RPC Barrel Status del Commissioning P. Vitulo Bari/Frascati/Napoli/Pavia Sinossi della presentazione.

Slides:



Advertisements
Presentazioni simili
Brussels launch of the Association Bruno Trentin-ISF-IRES Fulvio Fammoni President Associazione Bruno Trentin-Isf-Ires (Italy) Brussels, 26 settembre 2013.
Advertisements

Centro Internazionale per gli Antiparassitari e la Prevenzione Sanitaria Azienda Ospedaliera Luigi Sacco - Milano WP4: Cumulative Assessment Group refinement.
L’esperienza di un valutatore nell’ambito del VII FP Valter Sergo
Cache Memory Prof. G. Nicosia University of Catania
EBRCN General Meeting, Paris, 28-29/11/20021 WP4 Analysis of non-EBRCN databases and network services of interest to BRCs Current status Paolo Romano Questa.
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Udine 1 Udine – Richieste Attivamente coinvolti totali 3FTE M.P.Giordani, P.Palestri, L.Selmi A.Micelli (dottorando) A.Cristofoli (laureando.
1.E un algoritmo ricorsivo: Tutti le istanze di oggetti raggiungibili da un oggetto persistente diventano anchessi persistenti.
Cancer Pain Management Guidelines
Raffaele Cirullo Head of New Media Seconda Giornata italiana della statistica Aziende e bigdata.
CSN giugno Comunicazioni Riunione R-ECFA ai LNF 21&22 maggio; buona impressione data dallEnte. Follow-up? Giornata PT ai LNGS 3&4.
Biometry to enhance smart card security (MOC using TOC protocol)
TIPOLOGIA DELLE VARIABILI SPERIMENTALI: Variabili nominali Variabili quantali Variabili semi-quantitative Variabili quantitative.
G. Pugliese Bari, 20 May 2005 I rivelatori a Resistive Plate Chambers G. Pugliese per la Collaborazione CMS di Bari.
R ISULTATI R UN DI C OSMICI : RPC Anna Cimmino per CMS RPC Collaboration Riunione Gruppo I, Napoli 16 Dicembre.
PLANCK LFI N. Mandolesi Consorzio PLANCK-LFI Incontro con Prof. P. Benvenuti IASF/CNR - Sez. di Bologna, Gennaio 2004.
ATLAS Muon Detector Description – sviluppi nellultimo anno MuonGeoModel: MuonGeoModel: sw che descrive la geometria dello spettrometro a muoni di ATLAS.
WP 10 – Applicazioni Astrofisica – stato Leopoldo Benacchio INAF Osservatorio Astronomico di Padova Pisa maggio 03.
VARO SRL LOGISTIC, QUALITY, SERVICE
National Project – on going results Potenza 7/10 November 06 IT-G2-SIC-066 – Social Enterprise and Local Development.
Le regole Giocatori: da 2 a 10, anche a coppie o a squadre Scopo del gioco: scartare tutte le carte per primi Si gioca con 108 carte: 18 carte.
Ultime Novita da P5 21 May M.Giunta23rd May, LV Status LV –11 MAOs smontati e mandati in CAEN per modifiche Problemi: –portafusibili non.
Gianni Masetti Università di Bologna - INFN 21/2/2008 – DT Bologna meeting Stato del Commissioning delle DT Bologna DT crew.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Test-beam X5/H Workshop a dicembre su organizzazione attivita 2003 Mail generale inviata a tutti da F.Cerutti Date del workshop (definitive) Venerdi.
BML-D 001 Monitoring Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino, F. Conventi, R. de Asmundis, M.Della Pietra, D.
Motor Sizing.
Area Di Progetto I.T.I.S G.Marconi Dalmine Classe 5°AET
Last quarter work and future activities
MILANO Single step D=400mm, f=40°Diag From a message of Levacher about next step thermal analysis for the baffle can be allocated a space of.
