Laser Control, Elettronica Monitoring, DAQ

Slides:



Advertisements
Presentazioni simili
Laureando: Emanuele Viviani
Advertisements

Local Trigger Control Unit prototipo
Come fanno i ricercatori a vedere le particelle?
UG40 Energy Saving & Twin Cool units Functioning and Adjustment
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
CMS RPC R&D for phase 2 Two types of upgrades proposed for the CMS RPC muon system: 1.Aging and longevity: installed in 2007, must continue to operate.
Attivita` di TileCal 2013 C.Roda Universita` e INFN Pisa Riunione referees ATLAS Roma 1 C.Roda Universita` e INFN Pisa.
M. Meschini 14/5/02 INFN Firenze L’Ibrido Ottico Analogico del Tracciatore CMS Commissione 1, LNF 13 Maggio 2002 Marco Meschini INFN Firenze.
SUMMARY Time domain and frequency domain RIEPILOGO Dominio del tempo e della frequenza RIEPILOGO Dominio del tempo e della frequenza.
SUMMARY Quadripoles and equivalent circuits RIEPILOGO Quadripoli e circuiti equivalenti RIEPILOGO Quadripoli e circuiti equivalenti.
Conversione Analogico/Digitale Le grandezze fisiche che vogliamo misurare variano con continuità in un dato intervallo ed in funzione del tempo: sono descrivibili.
SUMMARY A/D converters RIEPILOGO Convertitori A/D RIEPILOGO Convertitori A/D.
Filtri del secondo ordine e diagrammi di Bode
Stato Elettronica G-2 Italia M. Iacovacci, Napoli Roma, 7 Maggio 2014 Elettronica per Controllo Laser Elettronica di Monitoring Slow Control.
Update su elettronica e local DAQ M. Iacovacci Incontro Referee, 21 settembre 2015.
LSPE-SWIPE Crate for readout electronics 3 Nov 2014 Marco Incagli, Franco Spinella.
PixFEL G. Rizzo 9-Maggio PIXFEL Non ripeto qui tutte le considerazioni fatte da Valerio e Francesco in meeting precendenti. Goal del progetto: sviluppare.
L’esperimento (g-2)  a FNAL (E989) M.Iacovacci Naploli, 7 Gennaio 2015.
What’s new in KLOE-2? Testing procedures after assembly: Tests with X-ray gun (6 KeV source) for gain measurements (I-V curve) Tests with  source for.
S VILUPPO ELETTRONICA PER EMC BELLEII INFN ROMA3 Diego Tagnani 10/06/2014 ROMA 3 : D. P.
G-2 It G. Venanzoni LNF/INFN G-2 IT Meeting, Fiume Ottobre
Local monitor A.Anastasi, C. Ferrari, A. Fioretti, C. Gabbanini, G. Venanzoni 21 settembre 2015.
Status of the INFN Camera F. Giordano INFN - Bari For the CTA-INFN Team Bari - CTA F2F MeeingSITAEL 11 Marzo 2015.
SUMMARY Checking RIEPILOGO Verifiche RIEPILOGO Verifiche.
LASA, 4 Marzo 2008 SPARC-LAB: the Program Luca Serafini, INFN-MI Sara’ costituita da due elementi fondamentali: il fotoiniettore SPARC (+linee di fascio)
1 OUTLINE CSN I, Roma 19-20/1/2015 RICH&THGEMSilvia DALLA TORRE Impegni per costruzioni – bilancio 2014 Read-out rivelatori ibridi ottobre 2014 – gennaio.
Torre fase II: un aggiornamento M.Anghinolfi km3_IT collaboration meeting ROMA Novembre 2013.
Elettronica Monitoring, DAQ 27 Aprile 2016 M. Iacovacci, S. Mastroianni, O. Escalante, P. Di Meo.
