LA GESTIONE DELLE COMMESSE IMPIANTISTICHE “CHIAVI IN MANO” & C. Officine Meccaniche S.p.a. DANIELI Fulvio Roman Direttore Project Management LA GESTIONE DELLE COMMESSE IMPIANTISTICHE “CHIAVI IN MANO”
DANIELI THE RELIABLE INNOVATIVE TEAM IN THE METALS INDUSTRY
Product lines
Product lines
Worldwide companies and offices Danieli Headquarters Italy Danieli Companies France Germany Spain Sweden Danieli Offices Brazil Canada China Egypt United Kingdom USA The Netherlands Russia India Korea Malaysia Mexico Taiwan Thailand
Danieli Scorecard 97 Complete turnkey plants, designed, engineered, manufactured, erected and commissioned worldwide since 1967
1 2 3 Premessa Cosa è un contratto Cosa è un Turn-Key Project Gestione di una commessa Turn-Key 1 Premessa 2 Cosa è un contratto 3 Cosa è un Turn-Key Project
4 Fasi principali di un Turn-Key Project Gestione di una commessa Turn-Key 4 Fasi principali di un Turn-Key Project 4.1 Basic Design 4.2 Detail Engineering 4.3 Procurement 4.4 Manufacturing 4.5 Workshop testing e Pre-shipment inspections 4.6 Shipment, Custom clearance and site forwarding 4.7 Construction and erection 4.8 Commissioning, Performance demonstration e Provisional Acceptance 4.9 Guarantee period e Final acceptance
5 Interfacce interne commessa Chiave in mano Gestione di una commessa Turn-Key 5 Interfacce interne commessa Chiave in mano > Uffici tecnici macchine e processo > Uffici tecnici sistemi ausiliari > Uffici tecnici opere civili / infrastrutture > Uffici tecnici sistemi fluidi > Uffici tecnici sistemi elettrici e automazione > Uffici gestione construction, erection e commissioning > Ufficio Acquisti > Produzione > Expediting, collaudi, ispezioni > Spedizioni > Project Management, Project Planning, Control & Administration > Uffici finanziari e legali
6 Interfacce esterne commessa Chiave in mano Gestione di una commessa Turn-Key 6 Interfacce esterne commessa Chiave in mano > Organizzazione Clienti > Consulenti dei Clienti (Engineers) > Organizzazione di cantiere per construction, erection e commissioning > Enti Certificatori indipendenti > Sub-fornitori di sistemi, materiali, componenti e servizi > Uffici tecnici esterni > Sub-contrattisti opere civili e montaggi > Partners consortili / Joint Ventures > Enti finanziatori / Banche > Assicurazioni
Turn-key Project Key-Personnel Organisation chart Director, Projects Danieli Engineering (DE) Project Manager Client Project Manager & Project Management Staff Sales Manager Export Finance & L/C Manager Project Planning & Control Contract Administr. Legal Dept. Manager Procurement Manager P.M. DE P.C. WTP process P.E. Civil & structural des. P.E. Interconnecting piping P.E. Instrumentation P.E. HVAC P.E. Firefighting system P.E. Compressed air system P.C. Workshop laboratory eq. P.C. Cranes P.M. DA Process Coordinator P.E. Substation, HV - LV power distrib. P.E. Interconnecting cabling P.C. Automation system level 1 P.C. Automation system level 2 P.M. DCM P.E. Meltshop process P.E. Mech. Equipment engin. P.E. Hydraulics lubrication P.E. Piping utilities P.E. Instrumentation Danieli Construction & Commissioning (UMAC) Client Site manager & Staff Quality Manager P.M. Construct Erection & Commiss. Safety Officier P.M. DMH P.E. Rolling process P.E. Mech. Equipment eng. P.E. Hydraulics Lubrication P.E. Piping Utilities P.E. Instrumentation P.M. DCC P.E. Combustion process P.E. L.V. Distribution P.E. Automation Site Manager Planning & quantity Survey Deputy Site Manager Material Man