GRIDCC A realtime interactive GRID to integrate instruments, computational and information resources widely spread on a fast WAN Status Report e Richieste.

Slides:



Advertisements
Presentazioni simili
A. Oppio, S. Mattia, A. Pandolfi, M. Ghellere ERES Conference 2010 Università Commerciale Luigi Bocconi Milan, june 2010 A Multidimensional and Participatory.
Advertisements

DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
P. Capiluppi Organizzazione del Software & Computing CMS Italia I Workshop CMS Italia del Computing & Software Roma Novembre 2001.
Testbed release: processo di integrazione e validazione A. Ghiselli, L. Gaido.
Queuing or Waiting Line Models
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Le politiche della Commissione Europea sull'accesso aperto. Il ruolo delle biblioteche accademiche Salone del libro di Torino, 10 maggio 2012 Maddalena.
EMPOWERMENT OF VULNERABLE PEOPLE An integrated project.
Milano, Marzo 2014 Corso di Europrogettazione HORIZON 2020: Struttura della Proposta Lauro Pollachini – FSP.
D2b Antonio Lioy Marco Vallini Politecnico di Torino Dip. Automatica e Informatica (Sestriere, Gennaio 2015)
WP4 – Software Infrastructures. How it was Overall goal “The outcome of WP4 is the design, implementation and evaluation of software components that will.
Giovanni Biondi ICT e trasformazione della Scuola.
16 Maggio CSN1 Computing-Software-Analysis CMS-INFN TEAM Analisi in CMS: stato e prospettive del supporto italiano.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
Taccani1 7.4 Identification ANALISI DEI PERICOLI Hazard Analysis Identificazione Valutazione Misure di Controllo Control Measures Assessment.
8 Maggio 2002Workshop CCR - La Biodola W2K Coordination Group & HEP-NT Report Enrico M.V. Fasanelli Gian Piero Siroli.
Installation and evaluation of the Globus toolkit Massimo Sgaravatto INFN Padova.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
Layered Grid Architecture. Application Fabric “Controlling elements locally”: Access to, & control of, resources Connectivity “Talking to Grid elements”:
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
40 years of the Italian JPO Programme: an overview 14 dicembre Camera dei deputati - Roma Giovani italiani nelle Nazioni Unite: una storia lunga.
Storage (ieri, oggi e domani) Luca dell’Agnello INFN-CNAF.
Gaetano Maron, Presentazione T2 LNL-Padova, Legnaro 22 dicembre Il Servizio Tecnologie Informatiche ed Elettroniche dei LNL Gaetano Maron.
DECIDE DECIDE ( Diagnostic Enhancement of Confidence by an International Distributed Environment ) Laura Leone - GARR DECIDE Project Coordinator Dalla.
INFN—Catania Giuseppe Andronico Bologna, 23 Gennaio 2014.
ORGANISATION OF THE EDUCATION SYSTEM IN ITALY 2010/2011.
EU-IndiaGrid2 (RI ) Framework Programme 7 ( ) Research infrastructures projects EU-IndiaGrid2 Sustainable e- infrastructures.
FONDACloud Federated EnvirONment for Data Analysis in the Cloud Call ICT-7 (23 Apr ‘14) Luciano Gaido (INFN-TO)
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
Futuro di EGI EGI è menzionato esplicitamente nel draft delle nuove calls EU ( H2020 ) Da ultima versione (per me) data 18-9 di –HORIZON 2020 – WORK PROGRAMME.
Definizione del piano delle attività di progetto L’esperienza CoBaSys Donata Franzi IMT Alti Studi lucca Università degli Studi di Modena e Reggio Emilia.
MSc in Communication Sciences Program in Technologies for Human Communication Davide Eynard Facoltà di scienze della comunicazione Università della.
GM, , CNAF 1 GRIDCC (GRIDCC-II) A realtime interactive GRID to integrate instruments, computational and information resources widely spread on.
Who we are EUAsiaGrid 1Istituto Nazionale di Fisica Nucleare (Italy) (coordinator) 2CESNET (Czech Republic) 3University of Manchester (UK) 4HealthGrid.
PANNON GÉP PANNON GÉP KFT Production of agricoltural tools and equipments since Our company is distinguished for the use of high quality material.
Claudio Grandi INFN Bologna Centres of Excellence in H2020 Claudio Grandi INFN-Bologna.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Riunione INFN – Bologna, 17 January 2013
EU-IndiaGrid Project Joining European and Indian grids for escience
WRITING – EXERCISE TYPES
MONBOX Federico Bitelli bitelli<at>fis.uniroma3.it
Il Programma ENI CBC Bacino del Mediterraneo
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
PROGETTI PER FINANZIAMENTI EUROPEI
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
SPES (highlights and economic plan)
Dichiarazione dei servizi di sito nel GOCDB
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
I progetti PI2S2 e TriGrid VL
PixFEL PV Personale partecipante e richieste finanziarie
ViralPack: Un pacchetto integrato di bioinformatica su Genius
Futuro Mobilità H2IT L. Crema.
Flipping.
ONEDATA - distributed data caching -
WARGI-DSS Andrea Sulis, Ph.D.
Ingegneria del Software 2
X. Specifications (IV).
Riunione di ATLAS Italia - BO
Avviso di seminario ERASMUS+
P. Giannetti per il gruppo FTK
Marzo 2018.
Proposal for the Piceno Lab on Mediterranean Diet
General Office for Airspace
Service Level The Service Level is defined as the percentage of orders cycles in which inventory is sufficient to cover demands, or.
SWORD (School and WOrk-Related Dual learning)
CdS 2017: embargo fino a TAUP2017
Group B – Gucci profile part II
Transcript della presentazione:

GRIDCC A realtime interactive GRID to integrate instruments, computational and information resources widely spread on a fast WAN Status Report e Richieste 2007 Silvano Squizzato Istituto Nazionale di Fisica Nucleare Laboratori Nazionali di Legnaro Legnaro Italy GM, 06.09.2006, CNAF

GRIDCC main goals ... the GRIDCC project extends the state of the art of computing Grid technologies, by introducing the handling of real-time constraints and interactive response into the existing Grid middleware Our goal is to build a widely distributed system that is able to remotely control and monitor complex instrumentation …These new applications introduce requirements for real-time and highly interactive operation of GRID resources. One of the main objectives of the project is to verify the feasibility of a Grid-based remote control of systems requiring real-time response with real applications running on existing Grid test beds over both national and international network infrastructures (e.g. GEANT). GRIDCC integrates a “grid of instrumentation” into existing Grid infrastructures that provide the computational power and storage needed for the applications …. GM, 06.09.2006, CNAF

General on the GridCC Project It is a 3 years project. Started the 1st September 04 INFN is the partner coordinator of the project Funded by EU in FP6, 4 MEuro 10 Partners from 3 EU Countries + Israel About 40 people engaged www.gridcc.org Participant name Country Istituto Nazionale di Fisica Nucleare Italy Institute of Accelerating Systems and Applications Greece Brunel University UK Consorzio Interuniversitario per Telecomunicazioni Sincrotrone Trieste S.C.P.A IBM (Haifa Research Lab) Israel Imperial College of Science, Technology & Medicine Istituto di Metodologie per l’Analisi Ambientale – Consiglio Nazionale delle Ricerche Università degli Studi di Udine Greek Research and Technology Network S.A. GM, 06.09.2006, CNAF

Working Package List WP1: System Architecture (Imperial) – Overall system architecture. Definition of the QoS parameters needed for a network infrastructure where real time and interactive services are used. WP2: Real-time and Interactive web services middleware (Brunel) – Extending web service based middleware into interactive and real time computing. WP3: Grid-Enabled Instrumentation (INFN) - Development of generic Virtual Instrument Service (VIS). Development of the all Supporting Services needed to catalog, configure, monitoring, analyze errors, fixing automatically problems and finally read out the Grid-enabled instrument resources. WP4: Brokering access to existing Grid resources (Imperial) - Controlling access to gridified resources according agreed levels of service and providing mechanisms for determining and organising complex workflows. WP5: Cooperative Environment (Elettra) - Design and development of a multiuser cooperative environment (i.e. a groupware software) that will be a common component of the various GRIDCC applications. WP6: Integration and Pilot Applications (IASA) - System integration and deployment of a small number of pilot applications on existing Grid testbeds. GM, 06.09.2006, CNAF

Working Package List WP7: Information dissemination and exploitation (CNIT) – To ensure that the results of the project are widely disseminated and that the results are exploited by existing (e.g. EGEE) and future Grid development projects WP8: Management (Brunel) - To ensure all objectives are realised and all deliverables are completed according to schedule and within budget. Management and resolution of conflict within the project, including the redefinition of WP deliverables. Protection and exploitation of the IP arising from the project. GM, 06.09.2006, CNAF

GridCC Architecture Overview Instrument Element Instrument Element Instrument Element Virtual Control Room Virtual Control Room Computing Element Computing Element Computing Element Storage Elements Storage Elements Storage Element Web Service Interface Exec. Service WfMS WMS AgrS Existing Grid Infrastructures GM, 06.09.2006, CNAF

Partecipants vs WPs Person per month IASA BRNL CNIT ELETTRA IBM Imperial INFN IMAA UNIUD GRNET TOTAL PARTNERS Research/innovation activities WP1: System Architecture 6 30 WP2: Real time Web Service 38 36 33 107 WP3: Grid Enabled Instrumentation 106 42 20 154 24 346 WP4: Real-time workload 149 WP5: Cooperative Env. 101 48 WP6: System integ. & deployment 136 50 62 54 44 80 75 531 GM, 06.09.2006, CNAF

Main Milestones X Architecture document Web Service evaluation Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Architecture document X Web Service evaluation Collaborative Environment core Security plan implementation VIGS, Resource, Info&Mon, Problem Solver Service prototypes Coll. Envir. Final Installation of the applications VIGS, RS, IMS, PS final Application tests complete 1st September 2004 1st Annual Rvw Roll-on Rvw 2nd Annual Rvw GM, 06.09.2006, CNAF

