RRB - Ottobre 2006 Aggiornamento tempistica (dall’ Atlas week) Situazione finanziaria complessiva di Atlas Bilancio 2007 CtC M&O-A M&O-B 9/10/2004 L. Mandelli.

Slides:



Advertisements
Presentazioni simili
GuidoTonelli/Università di Pisa ed INFN/Gruppo1/Roma Cosa contengono Stime/richieste per il 2003 suddivise per sub-detector Criteri di suddivisione.
Advertisements

P. Capiluppi Organizzazione del Software & Computing CMS Italia I Workshop CMS Italia del Computing & Software Roma Novembre 2001.
GLAST Italia 1 Riunione Glast Italia – Pisa, 18/02/2002 GLAST:Stato della collaborazione internazionale ed italiana R.Bellazzini I.N.F.N.- Pisa.
Paolo Bagnaia - 10 January invecchiamento. elettronica di read-out; shielding (MDT, RPC, …); HLT + DAQ; _________________________ NB :non include.
Fondi Comuni LHC e attivita’ RRB-SG M. Morandin CSN1 – 10 ottobre 2005.
1 referee-ATLAS CSN I, Roma 2-3/4/2007 RELAZIONE DEI REFEREE DI ATLAS F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 3 aprile 2007.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
LHCB * Stato del rivelatore MU G. Carboni * Stato del RICH M. Sannino * Stato del Trigger L0 calo e L1&HLT U.Marconi / D. Galli G. Martellotti CSN1 22.
1 referee-ATLAS CSN I, Roma maggio 2007 RELAZIONE DEI REFEREE DI ATLAS F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 14 maggio 2007.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
G. Costa, Roma 16 maggio 2006 Commissione I LAr: status report 1.
1 TASK – Necessità fino alla fine dell’anno connettorizzaz. e test dei cavoni HV2 mu test sistema HV (accensione sistema globale)2 mu* (2 da contingenza)
1 LHCB * Stato dell’esperimento e analisi finanziaria globale G. Martellotti 30 m * Stato del rivelatore MU - Camere (MWPC/GEM) C.Forti/A.Cardini 30 m.
R.N. - Referees LHCB-CSN1 09/021 LHCB : proposte dei referees Giulio D’Agostini Chiara Meroni Rosario Nania.
News da LHC… *** Discussion title: CMS Commissioning Notes from 09:00 meeting Current fill (1182) has now been in stable beams for >12 hours. Delivered.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
G. TONELLI / GR1-ROMA 5/6 APRILE CMS: PRESENTAZIONE DOCUMENTI RRB18.
LHCB G. Martellotti CSN RRB Ottobre 2004 # gestione overcosti RICH e MU # - profili dispesa CORE e CF - M&O A.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
COSTO (KCHF) # item KCHF Rivelatore2.352 Electronica Front-end 684 Sistema HV and LV 580 Supporti 210 Installazione 340 Monitoring 60 Servizi 120 Totale.
1 M&O cat A - consuntivo provvisorio modifica del preventivo 2004 M&O cat B ancora non sono previsti. (saranno presentati al RRB di Aprile) Profili.
CSN Maggio 2005 P. Capiluppi Il Computing Model (LHC) nella realta’ italiana u I Computing models degli esperimenti LHC gia’ presentati a Gennaio.
M. Citterio Roma 10 Gennaio 2006 Costo per l’upgrade del Calorimetro Elettromagnetico ad Argon Liquido di Atlas Mauro Citterio INFN Milano.
8 Maggio 2002Workshop CCR - La Biodola W2K Coordination Group & HEP-NT Report Enrico M.V. Fasanelli Gian Piero Siroli.
Preparazione RRB Commissione Scientifica Nazionale I 1-2 aprile 2003 S. Patricelli Consuntivo fondi M&O 2002 Divisione tra subdetectors dei fondi extra-CORE.
- Referees LHCB-CSN1 09/041 LHCB : proposte dei referees Giovanni Batignani Chiara Meroni Rosario Nania.
1 referee-ATLAS CSN I, 9/10/2006 ATLAS – MoF-B 2007 F. Bedeschi, R. Carlin, S. Dalla Torre, N. Pastrone 9 ottobre 2006.
3 Aprile 2007 RRB - Aprile 2007 Situazione finanziaria complessiva di Atlas Bilancio “Baseline + CtC” M&O-A Bilancio consuntivo 2006 Bilancio preventivo.
Aggiornamento su - stato generale del funding / firme del MoU - ultime stime dei costi di LHCb dopo la riottimizzazione dell’apparato e la scelta dei fotorivelatori.
Presentazione dei documenti inviati all’RRB e piani futuri CSN1 - Roma 14 Ottobre 2002 S. Patricelli.
