Aggiornamento su - stato generale del funding / firme del MoU - ultime stime dei costi di LHCb dopo la riottimizzazione dell’apparato e la scelta dei fotorivelatori del RICH richiesti spostamenti di fondi - dettagli dello stato del funding dei Mu LHCb # nuova Cost-Funding Matrix G.Martellotti CSN1 – 3 Febbraio 2004 # Approvazione Progetti INTAS (Camere Mu e Aerogel) richiesta sblocco Sub Judice # Fattura M&O-A 2004 richiesta sblocco Sub Judice # Stato del RICH - partenza gara HPD (Clara)
Funding countryMoUNowComments Brazil1.70 MoU not signed China FR(IN2P3) extra engineering effort by Annecy DE(BMBF) MoU to be signed. New MPI request not approved (MPG) (some uncertainty) IT extra contribution to Muon NL Poland MoU to be signed Romania Russia32.5 shifted to machine, CERN partially compensates Spain22 Switzerland UK Ukraine CERN inclu. muon Fe and Russian compensation Total T.N. – RRB Funding situation (MCHF) New : possible increase of 0.450
The LHCb detector Reduced number of layers for M1 (4 2) Reduced number of tracking stations behind the magnet (4 3) No tracking chambers in the magnet No B field shielding plate Full Si station Reoptimized RICH-1 design Reduced number of VELO stations (25 21) Changes were made for material reduction and L1 trigger improvement
SubsystemCost from MoUComment VELO4.82MoU included Pile-Up trigger IT2.47 TT3.40 OT 3 stations RICH9.57New RICH1 8.49 MaPMT analog HPD * Calo15.06 Muon detect.6.93 Muon Fe4.00 L0 Trig2.26 DAQ&CPU(L1/HTL) 5.71 ECS&TFC + C.Infra.2.29 Experiment infra.4.00 Magnet6.00 Updated cost of the experiment (MCHF) Pile-Up trigger added * La scelta definitiva dei foto rivelatori e` posteriore al RRB di Ottobre. Il costo finale del RICH tiene anche conto di un probabile aumento di ~300 kCHF Total rispetto ai costi (non ai fondi) previsti nel MoU) Now all Si TT
Current funding MCHF Current detector cost Balance T.Nakada – RRB : Bilancio : La situazione e` buona ma la “cost-funding matrix” deve essere ritoccata per tener conto dei cambiamenti dovuti alla riottimizzazione di LHCb e dei fondi attualmente disponibili. The LHCb collaboration ask the RRB to support the principle of shifting the funding allocations among different subsystems in agreement with the parties concerned. Two guidelines for the revision: 1)Move first CERN and Common Funds to balance 2)Move national funding among the already committed subsystems senza eventuale aumento Cina
Updated RICH Cost : 8486 underfunding ridotto va ridistribuito Cost-Funding Matrix presentata al RRB di Ottobre (come base di discussione in LHCb) Il RRB ha accettato il principio di ridistribuzione (e non ha ritenuto necessario un addendum al MoU)
Country (subsystem)MoUNew CERN (ST)0.00 0.77 CERN (OT)3.40 0.00 CERN (RICH)1.00 1.19 adjusting for the overall situation CERN (Muon)0.20 0.54 CERN (Online)0.73 2.83 IT (Muon)4.85 extra contribution IT (Trigger)0.80 0.43 due to cost reduction IT (Online)0.50 0.87 increased responsibility UK (RICH)5.70 6.30 UK (Online)0.60 0.00 DE(ST)1.69 1.72 DE(OT)1.92 2.17 DE(Online)1.02 0.00 DE(CF)2.00 1.70 CF (Muon)0.00 0.40 adjusting for no Brazilian funding CF (OT)0.90 0.63 CF (Online)3.50 2.43 CF(Calo)5.31 5.29 CF(reduction)0.00 0.96due to reduced funding adjusting for the RICH cost increase adjusting for the BMBF rejection for the MPI funding request New model for redistribution (MCHF)
Nuova proposta di Cost-Funding Matrix che sara` portata in discussione al prossimo CB di LHCb - Azzerato l’underfunding di ST, RICH, MU - Diminuito l’uderfunding del DAQ (underfunding = ~20% delle CPU) Le CPU saranno comprate piu` tardi possibile (>2005)
MoU Adesso Common funds RICH Muon detector * Trigger Calo DAH/L1&HLT * for electronics spares ( M&O-B) Sommario finanziamenti INFN : (non ci sono novita` rispetto a Settembre)
Funding del rivelatore MU Giugno ‘03 Underfunding 320 kCHF Staging parte di M4 MoUAdesso Non piu` Underfunding No Staging
- MU Coordinatore: P.L. Campana Proposal 5571: Development of muon chambers for LHCb CERN, INFN (LNF, Fi, RM2), MARSIGLIA, PNPI + ITEP (Russia) si guadagna denaro CORE per ~ 60 kCHF per la costruzione di camere al PNPI (il contributo INFN stimato e` di 230 kCHF) assegn : 30 kE (consumo LNF) S.J. alla approvazione - Aerogel Coordinatore: C. Matteuzzi Proposal 5579: Applications of Aerogel in particle physics INFN (Mi), CNRS/IN2P3, BINP + BIC (Russia) si studiera` la possibilita` di avere i 5 cm di spessore dell’ Aerogel in un solo strato. assegn : 20 kE (consumo Mi) S.J. alla approvazione I due progetti INTAS sono stati approvati Chiediamo lo sblocco dei S.J. # e` arrivata la fattura CERN dei M&O-A 2004 ( CHF) - finanziati 40 kE + 25 kE s.j. richiesto sblocco del S.J.