CMS , Main Pilot Application di GridCC GridCC middleware in use to control the CMS Magnet Test and Cosmic Challenge (MTCC) worked over the summer GM, 06.09.2006, CNAF

CMS Prototype: IE at work CMS Instrument Element GridCC middleware used for CMS MTCC (Magnet Test and Cosmic Challenge) - 11 Instrument Managers with a hierarchical topology - Instruments are, in this case, Linux hosts where the cms on-line software is running - More than 100 controlled hosts - First MTCC phase successfully completed TOP Det 1 Det 1 Det 1 Detector GTP 8 1 DAQ DAQ Instrument Managers DAQ TTS FedBuilder RuBuilder FilterFarm Trigger GM, 06.09.2006, CNAF

Main GridCC Pilot Applications: Remote Operation of an Accelerator Demo foreseen For the next Annual Review October 2006 Elettra Synchrotron GM, 06.09.2006, CNAF

Main IE Pilot Applications: Power Grid Demo foreseen For the next Annual Review October 2006 Virtual Control Room Instrument Manager Power Grid V.O Instrument Element Solar Panel .. Power Generators GM, 06.09.2006, CNAF

The other GridCC pilot applications IDS Intrusion Detection System. Demo at the roll-on review Meteorology (Ensemble Limited Area Forecasting). In progress Device Farm for the Support of Cooperative Distributed Measurements in Telecommunications and Networking Laboratories. In progress Geo-hazards: Remote Operation of Geophysical Monitoring Network. In progress GM, 06.09.2006, CNAF

Status GridCC 1st Annual Review (29 October 2005) “In general, the project is well on its way. A few recommendations to further strengthen the success of the project are given in Section 9 of this report.” “All project partners except IBM, have performed well in the first year of the project and mainly achieved their objectives. Corrective actions for IBM have been discussed and agreed which will allow effective integration of this partner in the second and third year of the project.” “Overall, the project consortium has worked efficiently and is encouraged to continue with their future planned activities and increase the coordination among partners.” Roll On Review (28 April 2006) “The most outstanding achievement is the progress with the Instrument Element which is considered to be the flag ship of the project, in particular since several basci Grid definitions state that “a Grid combines storage and computing resources as well as scientific instruments”. Therefore the project has good potential in the coming years” 2nd Annual Review (18 October 2006) Deployment of the Instrument Element on the main applications Integration with gLite (WMS, CE, SE). Use of gLite/Cream. Use of Storm as SRM Agreement Service and Quality if Service. GM, 06.09.2006, CNAF

Motivazioni Trasferte Interne per LNL GridCC Servono principalmente per meeting tra i partner italiani e attività di integrazione del middleware. INFN infatti sviluppa nel WP3 il middleware di GRIDCC che va poi integrato nelle applicazioni pilota previste. Ci sono infatti tre applicazioni italiane che richiederanno un’attività di integrazione sul campo da parte dell’ INFN: 1. Controllo strumentazione per telecomunicazione (Device Farm CNIT); 2. Controllo remoto di un acceleratore (Elettra); 3. Controllo remoto e monitoraggio di un territorio ad alto rischio sismico (IMAA/CNR). Vengono richiesti: 15 Keuro GM, 06.09.2006, CNAF

Motivazioni Trasferte Estero per LNL - I GridCC: sviluppo del middleware in collaborazione con gli altri partner del progetto e con CMS/CERN. CMS/CERN non partecipa direttamente al progetto, ma collabora attivamente allo sviluppo del middleware e di un’applicazione (vedi sotto). sviluppo e integrazione del Run Control dell’esperimento CMS, una delle principali applicazioni pilota del progetto. Questa parte del progetto viene sviluppata in stretta collaborazione con CMS/CERN (gruppo TriDAS – S. Cittolin) e abbisogna di un rapporto costante con il CERN. integrazione del software di WP3 nelle altre applicazioni pilota (per UK e Grecia). INFN-LNL e’ coordinatore del progetto. intensa attività di “dissemination” a livello internazionale (conferenze, workshop, etc ...) visto che si tratta dell’ultimo anno di progetto. GM, 06.09.2006, CNAF

Motivazioni Estero per LNL - II Vengono richiesti: 90 Keuro per trasferte di lavoro estero + conferenze internazionali Previsti poco più di 10 FTE per l’intero progetto GRIDCC In media si stima per queste attività: 2 mesi / FTE Costo medio per 2 mesi di trasferta: ~ 9 Keuro Totale: 9 * 10 Keuro 10 Keuro per il coordinamento del progetto GridCC a livello europeo GM, 06.09.2006, CNAF

Richieste per 2007 FTE/person Missioni Interne (Keuro) Missioni Estere Consumo Totale LNL 10.3/12 15 100 10 125 CNAF 0.2/1 2 4 6 GM, 06.09.2006, CNAF