SLHC Phase I & II Upgrades

Slides:



Advertisements
Presentazioni simili
L’esperienza di un valutatore nell’ambito del VII FP Valter Sergo
Advertisements

Cache Memory Prof. G. Nicosia University of Catania
1.E un algoritmo ricorsivo: Tutti le istanze di oggetti raggiungibili da un oggetto persistente diventano anchessi persistenti.
P. Capiluppi Organizzazione del Software & Computing CMS Italia I Workshop CMS Italia del Computing & Software Roma Novembre 2001.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
A. Di Ciaccio Riunione RPC 17 luglio 2002 Lecce Test ad X5-GIF (3-10 luglio 2002) Scopi del test (discussi tra di noi,con i referee ed al GruppoI a giugno)
Motor Sizing.
R&D muoni. Stato dell’arte Il gruppo ha appena cominciato il lavoro – Prospettiva: preparazione workshop Definizione temi del workshop Analisi stato dell’arte.
R&D per ATLAS G. Darbo - INFN / Genova Frascati, 24 Novembre 2005 Attivit à Specifica di R&D per il Rivelatore ATLAS G. Darbo - INFN / Genova Talk Overview:
I giorni della settimana
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
1 Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC CSN1 - Napoli 23 Settembre Angelo Scribano TOTEM – settembre 2005.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
WG-SLHC Dove siamo, …. dove e come andiamo? Spunti per una discussione M. de Palma Roma, CSN1 16 Maggio 2006.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
15.11,2005 LNFMarcello A Giorgi1 Marcello A. Giorgi Università di Pisa and INFN Pisa ROADMAP B and SUPER B in Italia Gruppo1 LNF 15Novembre, 2005.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
SLHC Phase I & II Upgrades G. Darbo - INFN / Genova Roma, 16 March 2008 o SLHC Phase I & II Upgrades Roma, March 16 th, 2008 G. Darbo - INFN / Genova Agenda.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
Lina, Paolo, Tonino, Riccardo.   An assessment of the need for a photo-production facility and its design  The neutron part should not exceed 20 pages.
Project IOLI Practical exemple in Italy and in Sicily Il presente progetto è finanziato con il sostegno della Commissione europea. L’autore è il solo responsabile.
IBL – Attività e Richieste G. Darbo - INFN / Genova ATLAS Italia - Bologna, 17 June 2009 o IBL – Attività e Richieste CERN, July 7 th, 2009 G. Darbo -
1 CSN I, ROMA 30-31/1/2012 AGPSilvia DALLA TORRE ERC Advanced Grant 2012 : PROPOSAL “Advanced Gaseous Photon detectors for Hadron Physics Investigation”:
MSc in Communication Sciences Program in Technologies for Human Communication Davide Eynard Facoltà di scienze della comunicazione Università della.
G. RizzoAttivita’ 2009 in GRI per SuperB-SVT - 18/6/20081 Attivita’ finalizzate alla stesura del TDR in 2-3 anni R&D sulle 3 opzioni per Layer 0: –CMOS.
Sommario richieste CSN1 Consiglio di Sezione 28/06/2013 Attilio Andreazza.
Riunione CSN1, Roma, Aprile 2011F. Bedeschi, INFN-Pisa 1 CMS Upgrades Relazione referees  Commenti generali  Proposte dettagliate:  Pixels  RPC  DT.
ATLAS Itk Mario Paolo Giordani (Università di Udine & INFN)
Compositi per ATLAS Overview del processo per la costruzione supporti per ATLAS Tempistica.
WRITING – EXERCISE TYPES
MPGD_NEXT Miscellanea: MILESTONES 2016 & 2017 SBLOCCO S.J.
G.Alimonti INFN, Milano 12 Gennaio 2011
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Richieste 2017 HMPID e LHC_IF
Jobs and occupations What do they do?
Alberto Masoni EU-IndiaGrid Project Manager INFN Sezione di Cagliari
Gruppo storage CCR Nuove attivita’ 2007 Alessandro Brunengo CCR - Roma
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Gagliardi Università degli Studi e INFN Torino
RD_FASE2: Mechanics and Cooling Pixel R&D Projects Meeting Milano, 8 giugno 2015 Simone Coelli, Andrea Capsoni, Carlo Gesmundo, Mauro Monti, Ennio Viscione.
Comunicazioni Riunione ATLAS-Italia
Assegnazione risorse Stato INFN CNAF,
Programma di attività e preventivo di spesa 2013
JetWalk: Agenda e review committee
R&D fase 2 – RPC 4st meeting
SVT Attivita’ 2013 Dopo il TDR entriamo in fase di costruzione.
Responsabilita’ INFN in Atlas
le Attivita' Computing Analisi Muoni: Detector(s) e Trigger
Partecipazione Italiana a Belle2
Accelerator Disision March 3rd 2015
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
Programma di attività e preventivo di spesa 2013
Riunione di ATLAS Italia - BO
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
Proposal for the Piceno Lab on Mediterranean Diet
General Office for Airspace
SWORD (School and WOrk-Related Dual learning)
Italy Recent Media Mentions The 2017 Report’s Policy Recommendations
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Wikipedia Wikipedia è un'enciclopedia online, collaborativa e libera. Grazie al contributo di volontari da tutto il mondo, Wikipedia ad ora è disponibile.
Transcript della presentazione:

SLHC Phase I & II Upgrades Phone meeting, March 25th, 2008 G. Darbo - INFN / Genova Agenda Page: http://agenda.infn.it/conferenceDisplay.py?confId=1349

ATLAS Upgrade Week - Highlights AUW – 23-27/2/2009 – Indico agenda: http://indico.cern.ch/conferenceDisplay.py?confId=45460 Some statistics: 29 Sessions ~232 Talks ~232 People? AUW themes: Moving from R&D based towards a systematic project Phase II LoI - 2010 Layout Task Force Joint TDAQ/Systems effort kick-off IBL TDR - Begin 2010 AUW News – Phase I delayed by one year: 2013 2014 M. Nessi reported L. Evans words. Next AUW 2009 – CERN 26-30/10/2009 2010 – two AUW (proposed end of September in Prague)

LHC: Luminosity Plot Peak Luminosity Plot – Before LHC Accident SLHC II New injectors + IR upgrade 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2023 2022 2024 2025 2026 SLHC I New Triplet IBL Installed L= 3 x 1034 cm-2s-1 Shifted by one year Ref. F. Zimmermann - AUW SLHC Phase I delayed by one year 2014 Ref.: M. Nessi (AUW) from L. Evans Luminosity Plot Ref. R. Garoby – LHCC 1/7/2008 – http://indico.cern.ch/conferenceDisplay.py?confId=36149

SLHC

R&D  Systems November 2008 - Total of 34 proposals or expression-of-interest submitted since 2005. ~210 Institutes participating (multiple times), 7% of INFN Two new EoIs: TDAQ upgrade (Norman Gee) – see atlas-tdaq@cern.ch mail archive (http://groups.cern.ch/) LV1 track trigger (Richard Brenner) – see: https://edms.cern.ch/document/985096 R&Ds working groups as backbone of LoI mapped into LoI sections.

Inner Tracker R&D EoI, Proposal presented to USG Approved by Executive Board Status – November 2008 Inner Detector Strips Pixel

Calorimeter, Muon & Other R&D EoI, Proposal presented to USG Approved by Executive Board Status – November 2008 Trigger, Elec, … Calorimeter Muon

LoI – Time Line Immediate Needs: Propose LoI outline – going through today to get first feedback Set up an editorial board - 2 main editors Review working groups, overall (sub-)systems contacts – appoint chapter editors Include the current R&D projects in working groups as appropriate Spot critical issues Ref. M. Capeans – Upgrade PO & SG -3/3/2009

LoI Structure Sub- systems Performance Installation Responsibilities Intro & Overview Sub- systems Performance Installation Ref. M. Capeans Upgrade PO & SG -3/3/2009 Responsibilities

Current ID performance Layout Task Force 3 ID strawman layouts for SLHC have been studied so far (2006, 2007, 2008) Limitations have shown-up at <<400 pile-up events A LoI for SLHC is due early 2010, we therefore must converge on a defendable ID layout by then. Current ID performance Task Force: Chaired by: Leonardo Rossi Report in 6 months First ideas and strategy at AUW Ref. L. Rossi - AUW

Single Muon Triggers ATLAS No control of rate for pT>20 GeV/c Ref.: T. Kawamoto Muon Week - 28/10/2008 No control of rate for pT>20 GeV/c Physics rates still OK pT>20 GeV/C CMS : L3 - ATLAS : EF Use track trigger? CMS going this way, ATLAS is still studying a solut6ion.

TDAQ & LV1 SLHC Phase I SLHC Phase II Ref. N. Gee – AUW & R. Brenner ATUW (Nikhef) SLHC Phase I Several detectors have limited event volume; L1A rate at 3 x 1034 will be limited to 50-60kHz at 100% traffic levels Some detector inefficiencies as latency approaches 2.5 µs SLHC Phase II Several detectors can use fast clear or trigger directly from level 1.5 For most, 6.4 µs latency is fine. Exception is muon 3.2 µs Options to improve muon trigger rates by adding chambers Write R&D proposal for TDAQ upgrade work Define document structure, appoint chapter editors,… Covering Phase-I and Phase-II, plus evolution Level-1 Trigger Phase I topological upgrade – (Still need to prove that this is useful…) Phase II – Track Trigger: both simulation and hardware studies underway  progress at the AUW  need lot of efforts for answers to LoI

