INSIDE 24/25-3-2014 MECCANICA G. Giraudo INSIDE Milano 24-25/03/2014
Aluminium Plate Hamamatsu Cable G. Giraudo INSIDE Milano 24-25/03/2014
Flow Rate = 2x3 ℓ/min (Acqua) Temp. in = 18 °C ΔT = 0,2 °C Aluminium Plate 282x98x10 Flow Rate = 2x3 ℓ/min (Acqua) Temp. in = 18 °C ΔT = 0,2 °C ΔP = 0,05 bar Re = 8500 G. Giraudo INSIDE Milano 24-25/03/2014
Cristal Positioning Plate (Aluminium/Plastic) 295x110x2 Aluminium Box 306x235x171,5 (h) G. Giraudo INSIDE Milano 24-25/03/2014
INSIDE Pos. 1 TRACKER PET G. Giraudo INSIDE Milano 24-25/03/2014
INSIDE Pos. 2 TRACKER PET G. Giraudo INSIDE Milano 24-25/03/2014
INSIDE Detectors Line Tavola rotante NADELLA MB-MA-199 TRACKER Servomotore MINIMOTOR PET ISOCENTRO Guida lineare NADELLA AXDL160 G. Giraudo INSIDE Milano 24-25/03/2014
Parking Position G. Giraudo INSIDE Milano 24-25/03/2014
L’INSTALLAZIONE DELLA MOVIMENTAZIONE RICHIEDE: 5 SERVOMOTORI (MINIMOTOR) (?) 5 ENCODERS (ROTATIVI O LINEARI) (?) FINECORSA DI PRECISIONE (MECCANICI) SICUREZZE HARDWARE CONTRO MANOVRE ERRATE L’INSTALLAZIONE DELLA MECCANICA RICHIEDE: FORATURE AL PAVIMENTO DISPOSITIVI PER IL CONTROLLO DELL’ACQUA (CHILLER, REGOLATORI DI FLUSSO, MANOMETRI, …) G. Giraudo INSIDE Milano 24-25/03/2014