CSN2 20 September 2017 Mauro Taiuti & Giacomo Cuttone& Paolo Piattelli

Slides:



Advertisements
Presentazioni simili
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Advertisements

P. Capiluppi Organizzazione del Software & Computing CMS Italia I Workshop CMS Italia del Computing & Software Roma Novembre 2001.
Stato dei progetti LAMS e SIRENA NEMO Fase 2 Progetto PEGASO
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
Guardate le seguenti due frasi:
Commissione 1, Roma, 3 Aprile 2007M. Villa Stato del LUCID M. Villa per il LUCID group Storia recente Nuova strategia rivelatore Tests su fascio Tests.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
8 Maggio 2002Workshop CCR - La Biodola W2K Coordination Group & HEP-NT Report Enrico M.V. Fasanelli Gian Piero Siroli.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
Sicily (Italian and Sicilian: Sicilia) is an autonomous region of Italy in Europe. Of all the regions of Italy, Sicily covers the largest surface.
MUG-TEST A. Baldini 29 gennaio 2002
SUMMARY Transmission and distribution of the electric energy RIEPILOGO Trasmissione e distribuzione dell’energia elettrica RIEPILOGO Trasmissione e distribuzione.
Scheda per la rilevazione delle condizioni climatiche. abbiamo concordato di effettuare la rilevazione in una settimana concordata, alla medesima ora:
KM3-IT STATO DEL PROGETTO Responsabile: G.Cuttone Management Board: Anghinolfi,Capone, Coniglione,Cuttone,Piattelli Project Manager: Papaleo Steerring.
KM3NeT-IT The Capo Passero Infrastructure M. Anghinolfi – site manager.
L'attivita della sezione di Catania in km3 ha riguardato principalmente la realizzazione di test bench e tool per l'assemblaggio dei moduli ottici.
ORGANISATION OF THE EDUCATION SYSTEM IN ITALY 2010/2011.
Attività 2014 LNS  Presa dati e analisi  Gestione fondi PON (Acquisizione materiale, commesse, formazione…)  Completamento progettazione e avvio realizzazione.
Totale FTE tecnico elettronico 1 tecnico meccanico G.C.Barbarin o P.O.KM350% P.Migliozzi1 Ric. INFNKM380% C.MolloAssegno KM3KM380% G.DerosaRic. UKM330%
MM news & status -Final Design Review -NA for NSW -altre attività MM.
Fonti del diritto internazionale (art. 38 Statuto CIG)
Stato Costruzione/Integrazione P. Migliozzi 7/12/2012.
Bari, Bologna, LNF, Mi-Bicocca, Napoli, Pavia, Roma3 (1), Trieste.
Seafloor Network Km3Net - Italia R. Papaleo 7 dicembre 2012.
Silvia Minardi, Pavia 14 December maps and directions hours.
MSc in Communication Sciences Program in Technologies for Human Communication Davide Eynard Facoltà di scienze della comunicazione Università della.
ANTARES C.F. gruppo NA-SA: cresciuto numericamente, (+2.1 fte) responsabilita’ dirette nella fase di integrazione + data-base Notevole riduzione delle.
PANNON GÉP PANNON GÉP KFT Production of agricoltural tools and equipments since Our company is distinguished for the use of high quality material.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Events Workshop Next Workshops running now!
Il ruolo della Sezione di Genova
EU-IndiaGrid Project Joining European and Indian grids for escience
WRITING – EXERCISE TYPES
Il Programma ENI CBC Bacino del Mediterraneo
The KM3NeT Phase-1 Memorandum of Understanding
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Dichiarazione dei servizi di sito nel GOCDB
Km3 Continua il nostro impegno in tutte le attività intraprese:
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Daniele Pedrini INFN Milano-Bicocca
Comunicazioni Riunione ATLAS-Italia
Analisi dei dati dell’Esperimento ALICE
integrazione km3net italia
JetWalk: Agenda e review committee
Futuro Mobilità H2IT L. Crema.
Drafts H2020.
Km3NET Italia Progetto PON
P-ILC F. Bedeschi INFN-Pisa P-ILC Preventivi 2012 Preventivi 2012
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
HIGH SCHOOL «LEONARDO DA VINCI» OF TRENTO MEETS THE EEE PROJECT
X. Specifications (IV).
Avviso di seminario ERASMUS+
Atlas Milano Giugno 2008.
KM3-Italy IB meeting, 8 March 2013
P. Giannetti per il gruppo FTK
Proposal for the Piceno Lab on Mediterranean Diet
Direction-sensitive optical module for a km3-detector
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
Resoconto CD 29/ Comunicazioni
CdS 2017: embargo fino a TAUP2017
A comparison between day and night cosmic muons flux
Wikipedia Wikipedia è un'enciclopedia online, collaborativa e libera. Grazie al contributo di volontari da tutto il mondo, Wikipedia ad ora è disponibile.
Transcript della presentazione:

CSN2 20 September 2017 Mauro Taiuti & Giacomo Cuttone& Paolo Piattelli KM3NeT Astroparticle & Oscillation Research with Cosmics in the Abyss (ARCA & ORCA) CSN2 20 September 2017 Mauro Taiuti & Giacomo Cuttone& Paolo Piattelli

Outline General Remarks Phase 1 Phase 2 Km3 in Italy

KM3NeT Collaboration 12 Countries >40 Institutes >220 Scientists

Detector Construction Management Structure The Management Team meets fortnightly The Steering Committee meets monthly Project Management Team Installation Site Manager KM3NeT-Fr P.Lamare Spokeperson: M. Taiuti Deputy spokesperson: A. Heijboer Technical Project Manager: E. Koffeman Physics & Software Manager: P. Coyle Installation Site Manager KM3NeT-It N. Randazzo Installation Site Manager KM3NeT-Gr S. Harissopulos Project Steering Committee Detector Construction Qualification: S. Henry Power system: R. Cocimano Mechanics: E. Berbee Optical system: G. Kieft Electronics: D. Real Calibration: G. Riccobene PMT: P. Migliozzi DOM integration. D. Vivolo DU integration: I. Sgura Data Management Off-line Software & Computing: K. Graf On-line DAQ/Readout: T. Chiarusi

Phase 1 History Foreseen Realized so far 24 ARCA DUs 6 ORCA DUs

Phase 1 CTF: Cable Termination (Frame) : Secondary Junction boxes : Tower DU : String DU PPM-DU EMSO node

Phase 1 (the bad) Main failures occurred in the last year ARCA DU 3 ARCA Junction Box Phase-1 ORCA Cable ARCA system Investigation of failures allowed to find and solve several problems But last failure still without solution (money and vessel unavailability to survey the site and to try to recover bypass the failure and recover the system)

Phase 1 (the goods) ARCA DU3 JB Phase-1 ORCA Cable Modified grounding scheme inside the DOM Improved design of the VEOC (dedicated assembly tools realized by NIKHEF+LNS) JB Phase-1 Needs to be redesigned – contacts with MacArteney ORCA Cable Problem understood – it could represent, necessary to find a definite solution – contacts with Alcatel ORCA DUs are an improved version

Phase 1 (the goods) ORCA-DU1 and ORCA-DU2 ready for deployment (waiting for stable weather conditions)

Phase 1 (the goods) ARCA-DU1 and ARCA-DU2 deployed December 2015 and May 2016 at Capo Passero, Sicily worked till April 2017 plenty of statistics Data analysis of atmospheric muons shows excellent agreeement between data and MonteCarlo

Phase 1 (the goods)

Phase 1 Summary Early «infant mortality» intrinsic of any starting project (obviously we cannot exaggerate!) Several lessons learned Quality of DUs highly improved Quality Assurance generally improved The detectors performances are well under control

Phase 2 Budget France: 8 M€ secured, new request for 20 M€ ongoing Italy: POR Sicilia 34.5M€ secured (50% INFN co-funded) The Netherlands: new request for 12.7 M€. Decision in 2018 Italy: PON IR 16 M€

Phase 2 ARCA: Astronomy Research with Cosmics in the Abyss To be installed in the Italian site of the KM3NeT infrastructure 115 detection units per building block 18 DOM per DU Vertical DOM spacing 36 m Inter-DU spacing 90 m 2 building blocks Total volume ≈1 km3

Phase 2 The production and integration rates have been defined to complete the construction in 2022

Phase 2 PMTs The specifications for the PMT tender have been defined The tender is expected to start shortly ARCA cable The definition of the specifications of the Phase 2 - ARCA cable is in progress Review Committee (F. Ameli, M.Circella, R. Cocimano, A. D'Amico, P. Lamare, K. Leismuller, M. Sedita, M.T.) The tender is expected to start this year

Phase 2 Set-up of integration facilities on-going DOM integration sites Catania, Naples, NIKHEF OK Athens, Erlangen, Rabat, Strasbourg in progress DU integration sites LNS, NIKHEF OK Genova in progress Full description in next slide

KM3NeT Phase-1 Infrastructure Target integration speed: Up to 5 DOMs/week/site Up to 1 base module/week/site Up to 1 DU/month/site KM3NeT Phase-1 Infrastructure 3 Installation sites 2 PMT preparation sites 5 DOM integration sites 3 DOM integration sites planned / in preparation 3 base module integration sites 3 DU integration sites 3 DU test and preparation to deployment sites 1 DU integration site planned 1 electronic refurbishment center KM3NeT-HQ Amsterdam Erlangen Strasbourg Genova Bologna Marseille KM3NeT-Fr Bari Naples Valencia Athens Catania KM3NeT-Gr KM3NeT-It Rabat

