Chapter 6 Master Production Scheduling

Slides:



Advertisements
Presentazioni simili
MIP International Patent Forum 2011
Advertisements

Trieste, 26 novembre © 2005 – Renato Lukač Using OSS in Slovenian High Schools doc. dr. Renato Lukač LinuxDay Trieste.
Preposizioni semplici e articolate
Centro Internazionale per gli Antiparassitari e la Prevenzione Sanitaria Azienda Ospedaliera Luigi Sacco - Milano WP4: Cumulative Assessment Group refinement.
I numeri, l’ora, I giorni della settimana
Giovanni Falcone & Paolo Borsellino.
L’esperienza di un valutatore nell’ambito del VII FP Valter Sergo
Logistica collaborativa per i distretti industriali.
Cache Memory Prof. G. Nicosia University of Catania
Teoria e Tecniche del Riconoscimento
A. Oppio, S. Mattia, A. Pandolfi, M. Ghellere ERES Conference 2010 Università Commerciale Luigi Bocconi Milan, june 2010 A Multidimensional and Participatory.
EBRCN General Meeting, Paris, 28-29/11/20021 WP4 Analysis of non-EBRCN databases and network services of interest to BRCs Current status Paolo Romano Questa.
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Push logistics Traditionally, the supply chain was pushed: manufacturers produced goods and "pushed" them through the supply chain, and the customer had.
Grammar Tips. Meanings of verbs in the present May describe things that are continuing over a period of time.
© and ® 2011 Vista Higher Learning, Inc.4B.1-1 Punto di partenza Italian uses two principal tenses to talk about events in the past: the passato prossimo.
Cancer Pain Management Guidelines
Che ore è? Che ore Sono?.
Il presente del congiuntivo (the present subjunctive)
Il presente del congiuntivo (the present subjunctive)
Raffaele Cirullo Head of New Media Seconda Giornata italiana della statistica Aziende e bigdata.
J0 1 Marco Ronchetti - Corso di Formazione Sodalia – Febbraio 2001 – Modulo Web Programming Tomcat configuration.
Biometry to enhance smart card security (MOC using TOC protocol)
Modellizzazione DICOM in Geant4 Stéphane Chauvie Santa Croce e Carle Hospital, Cuneo Gruppo italiano MC-INFN.
LInnovazione di Prodotto. Lo sviluppo di nuovi prodotti e nuovi servizi: una vecchia sfida per le imprese innovative. [emilio bellini]
PLANCK LFI N. Mandolesi Consorzio PLANCK-LFI Incontro con Prof. P. Benvenuti IASF/CNR - Sez. di Bologna, Gennaio 2004.
2000 Prentice Hall, Inc. All rights reserved. 1 Capitolo 3 - Functions Outline 3.1Introduction 3.2Program Components in C++ 3.3Math Library Functions 3.4Functions.
Magnetochimica AA Marco Ruzzi Marina Brustolon
Queuing or Waiting Line Models
Introduzione Grid1 Introduzione ai Sistemi Grid. Introduzione Grid2 Generalità Un sistema Grid permette allutente di richiedere lesecuzione di un servizio.
FONDAMENTI DI INFORMATICA III WfMC-1. FONDAMENTI DI INFORMATICA III WfMC-2 WFMC Cose WfMC Workflow Management Coalition (WfMC), Brussels, è unorganizzazione.
VARO SRL LOGISTIC, QUALITY, SERVICE
HERES OUR SCHOOL.. 32 years ago this huge palace was built and it was just the beginning; It is becoming larger and larger as a lot of students choose.
Le regole Giocatori: da 2 a 10, anche a coppie o a squadre Scopo del gioco: scartare tutte le carte per primi Si gioca con 108 carte: 18 carte.
Players: 3 to 10, or teams. Aim of the game: find a name, starting with a specific letter, for each category. You need: internet connection laptop.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Concord A tool for the analysis and concordances of the terminological constituents P. Plini, N. Mastidoro* * - Èulogos, Rome Institute for Atmospheric.
Alcuni, qualche, un po’ di
TELEFONO CELLULLARE E SACRA BIBBIA CELLULAR PHONE AND HOLY BIBLE.
UNIVERSITÀ DEGLI STUDI DI PAVIA FACOLTÀ DI ECONOMIA, GIURISPRUDENZA, INGEGNERIA, LETTERE E FILOSOFIA, SCIENZE POLITICHE. Corso di Laurea Interfacoltà in.
Guardate le seguenti due frasi:
Motor Sizing.
ROBINSON CRUSOE ROBINSON CRUSOE’S ISLAND L’ ISOLA DI
My Italian Experience By Ryan Davidson. My daily routine in Urbino If there was no field trip in the morning, my daily routine in Urbino was very basic.
Azienda Ospedaliera Universitaria - Ferrara Trieste 2010 Confronto Hard: La deformazione miocardica, il twist, il rocking e il rock and roll, sono solo.
Last quarter work and future activities
Enzo Anselmo Ferrari By Giovanni Amicucci. Di Enzo Questo è Enzo Anselmo Ferrari. Enzo compleanno è diciotto febbraio Enzo muore è quattordici agosto.
Architettura software La scelta architetturale: MVA (Model – View – Adapter/Control) The view is completely decoupled from the model such that view and.
Federazione Nazionale Commercio Macchine Cantiermacchine Cogena Intemac Unicea Unimot ASSOCIAZIONE ITALIANA PER LA PROMOZIONE DELLA COGENERAZIONE.
Enzo anselmo ferrari By: Orazio Nahar.
Quale Europa? Riscopriamo le radici europee per costruire unEuropa PIÙ vicina a noi ISTITUTO COMPRENSIVO MAZZINI CASTELFIDARDO PROGETTO COMENIUS 2010/2012.
UG40 Energy Saving & Twin Cool units Functioning and Adjustment
Collection & Generics in Java
EMPOWERMENT OF VULNERABLE PEOPLE An integrated project.
UITA Genève ottobre Comitè du Groupe Professionnel UITA Genève octobre 2003 Trade Union and Tour.
A PEACEFUL BRIDGE BETWEEN THE CULTURES TROUGH OLYMPICS OLYMPIC CREED: the most significant thing in the olympic games is not to win but to take part OLYMPIC.
Passato Prossimo. What is it?  Passato Prossimo is a past tense and it is equivalent to our:  “ed” as in she studied  Or “has” + “ed” as in she has.
Lezione n°27 Università degli Studi Roma Tre – Dipartimento di Ingegneria Corso di Teoria e Progetto di Ponti – A/A Dott. Ing. Fabrizio Paolacci.
Italian 1 -- Capitolo 2 -- Strutture
Quality Assurance in Career Guidance Services IAEVG 2009 Conference Jyväskylä, FI Leonardo Evangelista
Scenario e Prospettive della Planetologia Italiana
Buon giorno Io sono Professoressa Kachmar. Buon giorno Io sono Professoressa Kachmar.
Un problema multi impianto Un’azienda dispone di due fabbriche A e B. Ciascuna fabbrica produce due prodotti: standard e deluxe Ogni fabbrica, A e B, gestisce.
Buon giorno, ragazzi oggi è il quattro aprile duemilasedici.
Do You Want To Pass Actual Exam in 1 st Attempt?.
La Grammatica Italiana Avanti! p
Proposal for the Piceno Lab on Mediterranean Diet
The Behavioral Insight Team
The effects of leverage in financial markets Zhu Chenge, An Kenan, Yang Guang, Huang Jiping. Department of Physics, Fudan University, Shanghai, ,
Transcript della presentazione:

Chapter 6 Master Production Scheduling Vollmann, Berry, Whybark, Jacobs

What is the MPS? The MPS translates the Sales & Operations Plan (SOP o PP) into a plan for producing specific products in the future. The MPS is the translation of the SOP into producible products that make up the output.

At the operational level . . The MPS is developed to generate a sustainable Materials Requirement Planning (MRP) system and to provide the information for coordination with sales. The MPS is a statement of planned future output.

As a statement of output, the MPS Forms the basic communication between the market and manufacturing. Is stated in product specification terms (part numbers) for which there are Bill of Materials (BOM).

MPS can be stated in terms of? End-item product designations Options or modules from which a variety of end products could be assembled. Numbers of units of an “average” final product

Conversion of MPS is Controlled by a separate Final Assembly Schedule (FAS) which is defined at the very last moment.

For the Make-to-Stock firm The items are produced in batches, carrying finished goods inventories for most, if not all, end-items.

For the Make-to-Order firm In general, it carries no finished goods inventory and builds each customer order as needed. The MPS unit is defined as the particular end-item composing a customer order. Production often starts before a complete product definition or BOM has been determined.

For the Assembly-to-order firm The MPS unit is typified by an almost limitless number of possible end-item configurations all made from combinations of basic components and subassemblies. Probably will not start final assembly until order arrives.