Stato dei sistemi di High Voltage Low Voltage Detector Control system.
Rivelazione raggi cosmici ad alta energia con controllo remoto
Sistema automatico di misura della resistività. QC HPL Gennaio – Novembre 2004.
Giovedì 17 Aprile 2008 Heroes {Community} Launch Giovedì 17 Aprile 2008.
Federazione Nazionale Commercio Macchine Cantiermacchine Cogena Intemac Unicea Unimot ASSOCIAZIONE ITALIANA PER LA PROMOZIONE DELLA COGENERAZIONE.
RPC units for BOS chambers - Sector 2 BBBBBBBBBBBDBBBBBBBBBBBD Z= 0 Side ASide C PAD Splitter Wired_or hole Version RO-MDT HV-MDT Chambers are.
UG40 Energy Saving & Twin Cool units Functioning and Adjustment
EMPOWERMENT OF VULNERABLE PEOPLE An integrated project.
"We firmly believe that the on-the-run issues should command a high liquidity premium in the current environment. But with very high probability, the.
It’s a chain story created by our little pupils of pre-school and first classes of primary. It’s a scraper-book made by several materials and by their.
PV-Milano 10/6/08 1 RPC Barrel P Vitulo Bari/Frascati/Napoli/Pavia  Osservazioni/domande sul documento MoA e interazione con GR1  RPC Operation/Maintenance.
CESANELLA PRIMARY SCHOOL SENIGALLIA - ITALY PLAYGROUND GAMES ELASTIC -ELASTIC -ELASTIC -ELASTIC -ELASTIC - ELASTIC - ELASTIC - ELASTIC - ELASTIC - ELASTIC.
RPC muon trigger 3 concentric cylindrical layers of RPC at 5, 7.5 and 10m radius 2 gas gaps and 2+2 readout planes for each detector element 2 mm gas gap.
Stato del progetto RPC P. Paolucci & CMS RPC group.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
A. Colaleo1 Stato produzione Stato installazione e commissioning RPC nell’MTCC Phase 1 Phase 2 Attivita’ dopo l’MTCC Stato cablaggio Stato sistema monitoring.
I sistemi di gas dei rivelatori di muoni del barrel di CMS (DT e RPC) Paolo Giacomelli - INFN Bologna.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 ATTIVITA` CMS FRASCATI MAGGIO )Sistema Gas Gain Monitoring (GGM) 2)Studio dei.
P. Paolucci - I.N.F.N. di Napoli 1 31 agosto 2006 L. Lista – INFN - 100%F. Fabozzi - Univ Bas - 100% S. Mele – INFN - 100%N. Cavallo - Univ Bas - 100%
RPC Status Outline Barrel installation and commissioning status
P5  2009 shifts VS shifts until the end of 2009  2010 plan.
1 6 maggio 2009Attivita' e richieste CSM Frascati - Stefano Bianco 1 Closed Loop e Gas Gain Monitoring Il Closed Loop e’ in operazione stabile dopo lo.
CMS RPC ITALIA' , Settembre Ischia-ITALIA RPC DCS Giovanni Polese.
RPC R&D ATLAS-CMS WG4 D. Piccolo, B. Liberti per il WG4 1.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
Michele Iacovacci (Napoli),
Calorimetro LAR ATLAS Italia Roma 28 novembre 2008
From 8 to 80 boxes. From FBSNG to Condor CPU Satura !
Atlas Spares D.Lucchesi , G.Darbo, P.Lubrano, A.Cardini, P.Giannetti
Status del Gruppo di Napoli
Bubble Sort.
Atlas Milano Giugno 2008.
Il trigger per muoni dell’esperimento CMS
Assegnazioni/Residuo 2004
connettorizzaz. e test dei cavoni HV 2 mu
Dr. Pierluigi Paolucci - INFN di Napoli
Dr. Pierluigi Paolucci - INFN di Napoli
Study of Bc in CMSSW: status report Silvia Taroni Sandra Malvezzi Daniele Pedrini INFN Milano-Bicocca.
Preliminary results of DESY drift chambers efficiency test
CdS 2017: embargo fino a TAUP2017
Transcript della presentazione:

RPC Barrel Status del Commissioning P. Vitulo Bari/Frascati/Napoli/Pavia Sinossi della presentazione

Overview Stato dellinstallazione: cabling, elettronica Stato del commissioning: Tower test TTU test Gas P5 Closed Gas Gain Monitoring Sommario Commissioning Addenda: Report on gas leak (from A. Colaleo) Report on Power System (P. Paolucci) Report on Gas Gain Monitor (S. Bianco) Sinossi della presentazione

PV-8 maggio 2008 UXC Hardware BARREL Status WheelDetect-tower cables (HV-LV-DCS cables) Link Boxes Link Boards LV easy crates LV modules RBCTower cables MAO W+2 ok W+1 ok W0 ok W-1 ok W-2 ok 50% ok Overall Status: Missing half LV modules for W-2 LV modules expected in April/May at CERN Status installazione:cabling, elettronica

PV-8 maggio 2008 WheelHV cables –patch panel HV Easy Crates HV distrib. EASY – majiste SY1527 local cable HV multicond. Cable test Trigger cables from UXC-USC W+2 ok W+1 ok W0 ok W-1 ok W-2 ok USC55 hardware BARREL Status Overall status: HV modules not all in place Action:We move from one easy crates to the other in order to test the chambers. All missing modules will be at CERN in April/May First delivery phase: HV modules were affected by offset instability Second delivery phase (middle of March): HV modules were affected by negative offsets. Action: we solved the problem by software. Status installazione:cabling, elettronica

Steps towards full system commissioning: Commissioning steps Commissioning steps 1.Local commissioning from chamber to tower : Tower tests with random trigger 2.Commissioning with cosmics: test with RBC-TTU, efficiency studies (FEB threshold and HV working point ) 2.Commissioning of the full detector/DAQ/Trigger chain Global Runs/Minidaq Status Commissioning

PV-8 maggio 2008 Tower Test done for 9/10 towers so far W-2 Tower Test finished end of April 2008 Several inversions of signal cables, which were swapped either in LB or on CH side: solved 1-2 partition/ wheel not acknowledged (no threshold control, feb set at default threshold=200 mV) noisy FEB (~ % / tower) dead strips (~ % / tower) All problems reported in a web page. Complete map of all hardware problems: shift operator must check it before operate the chamber. Tower test summary Status Commissioning

PV-8 maggio 2008 Installation of RBC boards on the detector towers and cabling: done Installation of TTU boards in USC55: 1 out of 3 (can cover about 2 wheels) The installation will be completed as soon as full production of Trigger Boards (Warsaw) will be delivered Validation of implemented algorithm with local readout and minidaq. Test started on W+1 in March 1. At sector level 2.Tower level (Only with sect for the moment) 3.Wheel level (need full TBs system installed) Study the timing calibration for cosmic muons Xcheck with DT trigger Coupling with Global Trigger Provide Trigger for any cosmic run, May Global Run and CMS startup TTU Trigger status TTU status

PV-8 maggio 2008 WHV test UXC-USC LV, DCS test Tower testcosmic test with RBC-TTU (sect ) W+2ok May W+1ok March-April W0ok April-May W-1ok June W-2okFar side by middle of April June Summary of Commissioning status and plan Summary of Commissioning status and plan Status commissioning e pianificazione

PV-8 maggio 2008 Status del commissioning del P5 Il sistema finale funziona ed è stabile sulla W0. Dal 20 aprile aggiunta la W2 (in entrabi i casi e solo per ragioni di costi, ci stiamo limitando alla torre near: 6 settori). Le camere della W0 sono ON (sul sistema finale) dal 10 aprile. Previsto un sistema di interlock collegato al sistema di HV in caso di stop del sistema di gas. La qualità della miscela è costantemente monitorata con: GC, misuratore di O2 e H2O la concentrazione di aria nella miscela che torna dalle camere è a livelli piuttosto bassi L'umidificatore è in funzione e stiamo monitorando l'umidità del gas sia dopo l'umidificatore, sia a livello del distributore sulla W0 (2 canali hanno sensori di umidità sulla linea di supply e su quella di return). L'umidità relativa della miscela è 40%. La temperatura è di circa 20 C. Il flusso per canale di almeno 15 l/h. Entrambi i filtri sono in uso: la miscela che torna dalle camere passa attraverso i filtri e va in aria per ora (open loop). Il gas viene analizzato regolarmente prima e dopo i filtri. Se non ci saranno maggiori intoppi, inizieremo il ricircolo verso la metà di maggio (dopo circa un mese di run in open mode). Partiremo con una frazione di miscela nuova dell'ordine del 40-50%. Status of Gas System