Sestri Levante Incontro a Sestri Levante: 50 partecipanti: Sito WEB: Locazione decentrata Alitalia e blocco per incidente dell’autostrada la hanno resa più remota Ma la tranquillità del luogo ha permesso una maggior concentrazionesui temi in discussione. 50 partecipanti: ATLAS, CMS, CSN1 (Nando + referee), Umberto e Sergio sono intervenuti in remoto (la GE li ha trattenuti a Roma). Sito WEB: http://iacu-2008.ge.infn.it/

Sestri Levante - Participants See report to CSN1

Outcome: ATLAS, CMS & INFN Upgrade degli Esperimenti Per entrambi gli esperimenti la sfida sono l’ottenimento di prestazioni “simil LHC”: Prestazioni del tracker interno e L1 trigger sono la difficoltà maggiore. Il management INFN ha preso atto dell’esistenza di una importante comunità Italiana che guarda al futuro di LHC (SLHC) ATLAS e CMS @ Phase I ATLAS: B-Layer – “Impossibile” sostituirlo -> IBL CMS: Il rivelatore a Pixel ha meno “vincoli” -> varie opzioni possibili R&D per SLHC In futuro gli R&D in cui il CERN si impegnerà dovranno essere finalizzati alle necessità degli esperimenti che per gli upgrade. Nell’INFN gli R&D devono essere “strategici” per la partecipazione delle comunità negli upgrade degli esperimenti. Partecipazione a SLHC di entrambi ATLAS e CMS, ma concentrazione delle attività per mantenere visibilità. La CSN1 ha una tasca per il 2009… ai referee il giudizio sulle attività…

IBL Organization, INFN interests, money. IBL

IBL Organization Project Leader (IBL-PL) endorsed by ATLAS CB Technical Coordinator (IBL-TC): H. Pernegger Organization structure in preparation: Project is an ATLAS Upgrade for Phase I Thinking at working groups (WG), technical board (TB), steering group – covering all project (Pixel CORE and TC) Report line to Pixel Institute Board (PIB) and Upgrade Project Office (PO) TDR – Early 2010 2 editors (one senior) with overall knowledge of the Pixel detector and involved/interested in the IBL project. Try to reduce options for TDR: Cooling (CO2 – C3F8): 2 kW CO2 cooling plant to gain experience set up at CERN Sensors: reduce options, define requirements and specifications.

INFN Possible Interests - I FE-I4 New front-end chip. 50x250µm2 pixels, 26.9k pixels, 160 Mb/s R/O. 5 labs: Bonn, CPPM, Genova, LBNL, Nikhef Sensors 3D & Planar (n-in-n) sensors are the options: 3D more charge after life dose (>3x1015 n/cm2) but scale production needs demonstration. Planar known technology but high Vbias (>800÷1000V) is a system issue. Genova (with IRST in 3D) & Udine (3D & Planar) in ATLAS. IRST-FBK, TN & TS in IGRV (3D sensors) Stave mechanics Low density carbon foam structure with titanium or carbon fiber (CF) pipe option. CF pipe advantages: low X0, thermal matching with carbon foam support, non corrosion issues. Good progress in CF pipes: tested at 150 atm, no leakage (<10-7 atm•cc/s). New technology: need qualification for micro-crack development, develop fittings, find second source for production Milano actively involved in the pipe R&D and in the stave design.

INFN Possible Interests - II Stave Flex Hybrid Genova interested in the development of the “Stave” Flex Hybrid. Nice complement of the stave design in Milano to which the component is tightly connected. Module/Stave Loading & QC Genova interested in a role (to be better defined) in the module testing/stave loading & qualification process. PP2 Milano interested in the PP2 deliverable. They will provide it, if design need minimum changes (no redesign of the board). Other deliverables / activities Under investigation possible contribution on other parts: ROD? Existing ROD could be used with DSP code rewriting and FPGA reprogramming, but new design could bridge to SLHC design & improve architecture (slow VME bus access, more memory). Bologna considering ROD deliverable, Italian leading role in Pixel DAQ could play a role. Opto-link: opto-chip design if a redesign is needed? Milano may contribute.

IBL – Costi e Finanziamenti Costo e finanziamento del progetto in via di definizione Il costo del progetto in via di definizione. Presentato all’RRB un piano per 4.4MCH nei MOF-B (2009÷2012) che copre il costo “Pixel CORE”. Altri finanziamenti tramite nuovi laboratori e MOF-A (Installazione. Cooling plant, new beam-pipe) coprono il rimanente 50%. L’INFN è supposto contribuire in modo diretto per il 25% dei 4.4 MCH dei MOF-B e indiretto tramite I MOF-A. MOF-B del 2009. Sono disponibili 134 k€ (201 kCH) di sj. Opportuno avere una definizione del progetto (interim MoU) prima di sbloccare la somma. Responsabilità italiane e del resto della collaborazione in via di definizione.