Linkages to other firm activities It receives information from the SOP which in turn receives info from Demand Management (Forecasting) and resource planning. In addition it is linked to ERP (planning) and rough-cut capacity (make sure we can make it) planning. It generates information for MRP

MPS Techniques Time phased record (cadenza temporale delle previsioni per ogni item, con MPS livellato, di inseguimento o a lotti) Rolling through time (aggiornamento dell’MPS “lungo” la cadenza temporale) Order promising (ordini a consegna differita) Available to promise (ATP) (quanti ordini differiti posso accettare Figures 6.2; 6.3; 6.4 and 6.5

Bill of Materials Structuring for the MPS It is an engineering document that specifies the ingredients (or subordinate components) required physically to make each part number or assembly.

Single-level BOM Comprises only those subordinate components that are immediately required (not the components of the components). Adatto per il MTS: make to stock, dove il MPS è specificato in termini di prodotto finale.

Indented BOM Is a list of components, from the end item, down to the raw materials (it does show components of the components).

Other definitions BOM files are those computer records designed to provide desired output formats. BOM Structure relates to the architecture of the BOM files BOM Processor is a computer software package that organizes and maintains linkages in the BOM as dictated by the BOM structure.

More definitions Product Structure a company should have one and only one set of BOM records. Low-Level Code number should be designated for each part, component, subassembly or finished item in the BOM. These numbers indicate where in the product structure a particular item is with respect to the end item.

Modular BOM When the combinations of end-item product are many ad esempio in una fabbrica automobilistica che produce grande varietà di prodotti finali, tenendo conto delle varie combinazioni di opzioni o moduli, it is better to use the MPS at the option or module level. The MPS is stated in the terms in which the product is sold not built. cioè in termini di BOM dei vari moduli della configurazione, ordinata dal cliente The most widely used is called the super bill.(6.14) : la configurazione costituisce un single-level BOM che serve principalmente per la previsione di vendita (ma anche per montare il prodotto finale); nel super-bill ogni opzione è pesata con la media della sua presenza nelle configurazioni prodotte (se si vendono 1000 auto con 2 porte e 500 con 4 porte, la media è 8/3). Il SOP/PP e l’MPS si fanno allora in termini di super bill. Le medie del super-bill sono valide nel lungo periodo e vengono assorbite nel breve periodo da Safety Stock dei singoli moduli. I livelli dei Safety S. sono mantenuti dall’MRP.

Final Assembly Schedule (FAS) fig. 6.17-6.18-6.19 FAS job is to convert MPS records into FAS records as we roll through time. (6.17) La configurazione finale è gestita con il FAS secondo un principio pull: dall’ordine si risale alla configurazione e si accetta l’ordine (eventualmente differito) se sono (o saranno) disponibili i componenti; quindi parte l’ordine di eventuale loro finitura e l’assemblaggio finale. In sostanza i componenti sono prodotti make-to-stock e il finale assembly-to-order. Tutto ciò va bene per produzioni ripetitive a numerosità medio-alta o al più media (ricordare il diagramma). Quando la numerosità è più bassa ci può essere la variante che componenti non disponibili, necessari ad accettare un ordine, vengono inseriti, con una variante, nell’MPS di produzione dei componenti.

The Master Production Scheduler Its useful to think of the MPS as a set of firm planned orders. The scheduler needs to convert planned orders to firm planned orders and to manage the “timing” and amounts of the firm planned orders.

The Job of the Master PS Primary responsibility for making any additions or changes to the MPS records. Has also has responsibility for disaggregating the production plan to create the MPS and that the sum of the detailed MPS matches the Production Plan (SOP).

The Job of the Master PS Responsible for launching the FAS. Making sure that there is only one unified database for the MPS Measure actual performance against the MPS and production plan (SOP)

Conflitto tra B e C in sett 8 effettivo 50 previsto To production 150

MPS Stability A stable MPS translates into stable component schedules, which means improved performance in plant operations. Too many changes – lower productivity Too few changes – lower customer service levels.

Increasing MPS stability Stability is monitored and managed by: Frozen time periods for the MPS and Time fencing to establish clear guidelines for the kinds of changes that can be made.

Frozen Schedule This means that for the more recent time buckets it will be very difficult (but still negotiable) to change the sequence in which the orders will be processed.

Time Fencing This is an extension of the freeze concept. Many companies set time fences that specify periods in which various types of change can be handled. In the Demand fence the forecast is ignored in calculating the available (difficult to change the MPS). The planning fence indicates the time at which the scheduler should be planning more MPS quantities. per consentire “management trade-off to make changes”

Managing the MPS Start by having a realistic MPS Stability and proper buffering are important to remove all the excuses for not attaining the performance for which the proper budget has been provided. 6.24