Laboratorio II, modulo Conversione Analogico/Digitale ( cfr.
Mu2e Waveform Digitizer Review Franco Spinella Luca Morescalchi WD L3 Manager.
Elettronica per MEGup Donato Nicolo` Pisa 9 Luglio 2013.
XPR meeting – Control System status S. Toncelli Pavia, 12 dicembre 2014.
 Sviluppo dell’ASIC di front-end per i SiPM (Cristoforo)  PET system update and CNAO test beam results (Maria Antonietta)  Sviluppo del DAQ: motherboard,
10 Mev e S(e)-S(mu) = % DS(mu)/S(mu) = 5-70 % Streamer.
Università degli studi di Firenze Scuola di Scienze Matematiche, Fisiche e Naturali Corso di laurea triennale in Fisica e Astrofisica Verifica della linearità.
Tor Vergata Tor Vergata Liana Placitelli Implementazione Hardware e Software di un sistema di controllo PWM comandabile da remoto Relatore Prof. Bertazzoni.
Michele Iacovacci (Napoli),
Laboratorio II, modulo Matteo Duranti
Strumentazione elettronica 4 CFU – 32 ore
Lepton Flavour MEG A. Baldini CSN1 22 Nov. 2011: GGI.
Sistema di distribuzione laser
Laboratorio II, modulo Conversione Analogico/Digitale (cfr. e
Arduino UNO Single board microcontroller. Arduino UNO Single board microcontroller.
Introduzione L’AO può essere definito funzionalmente come un amplificatore differenziale, cioè un dispositivo attivo a tre terminali che genera al terminale.
Lodovico Ratti, Stefano Zucca
Microcontrollori e microprocessori
Stato e prospettive del lavoro sulle memorie associative.
The FOOT Calorimeter No TOF, high density and good energy resolution -> BGO TOF asks for 1.2 m lever arm -> R = 20 cm with 100 angular aperture of the.
Stato Elettronica e Misure su SiPM Napoli
Humidity and Temperature Control
Risultati preliminari test con sorgenti soft-X (Fe55) e b (Sr90/Y90) delle matrici 3x3 con output analogico M1 & 2 di Apsel3T1 sottoposte a irraggiamento.
FOOT Pixel tracker daq view.
Progetto LMB (1) Local Monitor: necessità di separare due impulsi PMT distanziati di circa 200 ns. Circa il segnale che la LMB deve fornire ai WFD, i.
Waveform Digitizer Review
Digitizer ReAdout Controller Dirac
Stato di Tilecal al 10/09/2008 (primo fascio)
RIVELATORI A TEMPO DI VOLO
Status della attività ATLAS TDAQ a Napoli
Stato pCT e test LNS M. Bruzzi, C. Civinini, G. Maccioni, F. Paulis, N. Randazzo, M. Scaringella, V. Sipala, C. Talamonti.
PROBLEMA: Lo slow shaper, o comunque qualcosa tra preamplificatore e ADC, mostra un guadagno almeno dieci volte inferiore a quello dichiarato per MAROC3.
Timestamp + campionamenti
P. Giannetti per il gruppo FTK
Modulistica per l’elettronica nucleare
A/D seconda parte.
Sistemi di Acquisizione dati
Strumentazione elettronica durata: 32 ore
Svolgimento della Sezione 5: CONTROLLORI
Preliminary results of DESY drift chambers efficiency test
Digitizer ReAdout Controller - DIRAC Status report
la situazione al momento è:
Transcript della presentazione:

Laser Control, Elettronica Monitoring, DAQ Roma, Maggio 2015 M. Iacovacci, S. Mastroianni, P. Di Meo

Laser Control System

Outlook Goals A schematic view The operation modes The architecture The implementation Checks and Test G-2 . Meeting, 17, April 2015 S. Mastroianni 1

Goals The Laser Control System: provides the calibration pulses in 700 μs time window according the two modes: Pulse train with fixed freq. “Flight” generation with an exponential function with τ= 64.4 μs manages the interface between DAQ and Laser System monitors and controls the calibration system G-2 . Meeting, 17, April 2015 S. Mastroianni 2

General view DAQ LASER MON Sys Fill/End_Of_Fill/eventually TriggerFlag/DAQ_Status/ Time Stamp for sync Laser_trigger/Laser_fault LASER The board reads Warning/LaserStatus And sends Laser_trigger MON Sys Signals from/to Monitor system G-2 . Meeting, 17, April 2015 S. Mastroianni 3

General view Laser Ctrl Mode Control Reg MON Sys Internal signals Fixed Freq. Flight Control Reg Setup & Status MON Sys Internal signals Test & debug Embedded Sys Management & control G-2 . Meeting, 17, April 2015 S. Mastroianni 4

Tested in Udine and Seattle Fixed pulse freq. Pulse generation in 700 μs Freq. range: 1 kHz  100 kHz 5 μs time shift every Fill cycle implemented in hardware Frequency and shift parameters can be configured Tested in Udine and Seattle G-2 . Meeting, 17, April 2015 S. Mastroianni 5

Flight generation - bin 100 ns Trigger counts according the exponential function A e-t/τ. - bin 100 ns Counts per 100 ns Time (μs) About 13 million of events have been considered G-2 . Meeting, 17, April 2015 S. Mastroianni 6

Average counts in 700μs Counts in 700μs for A: 0.2 0.05 0.02 The average counts go from about 13 to 1.3 <counts>≈3.2 <counts>≈1.3 G-2 . Meeting, 17, April 2015 S. Mastroianni 7

Implementation 1 (soft & hard) CPU FPGA Software FIFO # N Header Time#0 Time#1 … Time#N # N Header Time#0 Time#1 … Time#N TRG_gen TimeGen trigger TimeBase Software benefits: high level description within software side a different function can be implemented on the fly by changing only the formula (software) G-2 . Meeting, 17, April 2015 S. Mastroianni 8

CPU & FPGA Aria chip (acmesystem) Beaglebone Black (TI) 400 MHz with 256MB RAM 2 I2C 2 SPI 4 10-bit ADC Beaglebone Black (TI) 1 GHz with 500MB RAM 2 I2C 2 SPI 7 12-bit ADC Virtex5 (evaluation board ML507) GPIO …. G-2 . Meeting, 17, April 2015 S. Mastroianni 9

Distribution of counts measured on the oscilloscope New measurements Implementation on Virtex 5-FPGA & ARM9-μP G-2 . Meeting, 17, April 2015 S. Mastroianni 10

Status The two laser control operation modes have been implemented: Fixed freq. Flight in two versions Two Different FPGAs have been tested Filter wheels – SiPM Calibration 2 Pulse at Begin of Fill (DAQ) Interface (DAQ/Laser/etc..) Configuration & control scripts Software tested .. work in progress .. work in progress

Paper in progress

Signal Monitoring Monitoring Rack G. Venanzoni G-2It 13/01/2015 UD

Monitoring Rack AMeter MonCRATE – Local 1 DAQ TCP/IP AMeter 6 2 1 12 DAQ TCP/IP AMeter MonCRATE – Local 1 C O N T R L E 6 2 1 12 DAQ TCP/IP AMeter MonCRATE – Local 2 C O N T R L E 6 2 1 12 DAQ TCP/IP AMeter MonCRATE – Source

Sistema di lettura Segnali Monitoring L’unità modulare è il MonCRATE ogni MonCRATE serve 12 Calorimetri l’informazione di 1 Diffusore (2 (3) canali PD/PMT di cui 1 con Am ) è letta da 12 schede AMeter (3 canali/scheda) le quali ricevono le alimentazioni/segnali di controllo da bus sul backplane. Le AMeter board sono in grado di gestire i PD/ PMT e di autocalibrarsi. Sono in grado di accettare Trigger e di generare Trigger (Am) per il DAQ/WFD La lettura locale è a 14 bit, l’informazione digitizzata su ciscuna è raccolta/gestita da una scheda CONTROLLER che provvede a raccogliere tutta l’informazione digitizzata sul MonCRATE dalle singole AMeter e si interfaccia con il DAQ tramite protocollo TCP/IP C O N T R L E 6 2 1 12 DAQ TCP/IP AMeter