LHCb – RRB aprile 2006 MoF-A (previsioni 2007) MoF-B Stato finanziario dell’esperimento Stato dei finanziamenti INFN e necessita’ CSN1 – 4 aprile.
LHCb - RRB20 – aprile 05 (Stato dell’esperimento) Finanziamenti CORE Stato dei MOF-A Stato dei Fondi Comuni MoU per i MOF del Core Computing CSN1 – P.Campana.
Referees LHCB-CSN1 04/051 LHCB : proposte dei referees Giovanni Batignani Roberto Ferrari Chiara Meroni Rosario Nania.
Guido Tonelli / Gr1-Roma RRB19.
G. TONELLI / GR1-ROMA CMS: PRESENTAZIONE DOCUMENTI RRB16.
Mobilità tra i Paesi del Programma KA103 A.A. 2014/2015 (KA103) Mobility Tool+ e il Rapporto Finale Claudia Peritore Roma luglio 2015.
GuidoTonelli /Gruppo1/Roma/16Maggio RRB20 Stime preliminari per il budget di costruzione del Piano finanziario. M&O-A e B Stime.
Presentazione documenti inviati al RRB ( 8 Ottobre 04) Commissione Scientifica Nazionale I 12 ottobre 2003 L.Mandelli Punti di rilievo nella preparazione.
6/4/2004 S. Patricelli - CSN1 - Roma 1 Preparazione RRB di Aprile Addendum al MoU per HLT/DAQ (CERN-RRB )* Consuntivi 2003 M&O (CERN-RRB
Presentazione documenti inviati al RRB ( Ottobre 05) Commissione Scientifica Nazionale I 10 ottobre 2005 M. Livan on behalf of L.Mandelli Punti di rilievo.
ATLAS maggio 2005 CSN1 17 Maggio 2005 L.Mandelli Breve aggiornamento : Stato di Atlas e Atlas Italia RRB: Aprile 2005 Piano finanziario complessivo di.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
LHCb – RRB ottobre 2006 MOF-A MOF-B Stato dei Common Funds CSN1 – 9 ottobre 2006 – P.Campana.
INFN-ITSupgrade meeting CERN, 24 Aprile 2013 V. Manzari Agenda:  Stato del progetto con particolare riguardo alle attività di nostra pertinenza  Proposta.
G. TONELLI / GR1-ROMA CMS: PRESENTAZIONE DOCUMENTI RRB.
ATLAS: Stato dell’esperimento ed analisi finanziaria CSN1 - Catania 18 Settembre 2002 S. Patricelli.
MS - NA62 TDAQ INFN – Settembre 2011 TDAQ in generale Distribuzione clock/trigger: progetto definito, moduli finali in arrivo (?), installazione prevista.
25 giugno 02S. Patricelli - CSN1 - Frascati1 zCosa coprono i MOF-B per ATLAS zCriteri di suddivisione tra le Funding Agencies zCome si gestiscono zQuote.
CSN1 - Lecce - 22/9/03CMS referees1 Relazione Referees CMS R. Calabrese P. Campana M. Dell’Orso M. Morandin.
Presentazione documenti inviati al RRB e piani futuri Commissione Scientifica Nazionale I 13 ottobre 2003 S. Patricelli Punti principali in discussione.
Relazione referees di ATLAS, Trieste F. Bedeschi, INFN-Pisa 1/19 Relazione referee di ATLAS  Stato generale  Stato dei progetti italiani  Discussione.
G.Batignani stato M&O-A Situazione RRB aprile 2010 vs ottobre 2009 Issues (e confronto con informazioni dai responsabili nazionali italiani) In discussione.
Rapporto del gruppo di lavoro sui criteri richiesti per essere autori di Atlas Italia G. Carlino, S. Falciano, L. Mandelli 5/30/2016.
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Referees di ATLAS-CMS: commenti sulle attività di upgrade M.Grassi S.Miscetti A.Passeri D.Pinci V.Vagnoni Sulla base di quanto presentato nell’incontro.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
G.Batignani Report RRB - LHC 1. SG agosto riepilogo finanziario M&O-A 2. RRB ottobre discussione generale peculiarità singoli esperimenti 122.
Upgrades per HL-LHC di ATLAS / CMS Relazione dei referees M.Grassi, S.Miscetti, A.Passeri, D.Pinci, V.Vagnoni.
Futuro di EGI EGI è menzionato esplicitamente nel draft delle nuove calls EU ( H2020 ) Da ultima versione (per me) data 18-9 di –HORIZON 2020 – WORK PROGRAMME.
CSN1 - CMS Referee Report P.Giannettii - INFN / Pisa Ferrara, 20 maggio 2007 CMS - Relazione dei Referee G. Bruni, A. Cardini, P. Giannetti, M. Grassi,
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
M&O-A exp LHC G.Batignani
Situazione M&O-A exp LHC G.Batignani
Gagliardi Università degli Studi e INFN Torino
Comunicazioni Riunione ATLAS-Italia
R&D fase 2 – RPC 4st meeting
Atlas Milano Giugno 2008.
Transcript della presentazione:

