Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Old Milestones: we have even more relaxed our schedule.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

V.I.D.E.O. Video-CV to Increase and Develop Employment Opportunities
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Istruzione, Tirocinio e Lavoro
By: Sofia C, Natalie L, and Ericka E La moda -Fashion.
L’Unione Europea e la Scuola da anni hanno stretto un patto e per colmare il divario di apprendimento fra le diverse realtà didattiche dei vari Paesi,
EMPOWERMENT OF VULNERABLE PEOPLE An integrated project.
FIRST LEGO LEAGUE la challenge 2013 : Nature’s Fury PREPARE. STAY SAFE. REBUILD.
Passato Prossimo. What is it?  Passato Prossimo is a past tense and it is equivalent to our:  “ed” as in she studied  Or “has” + “ed” as in she has.
The letter 1. The parts of the letter:
Richiesta sblocco SJ FTK Sharing costi FTK: grosso sforzo per AMchip05 e AMchip06 in 2013 dentro riquadro viola orizzontale; dentro riquadro verde impegno.
GLI INDEFINITI.
The future Present Continuous Will-future Going to Simple Present.
Giovanni Biondi ICT e trasformazione della Scuola.
VIPIX, pSuperB, (SuperB) Atlas/FTK M. Villa 04/11/2010.
Novita’ FTK da luglio P. Giannetti per il gruppo FTK Review Amchip - lieve cambiamento alla schedule Il problema del cooling ed I tests a punto 1 Test.
I giorni della settimana
PINK FLOYD DOGS You gotta be crazy, you gotta have a real need. You gotta sleep on your toes. And when you're on the street. You gotta be able to pick.
Sezione di Padova Contributo alla costruzione dei layers 6,7 Possibili task per PADOVA:  precedente proposta: R&D della procedura di assemblaggio degli.
1 TASK – Necessità fino alla fine dell’anno connettorizzaz. e test dei cavoni HV2 mu test sistema HV (accensione sistema globale)2 mu* (2 da contingenza)
Stato del progetto RPC Trieste 6 Luglio 2005 Riunione CSN1 R. Santonico.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
G. Martellotti Roma RRB 16 Aprile Presentazione M&O cat A (per LHCb i M&O cat B sono gestiti autonomamente e non sono scrutinati fino al 2005/2006)
Produzione del chip standard cell AMchip03 Per SVT a CDF Breve descrizione dei tests del prototipo e risultati 1.il chip funziona (up to now) 2.ma yield.
SCUOLA ELEMENTARE” G. MAZZINI IIIB
MyEconLab_Univerità degli studi di Milano, corso Prof.ssa Valentina Raimondi How to Access MyEconLab 1.
ECAL (1) Torino intende assumersi la nuova responsabilita’ della costruzione completa delle Mother Boards per il VFE (gia` dati 30 kEuro nel 2003 per 100.
Secondo Circolo di Carmagnola I FRONTESPIZI DEGLI INVITI ALLE SERATE COMENIUS Invitations to the Comenius Evenings 9 febbraio febbraio giugno.
MyEconLab_Univerità degli studi di Milano, corso Prof.ssa Valentina Raimondi How to Access MyEconLab 1.
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
PAST SIMPLE O PRESENT PERFECT?
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
R.N. - Referees LHCB - CSN1 06/021 LHCB : proposte dei referees Giulio D’Agostini Chiara Meroni Rosario Nania.
BE GOING TO.
IL PERIODO IPOTETICO.
MS - NA62 TDAQ INFN – Settembre 2011 TDAQ in generale Distribuzione clock/trigger: progetto definito, moduli finali in arrivo (?), installazione prevista.
 SLP Tests in VME test stand: Saverio – Pierluigi (Daniel)  New test stand: Enrico (Saverio – Pierluigi)  VME Tests versus new test stand tests (Enrico-Saverio-Pierluigi)
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
Simple Sentences in Italian
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Comenius Project “Math is B.E.A.U.” that is Beautiful Easy Amusing Useful ITALIAN WORKGROUP ENNISKILLEN (U.K.) May 2011.
ITALIAN ITALIAN FOR POST GRADUATE STUDENTS 22 nd February 2016 WEEK 1 Aureliana Di Rollo.
Avere Vs. Essere Qual è la differenza e quando li usiamo?
Interessi e richieste finanziarie per IBL. 2 IBL Lay-out 2  Since IBL is an additive layer, its radiation length has to be extremely small  Geometry.
Minimal Emergence of Darunavir Resistance at Treatment Failure: Are Interpretation Algorithms Adequate? Gaetana Sterrantino* 1, Mauro Zaccarelli 2, Maurizio.
University of Pisa - presentation Mauro Dell’Orso University of Pisa.
CALOCUBE SVILUPPO DI CALORIMETRIA OMOGENEA AD ALTA ACCETTANZA PER ESPERIMENTI DI RAGGI COSMICI NELLO SPAZIO 1^ CaloCube meeting Firenze, 20 Giugno 2014.
MM news & status -Final Design Review -NA for NSW -altre attività MM.
STMan Advanced Graphics Controller. What is STMan  STMan is an advanced graphic controller for Etere automation  STMan is able to control multiple graphics.
Futuro di EGI EGI è menzionato esplicitamente nel draft delle nuove calls EU ( H2020 ) Da ultima versione (per me) data 18-9 di –HORIZON 2020 – WORK PROGRAMME.
Do You Want To Pass Actual Exam in 1 st Attempt?.
Status of FTK & requests 2013
ATLAS – CMS – RD-FAS2 Sblocchi e nuove richieste
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
Calorimetro LAr F. Tartarelli Incontro con i referee, Roma, 07/09/2016.
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Comunicazioni Riunione ATLAS-Italia
Assegnazione risorse Stato INFN CNAF,
R&D fase 2 – RPC 4st meeting
Gigi Cosentino - LNL 20 ottobre 2016
ONEDATA - distributed data caching -
Highlights del meeting ESPP di Cracovia Settembre 2012 (FISICA DI G1)
SuperB – Richieste Sblocchi 2008
FTK Report Paola for the FTK Team Martedi’ 15 settembre, Pisa.
Atlas Milano Giugno 2008.
P. Giannetti per il gruppo FTK
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

