Riunione dei Responsabili e Senior INFN. Some news on Pixel Upgrade G.M. Bilei2 Pixel TDR - Good progress in write up - Timeline (see next slide): first.

Slides:



Advertisements
Presentazioni simili
Primary Italian Saying How You Are.
Advertisements

Trieste, 26 novembre © 2005 – Renato Lukač Using OSS in Slovenian High Schools doc. dr. Renato Lukač LinuxDay Trieste.
Anno Diaconale f Federazione delle Chiese Evangeliche in Italia ufficio volontariato internazionale via firenze 38, roma tel. (+39) fax.
Preposizioni semplici e articolate
I numeri, l’ora, I giorni della settimana
L’esperienza di un valutatore nell’ambito del VII FP Valter Sergo
Cache Memory Prof. G. Nicosia University of Catania
They will read I will study She will walk the dog You guys will win the game!
Relaunching eLene Who are we now and which are our interests.
EBRCN General Meeting, Paris, 28-29/11/20021 WP4 Analysis of non-EBRCN databases and network services of interest to BRCs Current status Paolo Romano Questa.
DG Ricerca Ambientale e Sviluppo FIRMS' FUNDING SCHEMES AND ENVIRONMENTAL PURPOSES IN THE EU STRUCTURAL FUNDS (Monitoring of environmental firms funding.
Udine 1 Udine – Richieste Attivamente coinvolti totali 3FTE M.P.Giordani, P.Palestri, L.Selmi A.Micelli (dottorando) A.Cristofoli (laureando.
Università degli Studi di Cassino e del Lazio Meridionale Dipartimenti di Scienze Umane, Sociali e della Salute Lingua Inglese a.a (Dott. Saverio.
La Scuola School.
1.E un algoritmo ricorsivo: Tutti le istanze di oggetti raggiungibili da un oggetto persistente diventano anchessi persistenti.
© and ® 2011 Vista Higher Learning, Inc.4B.1-1 Punto di partenza Italian uses two principal tenses to talk about events in the past: the passato prossimo.
Cancer Pain Management Guidelines
Sta andando meglio? oppure ti senti uguale? Is it getting better? Or do you feel the same?
Punto di partenza Reciprocal verbs are reflexives that express a shared or reciprocal action between two or more people or things. In English we often.
Il presente del congiuntivo (the present subjunctive)
Il presente del congiuntivo (the present subjunctive)
Raffaele Cirullo Head of New Media Seconda Giornata italiana della statistica Aziende e bigdata.
CSN giugno Comunicazioni Riunione R-ECFA ai LNF 21&22 maggio; buona impressione data dallEnte. Follow-up? Giornata PT ai LNGS 3&4.
Biometry to enhance smart card security (MOC using TOC protocol)
Corso di Laurea in Ingegneria Elettronica - U niversità di N apoli F EDERICO II Autori XXXXX XXXXXXX YYYYY YYYYYYY ZZZZZ ZZZZZZZ Titolo tesina Parte X:
TIPOLOGIA DELLE VARIABILI SPERIMENTALI: Variabili nominali Variabili quantali Variabili semi-quantitative Variabili quantitative.
Ergo : what is the source of EU-English? Standard British English? Standard American English? Both!!!! See morphology (use of British.
VARO SRL LOGISTIC, QUALITY, SERVICE
HERES OUR SCHOOL.. 32 years ago this huge palace was built and it was just the beginning; It is becoming larger and larger as a lot of students choose.
National Project – on going results Potenza 7/10 November 06 IT-G2-SIC-066 – Social Enterprise and Local Development.
CMS Physics week di settembre 2009 a Bologna P. Giacomelli 10/10/2008.
LHCf Status Report Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Oscar Adriani INFN Sezione di Firenze - Dipartimento di Fisica.