Report to the President of the INFN Il Comitato di Valutazione Internazionale (CVI) N. Amodio, Confindustria, It; P. BinŽtruy, APC Laboratory, Fr; M. Bosman, IFAE, Barcelona, Es; M.N. Harakeh, KVI-CART, Groningen, ; A. J. S. Smith, Princeton University, USA (chair); C. Spiering, DESY, D; and E. Zaninotto, Università di Trento, I December, 2016 CSN2 KM3NeT: The failure of the 3rd string is a reason of concern (although the string was recovered and the problems identified). However, its strategic importance is very high so INFN should continue to support it, and consider postponing the tower deployment for the moment to continue with strings first. In this way the decisione on best use of the towers (e.g. for a dense core) can be made without time pressure

In Sicilia operano i principali EPR Nazionali In Sicilia operano i principali EPR Nazionali. Nel dicembre 2014 call per «INVITO A PRESENTARE MANIFESTAZIONI DI INTERESSE PER L’INSERIMENTO NELLA RETE DELLE INFRASTRUTTURE DI RICERCA DEL PIANO NAZIONALE DELLE INFRASTRUTTURE DI RICERCA- PNIR» Il Contesto Le prime 3 I.R. della graduatoria sono state inserite nel PNIR. Nel PNIR sono state, inoltre, individuate le I.R. ritenute strategiche per il paese (17) tra cui i LNS (Laboratori Nazionali del Sud) e KM3NeT. KM3NeT è l’unica infrastruttura con sede in Sicilia ad essere inserita nella nuova road map ESFRI (2016-2020)

Il Laboratorio Multidisciplinare Distribuito sul Mare Messina Roosevelt Catania Capo Granitola Portopalo

Il Laboratorio Multidisciplinare Distribuito sul Mare Il Laboratorio è stato indicato dalla Regione Siciliana come l’I.R. a più alta priorità strategica da inserire internamente al PNIR (Piano Nazionale delle Infrastrutture di Ricerca). KM3NeT è una parte fondamentale di questo Laboratorio che coinvolge i principali EPR Italiani.

Finanziamento POR Regione Siciliana (scadenza 31/12/2019) Progetto INFN-INGV-CNR: 40 M€ cofinanziato al 50% dalla Regione INFN 34.5 M€, INGV 5 M€, CNR 0.5 M€. Per INFN 2.15 M€ da Premiale Labmed, 14 M€ da Foe Esfri Km3NeT (2016-2019), Personale 0.6 M€,Budget LNS 0.5 M€. Il programma di attività è stato definito assieme al management di Km3NeT.

Cosa possiamo rendicontare

Infrastrutture e impianti 2 M€ Nuovo cavo: 14 M€ JB (fase 1 e 2) 4.5 M€ Operazioni Marine 3.6 M€ LOM x 8 0.4 M€ 22 Stringhe 7.0 M€ Completamento fase 1 1.5 M€ Infrastrutture e impianti 2 M€ Spese tecniche 1.5 M€ Obiettivo: Nel 2022 avere istallati e funzionanti almeno 72 stringhe e 8 Torri (Fondi PON 2007-13, POR Sicilia, PON IR 2014-2020). Almeno 24 stringhe già operative per la primavera 2019

Portopalo di Capo Passero INGV INGV INGV INGV INGV INGV

Portopalo di Capo Passero Non più vuoto ma soppalco Portopalo di Capo Passero INGV INGV

IR ed il contesto dei fondi strutturali Sicilia Italia Europa Azione dedicata al finanziamento delle 17 I.R.: Km3NeT con tetto di 16 M€ a cura della sez. Napoli e Bari. Settembre 2017 pubblicazione del bando.

Time schedule Primavera 2018: review del sito per ananlisi problemi e installazione di 3 nuove stringhe. Autunno 2018: Installazione nuove JB e 3 stringhe Primavera 2019: 3 operazioni marine per installazione 18 stringhe. Start Integrazione stringhe fase 2 Estate 2019: Installazione secondo cavo con MVC e JB Primavera 2020: 3 operazioni marine per installazione 22 stringhe (con fondi POR) …. Per programma PON aspettiamo bando e tempi

Km3NeT is going to be ready for Multimessanger Astronomy Conclusions Hard times … but we steadily and stubbornly proceed Significant improvements in the detector construction, in the data analysis and in the physics program definition The Collaboration is well represented in conferences The Physics program is attracting new participants Km3NeT is going to be ready for Multimessanger Astronomy