Status of FTK & requests 2013 Paola Giannetti, INFN Pisa, for the FTK Group ATLAS Italia, Sep 5, 2012 Old Milestones: we have even more relaxed our schedule Status of FTK work Money requests for 2013 NEWS & Future steps TDR with tested prototypes June 2013 University of Geneva joined FTK. Integration/commis./LAMB project LPNHE and University of Tessaloniki show interest – will sign IMOU Heidelberg got few funds (25 keuros x 4 years)- will sign the IMOU FTK IAPP project selected for - manpower support CAEN & PRISMA ELECTRONINCS joining with IAPP

DONE January 2012 As much as possible with 8 PUs September 2012

MILESTONEs Patterns firing MHz Consumption ok, refined measurements ongoing Yield measurement ongoing, seems good – 100% expected at 30/09 During the September Technical Stop the VS will be Installed at Point 1. Data taking expected in Novemeber 100% expected at 31/12

AMCHIP04 big Jump in technology! (LNF, Pisa, Milano + ideas from USA) 4 65 nm mm 3.31 mm 64 patterns= 2 full custum cells Annovi, Beretta, Crescioli, Liberali, Sacco, Stabile, Hoff Consumption & perfomances OK Yield under Measurement NEW AMCHIP Next step: 32 kpatt instead of 8kp Serial links New package Flip BGA

AMBoard generations & tests 5 Old – CDF like 64 AMchips New – 128 AMchips 6 48 Volts 270 V 5V/ 345A, 3,3V/115A, 48V /81A, Final crate – Wiener AMBslim5 for standard test stands AMBslim5++ for cooling tests NEW:AMBFTK for 2015 (PI-MI) Under test in Pisa LAMBFTK to be assembled (PG-PI-PV) PI-PV