Test-beam X5/H Workshop a dicembre su organizzazione attivita 2003 Mail generale inviata a tutti da F.Cerutti Date del workshop (definitive) Venerdi.
VII EBRCN GM, Berlin, 26-28/09/20041 EBRCN Site: current status Béatrice Dutertre Questa presentazione può essere utilizzata come traccia per una discussione.
Emma Project INCONTRO
Guardate le seguenti due frasi:
Motor Sizing.
E-TWINNING PROJECT EASTER HABITS TEACHER MARIA ROSARIA ROGATO COUNTRY ITALY (COLLEFERRO-ROME)
My Italian Experience By Ryan Davidson. My daily routine in Urbino If there was no field trip in the morning, my daily routine in Urbino was very basic.
Italiano 6 Test review – Days, Dates, Months, Seasons, Weather Press View Slide Show. Then click through the slide show and review the various topics.
Last quarter work and future activities
Project Review Novembrer 17th, Project Review Agenda: Project goals User stories – use cases – scenarios Project plan summary Status as of November.
Giovedì 17 Aprile 2008 Heroes {Community} Launch Giovedì 17 Aprile 2008.
Federazione Nazionale Commercio Macchine Cantiermacchine Cogena Intemac Unicea Unimot ASSOCIAZIONE ITALIANA PER LA PROMOZIONE DELLA COGENERAZIONE.
Enzo anselmo ferrari By: Orazio Nahar.
Quale Europa? Riscopriamo le radici europee per costruire unEuropa PIÙ vicina a noi ISTITUTO COMPRENSIVO MAZZINI CASTELFIDARDO PROGETTO COMENIUS 2010/2012.
FOR EVERY CALLOUT THAT YOU WILL SEE IN ENGLISH PROVIDE (IN WRITING) THE CORRECT ITALIAN SENTENCE OR EXPRESSION. REMEMBER TO LOOK AT THE VERBS AND PAY.
UG40 Energy Saving & Twin Cool units Functioning and Adjustment
EMPOWERMENT OF VULNERABLE PEOPLE An integrated project.
PLURALI - with NOUNS PAY ATTENTION TO THE ENDING OF THE NOUN! “O” ---> “I” ex) il quaderno -> i quaderni “A” ---> “E” ex) la matita -> le matite “E” --->
You’ve got a friend in me!
UITA Genève ottobre Comitè du Groupe Professionnel UITA Genève octobre 2003 Trade Union and Tour.
1 LA RELAZIONE CON LE FAMIGLIE RELATIONSHIP WITH FAMILIES Lillegarden – Trollhattan 24/05/2009 – 06/06/2009 di Carla Lommi educatrice Nido d’Infanzia “Bosco.
A PEACEFUL BRIDGE BETWEEN THE CULTURES TROUGH OLYMPICS OLYMPIC CREED: the most significant thing in the olympic games is not to win but to take part OLYMPIC.
Passato Prossimo. What is it?  Passato Prossimo is a past tense and it is equivalent to our:  “ed” as in she studied  Or “has” + “ed” as in she has.
Saluti ed espressioni Greetings in Italian.
Italian 1 -- Capitolo 2 -- Strutture
Buon giorno Io sono Professoressa Kachmar. Buon giorno Io sono Professoressa Kachmar.
I giorni della settimana
L A R OUTINE D EL M ATTINO Ellie B.. Io mi sono svegliata alle cinque del mattino.
CSN M. Diemoz CMS – RRB24 SOLDI INVESTITI BENE...
News LHC recommissioning is continuing Sucessfully achieved so far 4 TeV beams, 0.6 m beta* (at least with few bunches) Some beam splashes last week; still.
Call 5: ACTIVE – 3 rd Meeting G. Darbo – INFN / Genova 8 July 2013 o ACTIVE – 3 rd Meeting G. Darbo – INFN / Genova Indico agenda:
MSc in Communication Sciences Program in Technologies for Human Communication Davide Eynard Facoltà di scienze della comunicazione Università della.
Do You Want To Pass Actual Exam in 1 st Attempt?.
WRITING – EXERCISE TYPES
Comunicazioni Riunione ATLAS-Italia
Il condizionale.
GOOD MORNING NHS MEMBERS
Transcript della presentazione:

Riunione dei Responsabili e Senior INFN

Some news on Pixel Upgrade G.M. Bilei2 Pixel TDR - Good progress in write up - Timeline (see next slide): first version to be sent to LHCC referee in June - INFN Gruppo I presentation on Pixel TDR planned on July Preliminary Money Matrix with draft contribution from agencies presented to last October RRB. Update April 2012 RRB. Pixel Project covered - INFN Pixel contribution 1.4 MCHF Sharing of Pixel Upgrade Responsibilities - Discussion well advanced with the Pixel Management Board April will be crucial with several key technical and managerial discussions to take placewith a final internal Review 25 th of April.

CMS Upgrade Money Matrix G.M. Bilei3

Pixel TDR timeline Target presentation of final document to LHCC in September 2012 –with draft sent 1-2 months earlier. Presently we have first draft 70% complete Some strategic points to be worked into the document. In April will internally review all strategic and technical points of the project going in the TDR as part of CMS Conceptual Design Review (Apr. 25 th ) Gruppo I discussion in July G.M. Bilei 4 MonthAction MarFirst draft. Not for circulation outside CMS AprCMS Upgrade Project Conceptual Design Review. MaySecond draft. Not for circulation outside CMS JunPhysics case conclusion. JulFinal draft of document. (Send to LHCC.) AugFinal checks and signoff in Ph1 MB SepFinal signoff and presentation to LHCC.

INFN Draft Contribution profile G.M. Bilei

Phase1b proposed preliminary breakdown G.M. Bilei6

INFN Pixel Upgrade TDR list G.M. Bilei7 Pixel TDR will have two separate lists 1. CMS author list 2. Pixel Upgrade participants intending to contribute to the project (not only Construction, but also simulations, software on & off line, DCS etc.) This list includes Technicians, Engineers, Physicists. Here the list I have got from you. I will provide it to Salvatore. If you have comments or changes let me know.

Genova Totem G.M. Bilei8 Alcuni membri del gruppo INFN TOTEM Genova hanno contattato Nadia per ingresso in CMS. Interesse in Fisica, Elettronica ed Hardware. In particolare sono interessati al progetto di Upgrade dei Pixel. E. Robutti, M. Lovetere, P. Musico ed altri. Totale ~ 5 FTE Abbiamo parlato con Nadia ed entrambi concordiamo ci sembri una buona novità e che questa interesse debba essere incoraggiato. Opinioni?

Selex Offerta Bumb Bonding G.M. Bilei9 Richiesta di sblocco SJ di 25 Ke su Pisa inviata ai referee. Domani meeting con Nadia ed i referee. Nadia mi ha detto che ha parlato con i referee e non dovrebbero esserci problemi. Urgente capire con Selex i costi di produzione finale. Una offerta inviata fine dello scorso anno non sembrava essere soddisfacente. Sono in corso contatti /negoziazioni per avere condizioni migliori.

Test Beam Frascati G.M. Bilei10 Prossimo possibile periodo: 30 Aprile - 4 Maggio 2012 Interesse ad organizzare una attivita` comune di test modulo pixel su fascio? In caso positivo, organizzare un piccolo sforzo e definire programma di lavoro.

Some points to follow up G.M. Bilei11 Pixel Upgrade ROC wafer from Roland and testing in PSI (first) and Padova (later) This is the only element we don’t have control yet. Roland promised the wafers several time, need to follow up with him. Pixel Simulation: increase INFN contribution. 1 post-doc available Operation/DPG/POG Define Technical/Engineering support for 2013 LS1 from Tracker and INFN In particular in order to define funding request for 2013, by June we should define the support that we could provide compatibly with other activities. Possibly increase INFN contribution in the area of Radiation Damage studies and simulation. Possibly improve the way we contribute to Operation, DPG, POG tasks and get toward an organized contribution from INFN. Tracker Upgrade INFN R&D funding to support activities for the preparation the proposal for Tracker Upgrade INFN Support Track Trigger Simulations and better integrate them with Trigger Hardware activities

Next Tracker Meetings G.M. Bilei12 Next meetings Molti MB Pixel Upgrade meeting previsti prossimo mese Tracker week Apr. Conceptual Design Review 25 Apr CMS Upgrade week May Pixel Upgrade Grindelwald (CH) Aug. Fatemi sapere numero stimato dei partecipanti. Tuesday 28 am Workshop registration Tuesday 28 pm Working Group parallel session (e.g. Cooling in parallel with Test beam) Wednesday 29 am Working Group parallel sessions (e.g. Simulations in parallel with BPIX module production) Wednesday 29 pm Plenary Phase 1 meeting - Part 1 Thursday 30 am Plenary Phase 1 meeting - Part 2 Thursday 30 pm Off-site visit (e.g. mountain location). Friday 31 am Phase 1 Management Board (restricted) in parallel with Informal Working meetings. Friday 31 2pm Close of meeting.

INFN Next meeting? G.M. Bilei13 If useful we might consider to have a second INFN workshop someplace else (autumn?) Continue to hold short (2 two hours) INFN meetings at CERN during Tracker weeks to touch down most important topics with short presentations. Continue to hold about 1.5 hour meeting bi-weekly or when urgently needed. Grazie agli speakers ed a tutti i partecipanti