RRB - Ottobre 2006 Aggiornamento tempistica (dall’ Atlas week) Situazione finanziaria complessiva di Atlas Bilancio 2007 CtC M&O-A M&O-B 9/10/2004 L. Mandelli

9/10/2004 L.Mandelli -CSN1 2 Installation schedule version 8.1 (draft)

9/10/2004 L.Mandelli -CSN1 3 Overall financial situation Baseline 468 MCHF Cost-to-Completion (CtC) for the initial detector 68 MCHF Main funding issues today Outstanding contributions to the baseline CP (Russia+ JINR(5);Canada(1.5);USA(1);China(0.3).. 9 MCHF Pledged CTC contributions 62.7 MCHF. Missing 5.3 MCHF (NB: Situation looks rather good due to 5 MCHF more given by CERN;

9/10/2004 L.Mandelli -CSN1 4 Unfortunately as already warned at the April 2006 RRB there are new extra cost for a total of 4.4 MCHF. CB chair ha nominated an audit Committee ( Bethke; Mandelli; Oram) who looked into the overcosts (report available) SystemItem Item Over Run System Over Run System Total Cost System Over Cost MCHF % Magnet % Technical Coordination % Muon Big Wheels1.39 TCn installation manpower efforts at Point LArCC project % ATLAS % Further delays in installation work beyond August 2007 could require additional resources for manpower to be paid.

9/10/2004 L.Mandelli -CSN1 5 Strategy proposed to the RRB to cover the remaining funding gap, including the new CtC 1)Urge all FA to fulfill their baseline and Common Fund contribution according to the Construction MoU 2) Urge all FA to pledge their full CtC share as determined in October 2002 As CERN has committed 5 MCHF above its calculated share, this would cover the new 4.4 MCHF additional CtC costs 3) As a fallback, extend the annual member fee for one or two years more (2007 and 2008) The present budget request for 2007 includes this as an option, to be decided by RRB in its April meeting, should it become necessary

9/10/2004 L.Mandelli -CSN1 6 Projected Budget Balance ( CERN-RRB Table 7) Magic: the assumed deferral income covers part of the missing funds. If 4 MCHF not found cut again on HLT processors

9/10/2004 L.Mandelli -CSN1 7 Updated Baseline Commitments Evolution (%) Note: TDAQ re-baselined in accordance with CERN-RRB (initial detector)

9/10/2004 L.Mandelli -CSN Construction Budget CERN-RRB _CtC Table 10 Committments  Core and CC-A MCHF  C&I MCHF  CC-B MCHF Italy:  CtC: CC (A-B) + C&I : MCHF Paid4.000 MCHF Difference MCHF Magnet overcost MCHF Total debt pledged2.288 MCHF C&I and CC-B MCHF CC-A MCHF1.476 ME m.s. Contribution0.150 MCHF (to be decided in April) TOTAL MCHF1.573 ME