VERTICAL SLICE will move to LAB4 for TDAQ Integration tests – all involved 2013

Cooling first, point 1 after 7 5V/ 345A, 3,3V/115A, 48V /81A, Final crate – Wiener versus CDF crate arrived from Fermilab PI-PV Wiener Crate CDF Crate Powerful 1U FAN We will put in the crate 4 AMBoards+EDros together with boards full of resistors able to sink current Fermilab 2013

8 Integration, tests[Italy-Japan-USA]: AMBFTK + FTK_IM + [AUXFTK + DF + FLIC + …. From USA] Proto AMBoard Proto AUX The Processing Unit (PU) project The reality: AMBFTK + ProtoAUX in the crate today Proto-PU 2014: 10 AMBFTK+ 40 LAMBFTK

Sblocco SJ – 24 keuros - Pisa 9 8 9U VME (VIPA) crates from CDF + Powerfull FANs + heat exchangers + 4 racks…. Pavia 1 rack with 2 crates for cooling tests/LAMB production Milan 1 rack with 1 crate for AMBFTK test/production Frascati 1 rack with 1 crate for FTK_IM production Perugia 1 crate for LAMB tests VS work (Magalotti CMS) 2 crates at CERN (one at point 1 and one in lab 4) A lot of test stands to prepare for production. We need: some PS, some VME CPUs, Xilinx/Altera programmers, 2 Extra EDROs.

What for 2015? Small production 10 2 (like VS)-8 barrel wedges :: 8 AMBFTK 32 LAMB,1.5 k chips This is not too expensive for a demonstrator (small & modern) After this (2015) we can do the pilot run 8 AMBoards → 20 keuro 32 LAMBs → 20 keuro 1,5 kchips → ~90 keuro ~ 130 keuro in Production of FTK_IM 135 keuro in 2014

Mel & Paola - USC Richieste 2013 – linee guida Produzione rimandata ancora 2012 si costruiscono e testano pre-prototipi 2013 prototipi finali e loro tests (Test stand=CDF Crates to be adjusted) 20 k€ a Pavia per LAMB finali – Test Stand (TS) VME 10 k€ a Pisa per AMBFTK finali + 10 SJ di contingenza 5 k€ a Milano per Test Stand (sviluppo di firmware) 20 k€ a LNF per FTK_IM finale piccola produzione. chip AM 2013: IMPORTANTE prepararsi allo step finale costoso 1.Crescita dell’area per ridurre il rischio step finale (x10) 2.Input/output Serializzati per liberare pads per VCC/GND 3.Multi-packaging of dies per aumentare la densita’ → 200 k€ a Milano per crescita chip Integration test still based on EDRO in 2013: 5 k€ a Bologna per ‘rewarking’ of EDROs e miglioramento test stand SUPER TOT 260 k€ + 10 SJ

Summary 12 Milano: 5 k€ TS + AMchip05, 200 k€ Pisa: 10 k€ new AMBFTK + 10 SJ Pavia: 20 k€: LAMBFTK (small prod) + Test board LAMB LNF: 20 k€ FTK_IM Bologna: 5 k€ (spese di laboratorio) Tot: 260 keuro + 10 SJ DIMENTICATI

Responsabilita’ e ME Paola G.L2 4 mesi Marco P. L2 4 mesi Agostino L.L2 1 mese AndreaN.L21,5 mesi Annovi A. L24 mesi Volpi G.L32 mesi Mauro V.L3 3 mesi A. StabileL31 mese Valentino L.L31 mese Responsabilita’ descritte a questa pagina: Integrazione di FTK con prototipi Pisa 1 mesi Milano1 mesi Frascati1 mesi Pavia1 mesi Bologna1 mesi Mel & Paola - USC

Missioni interne 14 4 K€ Frascati integrazione prototipi e AMchip I e II 5 K€ Pisa integrazione prototipi 4 K€ Milano AMchip I e II 4 K€ Pavia integrazione prototipi Bologna integrazione prototipi

Conclusions 15 We are working hard for both the Final FTK & the intermediate versions (vertical slice and demonstrator) First prototypes (chip and boards) under tests. the AMchip is ok. the vertical slice plan has been reduced (LHC schedule). the TDR in 2013 should start final approvals A demonstrator expected in 2015, production will start after.

Backup 16