Quality Assurance Eng. Accounting & Cost control Site Technical Office Field Engineers Civil and infrastructure construction Supervisor Erection Supervisors Startup and commissioning Team Building erection Mechanical Mechanical equipment Electrical Reheating furnace Piping P.C. Procurement cc P.C. Manufacturing & expediting Piping and aux. Systems Aux. Systems Automation HV / LV power distribution & Automation system P.C. Packing & Shipping P.C. Spare parts P.C. Training P.C. Operation, maintenance & safety manuals P.C. Expediting / testing (E LE) P.C. Quality Control
General Management Flow Chart (part 1) CONTRACT & FINANCING TOOLS REQUIREMENTS CONTRACT SCHEDULE TECHNICAL SPECIFICATION PAYMENT METHOD/FORMALITIES PICS (PROJECT INTEGRATED CONTROL SYSTEM) MASTER PLANT LIST WORK BREAKDOWN RESPONSIBILITY PRICE BREAKDOWN SCHEDULE (LEV. III) CASH FLOW JOB POSITION (TPC/JET) INSPECTION TEST SCHEDULE (ITS) (PART 2) (PART 3)
General Management Flow Chart (part 2) JOB POSITION (TPC / JET) from part 1 ENGINEERING (DOCUMENT MANAGEMENT SYSTEM - DMS) MATERIAL REQUIR. TECHN. DOCUMENTS PROCUREMENT PURCHASE & ORDERS MANUFACTURING OUTSIDE (E/LE) INSIDE (I) (PART 3)
General Management Flow Chart (part 3) MANUFACTURING (FROM PART 2) INSPECTION TEST SCHEDULE (ITS) (FROM PART 1) OUTSIDE (E) INSIDE (I/LE) INSPECTION & TESTING (NOI/IRE/LOC/QCTM) INSPECTION PLANNING NOTICE OF INSPECTION (NOI) CERTIFICATIONS (IRE) RELEASE CERTIFICATE (RC) PACKING CERTIFICATION (IRP) PACKING LIST INSPECTION PLANNING NOTICE OF SURVEILLANCE (NOS) JOB POSITION (TPC/JET) (FROM PART 1) PRICE BREAKDOWN (FROM PART 1) SHIPPING & INVOICING CONSTRUCTION & ERECTION WORKS SITE PROGRESS MANAGEMENT (SPM) COMMISSIONING
Master Plant List (example)
Estratto Livello 3: Plant Unit 31 (Typical)
Programmazione di Livello 3 (Typical)
Programmazione di Livello 4 (Typical)
Cut-off date: Progress (Typical)
Valide per tutte le discipline e attività Curve pianificate di avanzamento (Typical) % 10 20 30 40 50 60 70 80 90 100 N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A 1998 1999 2000 2001 planned progress Valide per tutte le discipline e attività
Esempi di fasi di avanzamento lavori (parte 1) ESEMPIO DI FASI DI ESECUZIONE DI UN DISEGNO Inizio disegno: 10% Prima stesura disegno: 20% Disegno commentato : 30% Disegno approvato interno: 30% Disegno approvato da Cliente: 10% ESEMPIO DI FASI DI MANUFACTURING DI UNA MACCHINA Approvvigionamento grezzi: 10% Disponibilità grezzi: 10% Costruzione carpenteria: 10% Costruzione parti meccaniche: 10% Machining: 20% Assemblaggio sottogruppi: 10% Assemblaggio macchina: 15% Collaudo: 3% Protezioni superfici: 10% Approntamento per la spedizione: 2%
Esempi di fasi di avanzamento lavori (parte 2) ESEMPIO DI FASI DI ESECUZIONE DI UNA FONDAZIONE Scavo: 5% Getto magrone: 2% Casseforme: 28% Ferri di armatura: 35% Getto cementi: 25% Disarmo e finitura/curing: 5% ESEMPIO DI FASI DI ESECUZIONE MONTAGGIO TUBAZIONI Movimentazione: 5% Assiemaggio a terra: 25% Montaggio supporteria: 15% Montaggio e saldatura linee: 35% Controlli non distruttivi: 5% Decappaggio e flussaggio: 10% Collaudi: 5%
Funzionalità e strumenti del P.I.C.S. Gestione di una commessa Turn-Key Funzionalità e strumenti del P.I.C.S. > M.P.L. (Master Plant List) > D.M.S. (Documentation Management System) > Procurement & Manufacturing Progress > Pre-shipment inspection > Shipment > Invoicing > Cash-flow > Construction & erection > Commissioning & Performance test
Gestione di una commessa Turn-Key Project Manager