9/10/2004 L.Mandelli -CSN1 9 -Base: Memorandum M&O (1/05/ /12/2011) -A : CP : Servizi tecnici al point1, Servizi generali, Magneti, Criogenia, TDAQ. Discusso dallo “ scrutiny group ”. Richiesta 2007: MCHF (2006: MCHF) Power in. La divisione si basa sugli autori con “PHD” : 2007 : 172/1471 = 10.43% (final ?) 2006 : 145/1320 = 11.0% 2005 : 150/1328 = 11.3% 2004 : 144/1301 = 11.0% -B : sottositemi (aree di assemblaggio (SR1;B180;B191); consumi specifici sostituzioni. Discussi negli IB. RRB “ prende visione” Richiesta 2007: 6.98 MCHF (2006: MCHF) Divisione sulla % CORE nei sottosistemi. In corso di revisione nel gruppo OTSMOU -C Covered by Cern as host lab M&O 2007 ( CERN RRB )

9/10/2004 L.Mandelli -CSN1 10 totaliINFN kCHF INFN kEuro  oduli Euro A10727 (*)911(**) ID LAr Tiles Mu Totali-B Totali (*) Senza costo del power (**) In kind sottratto : kCHF = kE M&O Summary

9/10/2004 L.Mandelli -CSN1 11

9/10/2004 L.Mandelli -CSN1 12 M&O-A ( CERN RRB ) Power non compreso Cifre in MCHF  M&O Category A Total  Consumi sul rivelatore e Cryogenia; Magnete: operazione e ricambi; controlli; power supply Gas: mantenimento e consumi generali non detector specifici) Sistemi e liquidi di raffreddamento ( non detector specifici) Criogenia esterna: operazione e ricambi (2.535 MCHF) Sistemi di movimentazione, idraulici e sicurezza generale Operazioni di movimentazione (0.450MCHF) Supporto tecnico generale al pit e TDAQ (0.510MCHF) Vuoto e beam pipe Counting room  Segretariato, Economato, Pubblicazioni  Comunicazioni TDAQ e TC ; Videoconferencing (0.110 MCHF)

9/10/2004 L.Mandelli -CSN1 13  Core Computing Servizi centrali generali ( processing; produzione; user support 13.4 (FTE) x 88kCHF + 1 FTE x 122kCHF + 2 FTE x 71kCHF = 1.443MCHF Contributo INFN: 1.8 FTE x 88kCHF = kCHF = kE. Il più alto in kind dopo USA (3FTE)- Dettaglio del contributo 06 disponibile  Online computing Management system (0.550MCHF); sostituzione processori (0.625MCHF); licenze; infrastrutture  Facilities Bldg. 180, TDAQ pool  Laboratory operations Workshop TDAQ Lab equipment  General Services Ventilazione (0.364MCHF);Trasporti, Cranes (0.540 MCHF); Survey (0.2MCHF) Outreach (0.2MCHF)

9/10/2004 L.Mandelli -CSN1 14 MOF-B Inner Detector kCHF k€

9/10/2004 L.Mandelli -CSN1 15 M&O-B 2007 IDGEN IDGEN (kCHF)  360 SR1 refurbishment (upgrade)  183 consumi SR1  295 cooling  (3% costo core,10% rinnovo liquido, extra coolant per cavi (250kchf))  110 Environmental Gas (N2, CO2)  55 stores  636 manpower  (installazione/commissioning 7.5, evaporative Cooling 2, monophase Cooling 1, SR1 1)  50 spares off detec electr. (mainly DCS items)  TOTALE 1690KCHF

9/10/2004 L.Mandelli -CSN1 16 M&O-B 2007 Pixel  Dettaglio Pixel (kCHF)  30 consumi SR1  125 Spare off detec. electr.  (5%CORE crate+rod, 1.5%CORE per PS)  100 subdetectors spares  (extra production type0 cables)  40 Stores  300 manpower  (installazione compressa, lavoro squadre in parallelo)  (+16 FTE pagati dagli Istituti)  Totale 595 KCHF

9/10/2004 L.Mandelli -CSN1 17 ID M&O Final Payments in 2005  Main cost driver are:  SR1 operation  Services (exp. cooling) Budget was 1065

9/10/2004 L.Mandelli -CSN1 18 LAR M&O Piano di spesa (K CHF) : L’incremento nel 2007 rispetto al 2006, risente della richiesta di 350 KCHF per “spares FE”. In realtà gia’ anticipato dal CERN. La prima valutazione dei costi M&O per il 2007 ( maggio 06) e’ stata ridotta del ~ 14 %, per tener conto della nuova schedula di LHC.

