LO STATO DI CMS CMS-Padova 19-05-09 M. Diemoz.

Slides:



Advertisements
Presentazioni simili
Cancer Pain Management Guidelines
Advertisements

1 Agenda - Analisi su cluster Padova: notizie utili (next slides) Ugo - report dal meeting di Particle Flow e primi studi di fattibilita' di H->WW->mu.
1 Muon commissioning & prospettive Global Runs - Attivita di commissioning con i cosmici (run locali, indipendenti dal resto di CMS): - check sistematico.
Stato dell’esperimento CMS 2008
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
A man has decided to include in his home intelligent systems to monitor the home. He installed two water pulse counters into the central water system.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
PROPOSTE PER CMS Calabrese Campana Morandin ( ) Discussione sj locali + fondo indiviso per DT + RPC + MI ECAL (il resto e’ rinviato a settembre)
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
Referees LHCB-CSN1 05/041 LHCB : proposte dei referees Giovanni Batignani Chiara Meroni Rosario Nania.
Comunicazioni La storia trasparente della CSN1 Sanzioni in arrivo per l’arcicattivo: Zoccoli: HERA-B A Luglio ti puniremo ! E ora bisogna.
Italian -Months of the Year To know the months of the year
Guido Tonelli / Gr1-Roma RRB19.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
Polarized target magnet New target magnet SMC (70 mrad)  COMPASS (180 mrad) Field homogeneity of ~ 3 × Saclay Test ripetuto al CERN:
Trieste M. Diemoz - INFN Roma ECAL Settembre 2006.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
L. Carminati - P. GovoniIII Workshop sull fisica di ATLAS-CMS1 sessione di discussione uno spunto: la calibrazione in situ dei rivelatori CALORIMETRI ELETROMAGNETICI:
Presentazione documenti inviati al RRB e piani futuri Commissione Scientifica Nazionale I 13 ottobre 2003 S. Patricelli Punti principali in discussione.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
CSN1 Pisa M. Diemoz LO STATO DI CMS Settembre 2008 Era più bello prima!...
REF CMS Roma M. Diemoz CMS ATTENDE (LHC).
TOTEM review a LHCC C. Cecchi CSN1, Parma 24/09/2010 CSN1, Parma 23/09/10C. Cecchi  STATO DELL’ESPERIMENTO & PHYSICS PLAN 2010/2011  INSTALLAZIONE DI.
CSN1 - CMS Referee Report P.Giannettii - INFN / Pisa Ferrara, 20 maggio 2007 CMS - Relazione dei Referee G. Bruni, A. Cardini, P. Giannetti, M. Grassi,
LHCf referee M.Costa, A.M.Zanetti LHCf Referee - CSN1 Sett 2011.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Michele Iacovacci (Napoli),
CMS – Relazione dei referee su MOFA, Similfellow e Milestones
C.Roda Universita` e INFN Pisa
ATLAS – CMS – RD-FAS2 Sblocchi e nuove richieste
M.Biasini, P. Checchia 23 Settembre Riunione CSN1
Elezione Responsabile Nazionale ATLAS
Atlas CSN1 25 Novembre 2008.
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
LHCB : proposte dei referees
Introduzione : MEG + MEG 2
Richieste 2017 HMPID e LHC_IF
Jobs and occupations What do they do?
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
Sommario TOTEM review a LHCC Franco Bedeschi CSN1, Roma, Luglio 2010
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Daniele Pedrini INFN Milano-Bicocca
Analisi dei dati dell’Esperimento ALICE
JetWalk: Agenda e review committee
STATO CMS: ATTENDE (LHC)
Stato di Tilecal al 10/09/2008 (primo fascio)
FCCee/CepC/(ILC): possibili contributi INFN al rivelatore
Responsabile locale: F. Ferro
ONEDATA - distributed data caching -
Accelerator Disision March 3rd 2015
LHCb: Stato del Rivelatore di Muoni
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
M.Biasini, P. Checchia 18 Settembre 2008 Riunione CSN1
Atlas Milano Giugno 2008.
SuperB Richieste 2010 Francesco Forti Università e INFN, Pisa
C. Bini, P. Paolucci, A. Tricomi
STATO DI CMS Bari M. Diemoz.
ATLAS Italia Computing Richieste 2007 (Tier-2 e locali)
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Z+b(b) production at LHC with ATLAS
Physics: Produzione risonante di ZV in ll+jets
CdS 2017: embargo fino a TAUP2017
A comparison between day and night cosmic muons flux
Wikipedia Wikipedia è un'enciclopedia online, collaborativa e libera. Grazie al contributo di volontari da tutto il mondo, Wikipedia ad ora è disponibile.
Transcript della presentazione:

LO STATO DI CMS CMS-Padova 19-05-09 M. Diemoz

Outline PROGRESSI DA SETTEMBRE SHUTDOWN PREPARAZIONE ALL’ANALISI IN ITALIA CMS-Padova 19-05-09 M. Diemoz

Attività Shut Down Riparazioni del rivelatore: interventi DT interventi FPIX interventi CSC Cooling plant x TK ECAL: completamento 37-esimo Supermodulo Calibrazione con cosmici a fine assemblaggio CMS-Padova 19-05-09 M. Diemoz

Interventi sul rivelatore After the cosmics run ended (Nov ‘08), the detector was opened for a broad program of carefully selected maintenance and repair activities, as well as the installation of the preshower subdetector on both endcaps. Work has progressed according to the schedule laid down in Nov. 2008. The highlights are: the completion of the repairs to the barrel muon DT system the removal, repair, and re-insertion of the forward pixel system the completion, installation and commissioning of the preshower (ES) much progress with the maintenance and repair of other sub-systems good progress with the revision of the tracker cooling plant the maintenance of the general cooling and electrical systems (done before Xmas) Re-commissioning of CMS detector and full data-flow path has begun, with mid-week-global runs every two weeks interspersed with final maintenance and consolidation activities. Powering of the tracker awaits completion of the revision of the tracker cooling plant. Aiming to take a long cosmics run with field-on in July CMS-Padova 19-05-09 M. Diemoz

P5-Riparazioni Had lost 200 ECAL channels due to a LV problem! Insulation ‘scraped off’, Now repaired, all other cables ‘controlled’ Fpix removal 6 % canali Fpix (morti) riparati Perdite nel cooling sistemate CMS-Padova 19-05-09 M. Diemoz

P5-Riparazioni Muon DT maintenance work started in November is now completed. All interventions have been successful: cells disconnected back to the 0.2% inherited from construction and original installation. Work on YB0 was less difficult than anticipated Interventions on some minicrates, improvements for safety (Additional T sensors, ..), install more Hall probes for field measurement, … Chambers retested and recertified. Optical Hardware Muon Alignment Completed all the necessary repairs, re-adjustments and test of components (structures - MABs, ARs, LDs-, sensors, and readout boards). Re-installed and surveyed almost all components CMS-Padova 19-05-09 M. Diemoz

Preshower installato ES attached to support cone ES cabled The two separate ES Dees Transporting ES towards EE ES attached to support cone ES cabled CMS-Padova 19-05-09 M. Diemoz 7

Preparazione alla fisica Physics Objects CRAFT analyses/data have offered excellent laboratory for “real work” – from tracking to muons to E/H-CAL… Major improvements to jet measurement by adding track information (or the more general-purpose particle-flow technique) Physics Analysis Toolkit - PAT-uple , a neologism From LHCC referees – “Experience at the TeVatron and the B Factories has shown that a common “language” like this has been of great benefit in producing physics results that can be easily understood, and rigorously evaluated within the collaboration” Resumed physics analysis work; now moving all analyses to 10 TeV Large data samples from CMSSW_2_x were completed after Xmas. Latest particle-flow code and objects available for analysis. CMS-Padova 19-05-09 M. Diemoz

