Groups Geography TOP SVD ECL Groups (INFN+University) Torino Padova Trieste TIFPA Pisa Perugia Laboratori Nazionali di Frascati Roma 3 Enea Casaccia/Roma 1 Napoli COMP http://goo.gl/ZjVJO 4/7/2013 F.Forti: Italian Groups

Gli afferenti @RomaTre (2016) P. Branchini 0.5 A. Baroncelli 0.3 E. Bernieri 0.5 A. Budano 0.5 M. Ciuchini 0.2 E. Graziani 0.5 A. Passeri 0.5 S. Bussino 0.3 Totale: 3.3 Very strong support and interest from Electronic (D. Tagnani, F. Budano)

Introduction Beast experiment News from Belle2 (KLM)

Introduction In 2014-2016 we have focused on the possibility to take Part to the EMC forward upgrade. Moreover in 2015-2016 we have Also taken part to the beast phase 1 experiment to measure radiation back ground in the experiment. The R&D on the Forward Calorimeter is over. Several papers concerning test beam are being written. RM3 developped the front-end electronics in this framework and the daq system. Collaboration will take a decision on what to do as soon as we’have final results from beast

Beast phase 1: Crystal box contains: Lyso, CsI CsI (Tl) equipped to monitor T and H Idea: To measure irradiation spectra and rate and correlate it with machine optical function.

Beam blow up evidence in LER:

HER Touscheck study:

Touscheck study

LER Collimation Study

Injection study

New scheme of daq adopted (and made it work)

Why KLM Semileptonic decays are fundamental for B physics. KLM detector detects and tiggers on muons. By the end of 2015 beginning 2016 it was clear KLM fe would not have been ready by the end of 2017. The spokesman asked us (LNF and RM3) if we could take care of this problem. We analyzed the problem and acted.

INFN KLM system review, board production KLM system overview KLM board production in Italy results

The Sytem Front-end Board INFN LNF-RM3 13 RPC Front-End boards connect to a Data Concentrator in the barrel 2 Scintillator Motherboards connect to a Data Concentrator in the barrel 7 Scintillator Motherboards connect to a Data Concentrator in the end-cap The Data Concentrator connects to the detector interface (HSLB, UT3, FTSW)

Data Concentrator Board

Data Concentrator Functions

RPC front-end functions

Custom backplane

RPC Signals

RPC front end board

Test results 2 board were perfect 1 board has a broken multiplexer a broken diode and transformer badly soldered. This board has been reworked and it’s working now.

Board:

What was visible @microscope A rotation occurred when it was soldered

Quotation The 3 boards produced worked fine from the start now we are running a bid to assign the production.

Next STEP on KLM We are building a setup facility@LNF. (We need space) We want to get the production done by the end of march 2017. We want to test all the board in our facility by 30 th june 2017. In this case installation will occur by end of october 2017.

Backup slides

Beast results (vacum scrubbing):

Indiana test setup description External pulser with variable amplitude connects to Z and Phi connectors to pulse every channel while data is analyzed with COPPER readout. Threshold and built-in pulser are manipulated with and data is analyzed with COPPER readout . Configure FPGAs with Data Concentrator. It is a complicated setup and needs a lot of hw

Hw needed for standard test setup Home made Pulser (1 board at the time!! very slow) Copper link and pocket daq 2 optical concentrator (one is needed to Teminate the bus) MANDATORY!

What we have: To setup the very same test bed they have in Indiana we should order 2 VME 64X crate (lots of time and money)

A different strategy: Use ChipScope VIO to assert built-in test pulser channel, monitor associated channel with ChipScope ILA Use ChipScope VIO to program threshold with low threshold, monitor associated channels with ChipScope ILA Configure FPGA with Data Concentrator Benefit: what we have is enough.

And… We developped this strategy when we were in Indiana (thanks Brandon) and made it work…. Moreover we discovered that: We could have been much faster if we could pulse the system one crate at the time (13 boards)…. Therefore we are designing a pulse system we can use in Italy and Japan To drive the RPC single crate and make debugging much faster.