9/10/2004 L.Mandelli -CSN1 19 Meccanica5 Acquisti/Lavoraz. meccanic., saldature….. Impianti Gas1 Affitto bombole e racks Sist. Criogenici30 Manten. sist. Crio., gas x tests, slow control Sist. Cooling30 Coolling PS, FE crates, mantenim., upgrades Elettronica160 Strumentaz per laboratori, affitto pool, RO, manuten., upgrades Contr. DCS,DSS30 Componenti per ELMBs, sensori, sniffers PS(LV,HV)200 Manutenzione, upgrades Magazzino50 Componenti meccanici, elettrici, etc… Gestione Aree30 Trasporti,logistica, pulizia aree sperim. Comunicazioni4 Telefoni portatili, videoconferenze Manpower280 Personale tecnico,ingegn. esterno/gruppi Elettronica FE350 Spares, rimborso Totale 1170 kCHF Italy : 57 kCHF LAr- M&O-B Dettaglio Carry Over kCHF

9/10/2004 L.Mandelli -CSN1 20 M&O Tile Cal Year M&O(KChF) Spent * 2006 budget M&O reduced from 625KChF (2003 estimate) to 371KChF budget. From 600 KChF (2005 expectation for 2007), about 800 KChF are needed. (Late commissioning of the fLVPS has produced a spill of expenses in 2007 of about 200KChF ) * Projections to the end of the year

9/10/2004 L.Mandelli -CSN1 21 Maintainance41% Manpower33% E-pool rentals15% Spare parts, store items10% The italian share is 7.6% Beyond 2007 The fLVPS seems now in good shape, after the problems encountered at the beginning of this year. If this is the case, the foreseen M&O in 2008 and following will come back to the planned value. TileCal M&O 2007 Details

9/10/2004 L.Mandelli -CSN1 22 Muons M&O Budget for 2007  Mechanics 150 K Repairs and maintenance  Gas consumption and gas system maintenance 355 K Very accurate estimate from the LHC Gas Group  Cooling system 25 K Consumables and maintenance  FE Electronic spares 100 K Strong reduction (was 550)- Agreement CERN-Israel  Standard electronics (HV-LV) 100 K spares  Standard electronics 110 K E-pool  Communications 5 K  Hired manpower 330 K Installation and commissioning work (regie + subsistance)  Total 632 K

9/10/2004 L.Mandelli -CSN1 23 M&O Final Payments in 2005  Budget for 2005: 240 k  Income in 2005: 220 k  in kind 15 k  Expenditures: 381 k Due to open commitments from 2004 paid in 2005)

Spares transparencies

9/10/2004 L.Mandelli -CSN1 25 Core computing in-kind in 2007 Czech Rep:0.4 FTE x 88 kCHF/FTE = 35 kCHF IN2P3:1.0 FTE x 88 kCHF/FTE = 88 kCHF BMBF:0.9 FTE x 88 kCHF/FTE = 79 kCHF MPI:0.3 FTE x 88 kCHF/FTE = 22 kCHF Israel:0.2 FTE x 88 kCHF/FTE = 18 kCHF INFN:1.8 FTE x 88 kCHF/FTE = 158 kCHF Poland:0.10 FTE x 88 kCHF/FTE = 9 kCHF Russia:0.3 FTE x 88 kCHF/FTE = 22 kCHF JINR:0.4 FTE x 88 kCHF/FTE = 35 kCHF Taipei:0.1 FTE x 88 kCHF/FTE = 9 kCHF UK:1.5 FTE x 88 kCHF/FTE = 132 kCHF US:3.0 FTE x 88 kCHF/FTE = 264 kCHF TOTAL: 9.9 FTE x 88 kCHF/FTE = 870 kCHF

9/10/2004 L.Mandelli -CSN1 26  Help desk and user support Guido Negri (CNAF) 0.4FTE Computer and SW documentation and training _ Stefano Antonelli (Bo) 0.4FTE Management of the ATLAS VO on the Grid  Alessandro De Salvo (Ro1) 0.2FTE Alessandro Barchiesi (Ro1) 0.3FTE Filippo Grimaldi (Bo) 0.3FTE Software Installation on the Grid Alessandro De Salvo (Ro1) 0.2FTE Total 1.8FTE

9/10/2004 L.Mandelli -CSN1 27 Muon M&O B Old Planning

9/10/2004 L.Mandelli -CSN1 28 Muon M&O B New Planning Budget for Electronics spares reduced by 1 MCHF due to contribution from the CERN-Israeli agreement

9/10/2004 L.Mandelli -CSN M&O Sharing