AMeter Board CONTROLLER Scheda Monitoring spedisce segnale a WFD, modo commune +/- 0.5 V su 1.9 V. Trigger: passa trigger del LASER/Monitoring al WFD/DAQ Trasferisce Trigger asincrono (Am) a uTCA /WFD Apre finestra digitizzazione al WFD. Digitizza segnali di Monitoring a 14 bit e spedisce al CONTROLLER il quale invia al DAQ tramite protocollo TCP/IP su fibra. Digitizzazione iniziata dal segnale del Laser Control (Start) opportunamente temporizzato (delay programmabile) Autocalibra ogni canale di elettronica Check stabilità di elettronica: dati a SLOW Control CONTROLLER

Test Elettronica FE per Monitoring

Formazione veloce impulsatore Agilent 33250 MCA Canberra multiportII Oscilloscopio Tek 3054 La scheda è dotata di due uscite, una è l’uscita del pulse shaper (connettore NIM); l’altra è un duplicato del pulse shaper inviato ad un amplificatore programmabile (connettore SMA). Scheda di test g-2PRE-v2+PS (montaggio segnale veloce) : Uscita preamplificatore 20ns rise time, sensibilità 800mV/pC, segnale uscita pulse shaper (PS) 600ns width sensibilità 475mV/pC, segnale uscita amplificatore guadagno variabile (PGA code 111 sensibilità 950mV/pC) La scheda è alimentata +12V (assorbe 37mA) e -12V (assorbe 28mA)

il segnale (mV) è stato fornito tramite capacita di 1pF sull’ingresso del preamplificatore (CSP), cui sarà poi collegato il Pin Diode. A sx: RMS (bit) del segnale in ingresso (Agilent 33250), all’uscita dello Shaper, all’uscita dell’Amplificatore a GV e rumore dell’elettronica verso Ampiezza Segnale d’ingresso; A dx: RMS (bit) del segnale all’uscita dell’Amplificatore a GV e rumore dell’elettronica verso Amplificazione per tre tensioni (250, 350 e 450 mV) Il rumore della scheda è stato stimato assumendo combinazione puramente casuale (quadratica) dei contributi. Sulla scala verticale (a dx del plot) è riportata la risoluzione intrinseca dell’elettronica assumendo di lavorare a circa 10000 conteggi.

Formazione lenta

Conclusioni Considerato che il rumore misurato in uscita dal CSP è praticamente lo stesso misurato in uscita dallo Shaper, ciò implica una forte dipendenza del rumore dal tempo di salita della formazione. Rumore dell’elettronica inferiore a 1 bit nel caso della formazione lenta (30 ns r.t.), mentre sale a meno di 2 bit con la formazione veloce (20 ns r.t). Poco dipendente dalla lunghezza della formazione. All’uscita dello stadio di Amplificazione, per amplificazioni inferiori a 5 il rumore è inferiore a 2 bit per la formazione a 20 ns, e a 1 bit per la formazione con rise time di 30 ns. I dati supportano una risoluzione intrinseca dell’elettronica di circa il 0.05 %.

Test Stand: Laser 375 nm, 1012 g/pulse, rate: 1 Hz -8 kHz

Laser and PIN signals Vmax T0 TPIN

Laser

PIN

Baseline Laser

TPIN-T0Laser sDT0 / DT0 < 1. 10-3 P1/<DT0>= 0.5 10-4 /h

Vmax-Vbaseline (PIN) sVmax /Vmax < 1. 10-3 P1/<Vmax>= 1. 10-4

VMaxFit-Vbaseline (PIN) sVmax /Vmax < 1. 10-3 P1/<Vmax>= 1.4 10-5

Conclusioni Fondamentale controllare Temperatura al meglio di 0.1 °C L’elettronica testata mostra una risoluzione migliore di 10-3 sul singolo impulso ed una stabilità migliore di 10-4/h sulla misura del segnale. Anche la temporizzazione dei segnali mostra stessi valori di risoluzione istantanea (< 10-3) e di stabilità nel tempo (< 10-4/h)