Proposed strategy: Test analog part at the firm level using a scope and the proper hw we are developping. Test the digital part using chipscope at the crate level in italy. Test the board with the pulser in Italy and send everything pulser Included in Japan. Cosmic test in Japan on KLM

Situazione 2016 La commissione 1 ha appena approvato 210 keuro di finanziamento per lo svolgimento delle gare per l’acquisto di FE boards per il KLM. Queste gare dovrebbero avere luogo entro il corrente anno. Per il prossimo anno si prevedono attivita’ di test ed installazione

Richieste 2017 Missioni estere per metabolismo 23 keuro Missioni estere per installazione 27 keuro Missioni per contatti 2 keuro Consumo metabolismo 5 keuro Inventariabile 12 keuro

Architettura proposta Architettura di validazione del sistema EMC in avanti Il sistema costituisce la dorsale DAQ per tutti i test svolti in italia durante la costruzione E’ contemporaneamente uno studio di fattibilità di funzioni di SLOW control con capacita’ di DAQ e TRIGGER integrate. In questo quadro RM3 seguirebbe lo sviluppo del pre-amp e scheda di gestione del very front-end (PTD power threshold digital). Il PTD e’ interfacciato con elettronica di Napoli. uSOP Pre-Amps PTD

Gerarchia di Aggregazione <# Crystal LA APD Preamp PTD uSOP # 72 144 5 1 mod - 2x Crystal 1x LAAPD 1x 32 Pre 1x 5 PTD costo 65€/chan 2k€/board 4k€/board totale 10k€ 4k€ uSOP PTD 32 LA-APD Forward # costo spicchi 16 - Crystal ~1150 LA-APD PreAmp ~2300 160 k€ PTD 80 uSOP 64 k€ Totale 384 k€ To Belle2 Network D

Costi di Sviluppo 2013-2015 NRE costs (k€) 2013 2014 2015 Napoli 12.5 k€ 42 k€ ? Roma3 12 k€ 22 k€ I costi di sviluppo devono considerarsi in aggiunta ai costi di produzione

EMC energy, slow and Trigger path Energy accurate measurement, trigger and slow control path Shaper Range (0,1) Pre-amp X Ncryst Slow control and monitor Trigger Fast Path Analog S Pulse Encoder n LVDS

Front end undoped CsI EMC BELLE 2 𝐼 2 𝐶 DAC SET Voltage Power Regulator 𝑉 𝐴𝑃𝐷 =250V to 500V 𝐼 2 𝐶 ADC READ Voltage 𝐼 2 𝐶 ADC READ Current APD Q output PTD con input da SLOW Ultra LowNoise Charge Preamplifier Front& cards Pre-Amp G ̴ 1,4V/pC N < 0.6 MeV Risoluzione@100MeV 4% and 1.6% @ 8 GeV Range E = µ ( ̴168MeV) to 8 GeV 𝑄resolution = 2%/(𝑒)1/4 Dinamica massima = ? V (da decidere) Dissipazione massima = ? mW da vedere potrebbe non essere un problema Alimentazione singola = +6V Dimensioni = 15 x 30 mm Regolatore Alta Tensione Regolazione = 250V a 500V Lettura e scrittura regolazione alta tensione = 16bit tramite protocollo I2C Stabilità regolazione alta tensione = 0.1‰ Range temperatura = 0 a 60°C. 2 or 4 LAAPS Si APD S8664-1010 and Front& cards Lavoro fatto ed in corso di implementazione nella matrice di CsI che stiamo costruendo

PTD : paramteri di slow control PTD CSI EMC BELLE 2 ……….. Single channel control units Ognuna controlla il singolo Pre-amp. From/to pre-amp ………….. SLOW control interface Set & Read Voltage single LAAPD (I2C protocol) la banda passante richiesta e’ qualche Mb/s. Ethernet control USB control HV primary HV generator 600V Funzioni di DAQ Processa signal Somma signali for cristallo Ecc.. PTD : paramteri di slow control HV primaria Soglie Monitor in tensione Monitor in corrente Temperatura Digitalizzazione Lettura adc uSOP (Na) FMC Lavoro fatto ed in corso di implementazione nella matrice di CsI che stiamo costruendo

uSOP: Service Oriented Tool Chain File System (P)NFS Network profiling Web Server Web Services Load Balancing GUI Run Control Graphic Display Controls DAQ Trig uSOP: Service Oriented Platform based on uP Cortex A8 ARM LINUX RAM FLASH USB Ethernet FPGA KINTEX 7 ZYNQ 7000 FMC SPI I2C Parallel Digital Timing uSOP Aggregation switch PC Server Photodetector APD FrontEnd Pre-Amp PTD Power Threshold Digital ReadOut Detetector, PreAmp, PTD

Lavoro svolto a RM3 1 2 3 Single ended to differential converter Front End 2 Start up system for the test beam 3 Single ended to differential converter 4 Conclusions and future development Questa è un'altra opzione per creare una diapositiva introduttiva.