PV-8 maggio 2008 Status of Gas System ISR (CERN Gas Group (Roberto Guida) + Gruppo RPC) Le correnti stanno aumentando (i filtri non sono mai stati rigenerati dallo scorso luglio). L'aumento è stato molto graduale, non repentino come la scorsa volta La concentrazione di aria nel loop è sostanzialmente uguale a quella della miscela nuova. Con il GC non si vedono particolari extra-componenti. Sono stati predisposti diversi gorgogliatori per il campionamento del gas in soluzione. La stazione per la misura dei fluoruri è pronta e funzionante. finite le misure in argon, ripartiremo con filtri nuovi (in particolare sostituiamo il setaccio molecolare 5A con il 3A). nel nuovo ciclo, saranno collegate anche le 10 Single gap nuove ed anche tre delle camerette del "gas gain monitoring". GAS system ISR

PV-8 maggio 2008 I rivelatori del Gas Gain Monitoring sono in operazione allISR, in corso lintegrazione DCS/PVSS/xDAQ Analisi preliminari della miscela durante i test di ricircolo hanno mostrato la presenza in tracce di elementi metallici, probabilmenti rilasciati dai filtri durante o dopo la saturazione Differenti procedure per lo studio della cinetica chimica dei filtri. Sebbene i filtri debbano essere caratterizzati chimicamente il setup utilizzato è capace di operare correttamente nel detector. GAS Gain monitor e ISR Status of Gas System

PV-8 maggio 2008 Steps for each wheel: Flow cell equalization 100% mixture in fill mode operation (6 sectors) with current and noise monitoring 50% mixture in closed mode (6 sectors) for 1 month with current and noise monitoring GAS system commissioning plan Goal : 1/2 Barrel (6 sectors/wheel) in recirculation mode (50% fresh gas) by end of May. All barrel wheels in recirculation mode (50% fresh gas) by end of July. Status of Gas System

PV-8 maggio 2008 All hardware (HV/LV) in place by end of April Trigger system ready for all wheels by end of May (now 50% installed) Tower test done on 9/10 towers. All hardware chain fully commissioned by May. 3 main hardware problems (chamber LHC start up: 2 chambers with big gas leak ( W0/RB3/S8, W+2/RB4/S8 ) 1 chamber with LV problem ( W-1/RB4/S6 ) Action: Chambers to be extracted and checked at first shutdown. 4 chambers with gas leaks but OPERABLE ( W0/RB1/S1, W0/RB3/S2, W-2/RB1/S7, W+1 RB4 ) Gas leak tests done three times on all chambers after installation. GAS system commissioning will require a lot of effort since also chamber performance must be checked in parallel. No enough experts available. Goal is to have full system fully commissioned in re-circulation mode (high % fresh gas) by July. Conclusion and status at startup Sommario Commissioning

PV-8 maggio settimane costruzione camere al CERN (x 3 tecnici ) appena possibile 2 settimana installazione camere da estrarre (x 3 tecnici) alla riapertura 2 settimane riparazione eventuali (cavi, connettori,moduli): x 3 tecnici shutdown 2 settimane riparazioni eventuali (accesso possibile): x 2 tecnici presa dati 2 settimane smantellamento ISR e Bd904 e spostamento a PT5(smantellamento ISR già stadio avanzato): x 3 tecnici entro dicembre Presenza costante di un tecnico equivalente multi-task Manpower - Tecnici Manpower per completamento e mantenimento Gas Gain Monitoring (assistenza prelievi all'ISR, disinstallazione dall'ISR, trasporto al SG5, installazione al SG5, checkout e assistenza commissioning camerette GGM ) 3 mu 5 mu (probabili overlap ma non tanti) mu (installazione) + 3 mu (gas Mon) TOT 9.5 mu

Manpower per SHIFT Manpower - Fisici RPC BARREL SYSTEM AREA DATA TAKING SHUT-DOWN MANAGERS OPERATORS EXPERTS TOTAL MANAGERS OPERATORS EXPERTS TOTAL TOTAL OPERATION 3,04,03,010,01,00,05,06,0 TOTAL MAINTENANCE 0,0 3,0 0,0 TOTAL SYSTEM AREA 3,04,06,013,01,00,05,06,0 TOT : 13 (mu /mesi RUN) + (6 mu/mesi Shutdown) 11 (mu /mesi RUN) + (6 mu/mesi Shutdown) a regime