La presentazione è in caricamento. Aspetta per favore

La presentazione è in caricamento. Aspetta per favore

Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate.

Presentazioni simili


Presentazione sul tema: "Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate."— Transcript della presentazione:

1 Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate - 19*10 19 p.ot at the end of 2012, 84% of foreseen statistics - numu->nue analysis in progress - not decided about extension of run, yet OPERA should exploit its physics goal: numu->nutau appearance 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova1

2 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova2

3 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova3

4 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova4

5 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova5

6 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova6 Lot of PHYSICS Analysis in progress…

7 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova7

8 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova8 New run with short-bunch narrow spacing beam for nu velocity measurement Improved OPERA timing system + White Rabbit system for continuous fiber time delay monitoring Independent OPERA timing system used in parallel exploiting RPC Timing Boards Improvements in the systematic errors in progress….

9 Microscopes in LNL 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova9 LNL scanning lab members Test scanning on the microscope with a new type of scanning table (designed by C. Fanin) in progress.

10 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova 10 Interesting events: 1 kink topology +1 new charm candidate +1 nue candidate 81% located 2010 run Scanning and analysis on 2011 run is going on. Laboratorio LNL Additionally to OPERA event analysis, PADOVA scanning lab is contributing on the study of the volcanoes by muon radiography using nuclear emulsion film. In this project, we collaborate with Tokyo, Napoli, Salerno, lAquila Universities and LNGS.

11 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova11 U. Kose is contributing on numu nue oscillations study and DATA/MC comparison. He is also co-supervising thesis work in Laurea Magistrale in Fisica, entitled Development of new tracking algorithm and Electromagnetic shower reconstruction tool in the OPERA nuclear emulsions using GPU. E. Medinaceli is contributing on MC study to improve of our understanding on charm analysis, mainly on the detection efficiencies and background estimations. He also works on the implementation of decay search tool in the MC.

12 Impegni per Padova: 1. Short run 2013 ? 2. Analisi 3. Automazione sviluppo 4. Lab. scanning emulsioni Situazione del gruppo: R.Bertolin (40%) R.Brugnera (30%) F.Dal Corso (10%) S. Dusini (60%). Responsabile Locale A. Garfagnini (40%) C.Fanin (10%) C. Sirignano (80%) L.Stanco (40%) 4.4 FTE Permanenti: Precari: Umut Kose (assegnista) (70%) Eduardo Medinaceli (ass. Univ.) 60% Responsabilità nella collaborazione - Luca Stanco: Publication&Talk board, CB - Stefano Dusini: Ad Interim Physics Coordinator, EC - Alessandro Bertolin: Project Leader RPC-XPC - Alberto Garfagnini: Slow Control supervisor - Chiara Sirignano / Umut Kose: Dark Matter Contributi dallOE e OM per turni specializzati al Gran Sasso di - Sviluppo fotografico delle emulsioni in camera oscura - Analisi automatica di Scanning dei CS 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova12

13 Richieste finanziarie 2013 Missioni Interne: 110.5 +12(s.j.)+10(DM) Missioni Estero: 43 +10(DM) Trasporti: 0 K Inventario: 0 K Costruzione Apparati: 28 K Consumo: 43 K Richieste ai servizi per il 2013: Elettronica: 1 m.u. per supporto maintenance Elettr. RPC 3 m.u. per shifts presso i LNGS Meccanica: 4 mesi uomo per shifts presso i LNGS Uffico Tecnico: 2 mesi per sviluppo lab. Scanning (incluso Fanin) Tot (Padova).: 224.5+12(s.j.) + 20(DM) Common Funds (Italia) circa 480 K Manutenzione: 0 K 9 Luglio 2012Stefano Dusini / Luca Stanco - CdS Padova13


Scaricare ppt "Fatti principali dei precedenti 12 mesi. - Nuvel History (no comment, but RPC are excellent !) - management problems - financial problems - 2° tau candidate."

Presentazioni simili


Annunci Google