Detector linear voltage regulator Front End. TOP side. Detector linear voltage regulator Charge pre-amp and detector Voltage regulator. BOTTOM side. Charge pre-amp. Aggiungere le diapositive necessarie per ogni sezione di argomento, incluse diapositive con tabelle, grafici e immagini. Vedere la sezione successiva per un esempio di tabelle, grafici, immagini e video.

Front End. Charge pre-amp Protection Pulse test IN C K Signal OUT KATODE Charge – Preamplifier Custom discrete amplifier at BJT transistor. Gain = 1.4V/pC Power dissipation = 16mW Single power = 6V to GND Dynamic Range 2.2V 50R Tau IN = 40ns TIMING CsI PURE: 40ns 420ns Signal IN Signal OUT

Cosmic ray test stand 1. Trigger Finger UP & Finger DOWN VIEW Electronics System Finger UP TOP VIEW Pb 5cm CsI Pure Finger UP Finger DOWN Logic NIM SCOPE Finger UP Pb CsI Pure Trigger Finger UP & Finger DOWN

Front End. APD SET-UP. Double APD Large Area read-out(S8664-1010). Mechanical support for APDs. Front end, mounted on APD.

Front End. LAAPD Performance. Standard analysis by Perugia. Alessandro Rossi.

Front End. PP 1inch SET-UP. PP 1inch double rea-out (HAMAMATSU 1’’ UV PENTODE). Mechanical support for 2 PP,voltage divider and front end electronics.

Front End. 2PP 1inch Performance. Signal/noise on ch1 = 49. Assuming a that muon delivers 30 MeV noise level is about 650 KeV Signal to noise ratio on ch2 = 76 Assuming a that muon delivers 30 MeV noise level is about 400 KeV Signal/noise on ch1+ch2 = 78. Assuming a that muon delivers 30 MeV noise level is about 400 KeV

PP 1inch e 2inch voltage divider. Pre Charge Amplifier LV PW HV PW

In view of the next test beam A test beam has been scheduled for next October. We need: To sets and read back several parameters: HVs for each single channel. temperature for each channel. The uSOP platform (see Alberto Aloisio’s talk) will not be ready by then therefore we have developped a temporary solution.

HV APD control system. ON BOARD: CPU (LPC1768FBD100) 16 Analog Signal Output Rear Panel NIM1U Front Panel NIM1U 16 Analog Signal Input 16 line I2C. Slow Control Front end 1-Ware protocol for external sensor: - Temperature. - Humidity. ON BOARD: CPU (LPC1768FBD100) HV for 16CH Front End LV for 16CH Front End High Voltage Generator. Frequency: 250kHz. Stability: 0,1% Selectable Voltage: - 50V - 100V - 600V USB & Ethernet Connection

Front End control system for APDs. Web panel. sets and reads back single channels HVs. Single channel temperature reading

Attivita’ 2015 Pre-amp in carica con uscita differenziale e basati su JFET (vogliamo migliorare il rapporto segnale fondo). Sviluppo di una scheda di controllo per l’amplificatore e per l’HV che tenga conto delle specifiche dell’esperimento piu’ restrittive di quelle sulla base delle quali sono state sviluppate le attuali distribuzioni di HV standard.

Richieste Consumo EMC FE 2015 15 Keuro di consumo per produrre una catena di studio del EMC basata sui nuovi pre-amplificatori e Controller HV che seguono le specifiche dell’esperimento. 4 Montaggi radiografie saldature etc.. 3 Connettori, componenti…

Richieste Missioni 2015 Metabolismo: 1 m.u./FTE + 1.5ke/FTE *4 FTE=30 Assemblaggio modulo a KEK (1 m.u.) 5.5 keuro Contatti tra gruppi italiani 4 keuro Refurbishment ECL 12 keuro 2 sw e physics meeting 8.5 keuro

Inventariabile Impulsatore 10 keuro