Stato di MEG Roma 1 Luglio 2009
Detector outline Experimental method Stopped beam of 3 107 /sec in a 150 mm target Solenoid spectrometer & drift chambers for e+ momentum Scintillation counters for e+ timing Liquid Xenon calorimeter for detection (scintillation)
Run esperimento al completo nel 2008 TCs DCs Run esperimento al completo nel 2008 per 3 mesi NaI: p charge exch,reaction on p p0 55/83 MeV g back to back trigger automated mover E/E ~5-6% () C-W: “Essential Tool” Li (17.6, 14.6 MeV) + B (4.4, 11.7, 16.1 MeV) lines – Energy + Timing Calo. C-W NaI
DCH: numero di tracce ricostruite per evento Namely the fraction of events with at least one reconstructed track at high momentum is a measure of relative (not absolute) tracking efficiency Average absolute efficiency 30% Incremento frazione di etano
Da gennaio test di camere complete in „acquario“ • construction of 2nd pressure control system for laboratory → operate „aquarium“ independently from MEG pressure control system reminder: • „aquarium“: • setup to operate two dc modules with He / C2H6 as counting gas • within helium atmosphere Malte Hildebrandt MEG Review Meeting, 18.02.2009
Piano HV & terra incollato su fibra di carbonio dc01A Nessun’altra scarica (oltre al punto di arrivo delle HV) vista esternamente ma scariche su singoli fili vicino al bordo il problema e’ interno alle camere Piano HV & terra incollato su fibra di carbonio Strategia: Verificare che la scarica avviene in quel punto (no fino ad ora ma la penetrazione e’ lenta) Aprire tutte le camere e cambiare i PCB PCB ridisegnati totalmente da C. Cerri: percorso HV totalmente dentro vetronite fino al filo Test a lungo termine delle prime due camere ricostruite 6 nuovi PCB pronti da dicembre dello scorso anno colla Niente colla ! Penetrazione He Niente colla
1 Aprile 2009 !!
2 camere con PCB nuovi in He/He-Etano a tensione 2KV dal 10 Maggio: nessun problema Piu di meta’ delle camere gia’ modificato Si prevede di terminarne la costruzione nella prima meta’ di agosto e poi di inserirle in esperimento
Possibile calibrazione con fascio di positroni Use of tuned monochromatic positron beam being investigated as a means of e.g. studying our positron spectrometer tracking efficiency vs. emission angle or momentum, with high statistics, in a momentum range equivalent to real MEG- conditions!!! Mechanism: positron-Nucleus elastic scattering from light nuclei at around Pe ~ 50 MeV/c “Coherent” nuclear recoil, spin-effects, magnetic terms all ~ negligable nuclear form-factor introduces a small effect X-sections “well known” basically “Mott-scattering” Reality: MEG beam can be tuned to give ~ 50 MeV/c e+ with a max. rate of ~ 8· 108 e+/s at 2mA proton current with ΔP/P ~ 7% FWHM obviously would reduce ΔP/P to achieve “monochromaticity” though at the cost of rate. Wien-filter does not work at this momentum to sufficiently separate e+ from + but a 2mm CH2-degrader at the collimator system in front of BTS DOES! Carbon target ρ ~ 2.1 g/cm3 t < 1cm thick, and 107 e+/s Integrated X-section: 30° < Δθ < 120° & Δφ = 2.5 mbarn ~ 1300 events/s
Simulazioni MC
Analisi dati 2008 attualmente in fase finale: termine per inizio agosto + articolo
Fondi ? < 5 0.8
Sensibilita’ ??
Schedule 2009
Conclusioni (dal 20 marzo 2009) L’aver visto il decadimento radiativo dimostra la capacita’ di vedere il decadimento me g . Si tenga presenta che MEGA non era riuscito a vederlo nei dati normali se non con estrema difficolta’. Le risoluzioni non sono ancora quelle definitive Puntiamo ad avere risultati per quest’estate OK (agosto) Non prenderemo dati senza la dimostrazione sperimentalmente che le camere modificate funzionano non chiediamo ancora lo sblocco del s.j. di m.e. ma solo 6 K€ di consumi di Genova per le modifiche alla lettura degli APD OK: sblocco SJ La meccanica delle camere attuali e’ pero’ molto buona e il problema ci sembra legato solo alla distribuzione dell’alta tensione OK Non dobbiamo piu’ avere interferenze sul fascio dopo quest’anno e prendere dati anche nel 2011
Sblocco ME sj Ge 17 Le 5 Pi 50.5 Pv 12.5 Rm1 22.5 Tot 107.5 Nuova richiesta 30 K costruzioni apparati Pisa (pompa Xe liquido) Assegni di ricerca/ Post Doc PSI