Preparazione alla fisica Barrel Endcaps CMS-Padova 19-05-09 M. Diemoz

CMS Center CMS-Padova 19-05-09 M. Diemoz

Preparazione all’analisi - ITA Gruppo per il Coordinamento dell’Analisi: favorire l'inserimento di chiunque voglia fare analisi (giovani e non) nei gruppi di fisica di CMS dando suggerimenti per una partecipazione utile, efficiente e coerente con l'attività di chi già lavora. seguire l’ attività dei similfellow in modo che questa sia utile a tutta la comunità italiana che fa analisi. armonizzare e filtrare gli abstract per la SIF organizzare i reharsal per i talk importanti a livello italiano (plenari SIF, IFAE, CSN1) organizzi il programma dei due workshop annuali CMS fisica/soft/comp sviluppi una serie di strumenti atti a valutare in modo oggettivo l'impatto della comunità italiana sull'analisi (es. % note CMS con nomi INFN, etc.) CMS-Padova 19-05-09 M. Diemoz

Implementazione GCA Deciso a Luglio, poi STOP LHC e un po’ depressione Il GCA è formato da 3 fisici + il Rappresentante Nazionale (chair) che abbiano una certa esperienza di analisi, che non abbiano nel 2009 responsabilità a livello CMS che coprano un ampio spettro di interessi fisica I colleghi scelti da CMS Italia per questo compito: Maurizio Biasini, Ernesto Migliore, Shahram Rahatlou hanno gentilmente acconsentito e sono già al lavoro. CMS-Padova 19-05-09 M. Diemoz

Link ai gruppi di fisica CMS B QCD SUSY Maurizio Biasini EWK TOP HIGGS Ernesto Migliore EXOTICA SUSY HIGGS Shahram Rahatlou CMS-Padova 19-05-09 M. Diemoz

Distribuzione interessi fisica QCD Pg, Bo EWK Ba, Fi, Mi, Na, Pd, Pi, Rm, To, Ts TOP Pg, Pv HIGGS Ba, Mi, Pd, Pv, Rm, To SUSY Ct, Rm EXOTICA Bo, Pi, Rm, Mi B Phys Pg, Fi, Mi, Pd FW Phys To CMS-Padova 19-05-09 M. Diemoz

INFO PER ANALISI SITO CMS CMS-Padova 19-05-09 M. Diemoz

Impatto Scientifico INFN CMS-Padova 19-05-09 M. Diemoz

IMPATTO INFN in CMS Misura con criteri oggettivi (valutazione) l’impatto INFN: a quanti articoli (vari tipi di note) contribuiamo che frazione siamo degli speaker a Conferenze Internazionali che capacità di leadership abbiamo …………………… L’investimento dell’INFN in CMS ha un ritorno scientifico adeguato? Vale la pena continuare ad investire? CMS-Padova 19-05-09 M. Diemoz

CMS Schedule Maintenance & Operation Jan Feb Mar Apr May Jun Jul Aug Sep Oct 2) Software, Computing & Physics Analysis Release CMSSW3_0 (limited validation, step towards 3_1) Install ES1 Install ES2 Release CMSSW3_1 (LHC Startup) Tracker Cooling Plant Revised Full validation of 3_1 (incl. production and physics) Close CMS Magnet Tests CRAFT Use 3_1 widely CMS gets familiar with 3_1 CRAFT Contingency & pre-beam maintenance CMS READY for Beam CMS READY for Beam From Dec’08 CMS-Padova 19-05-09 M. Diemoz 18

CONCLUSIONI Il lungo shut down ha permesso di ultimare le riparazioni programmate in novembre 08 e completare l’installazione del Preshower ECAL. E’ in corso il re-commissioning dopo le riparazioni e il commissioning dei pezzi installati in ritardo (ECAL EE e PS). I dati del CRAFT sono stati utilissimi a mettere a punto CMS, il piano è di pubblicare I risultati prima della partenza di LHC In Italia ci prepariamo all’arrivo dei dati. Speriamo in modo efficace. Ad inizio luglio workshop CMS Italia per fare il punto sullo stato di preparazione e copertura dei temi di analisi fondamentali allo start-up. CMS sarà pronto al data-taking con fasci con anticipo (non vorrei doverlo ripetere mai più!) CMS-Padova 19-05-09 M. Diemoz