La presentazione è in caricamento. Aspetta per favore

La presentazione è in caricamento. Aspetta per favore

Advisory Committee of CERN Users (ACCU) F.-L. Navarria CSN1, Roma, 17 settembre 2007.

Presentazioni simili


Presentazione sul tema: "Advisory Committee of CERN Users (ACCU) F.-L. Navarria CSN1, Roma, 17 settembre 2007."— Transcript della presentazione:

1 Advisory Committee of CERN Users (ACCU) F.-L. Navarria CSN1, Roma, 17 settembre 2007

2 Riferimento, pagina Web: http://ph-dep.web.cern.ch/ph-dep/ACCU/ ad es. termini del mandato, minute delle riunioni dal 1998, argomenti discussi dal 1988, composizione, contatti con altri comitati del CERN, collegamento all’agenda delle riunioni – UO, avvisi, formulari, memoranda, etc. prima del 1988, usando CDS, solo qualche rimando a documenti cartacei – per ora Bibliografia

3 Mandato ► The task of ACCU is to advise the DG on the practical measures to be taken and administrative internal arrangements to be made by the CERN Management for the utilization of the CERN facilities for research. This concerns in particular the working conditions and the arrangements for technical support to the CERN Users for their activity at the CERN Laboratory. ► Questions dealing with the scientific programme of CERN do not fall under these terms of reference.

4 Composizione A.Two Users from each of the larger MS (Fr, De, I, UK); B. One User from each of the other Member States; C. Two CERN Staff members; D. Four Users from non-Member States. A. F. Kunne, A. Rosanov (F); H. Kroha, H.-C. Scultz-Coulon (De); N. Pastrone, FLN chair (I); S. McMahon, G. Wilkinson (UK) B. W. Adam (A), G. Wilquet (Be), (Bu), P. Závada (Cz), J.B. Hansen (Dk), K. Lassilla- Perini (Fi), Y. Tsipolitis (Gr), F. Siklér (H), G. Bobbink (Nl), G. Løvhøiden (N), M. Witek (Pl), P. Bordalo (Pt), A.Z. Dubnichová (Sl), C. Martinez-Rivero (Sp), K. Jon-And (Sw), K. Freudenreich (CH) C. P. Collins, T. Ruf D., D. Acosta, E. Etzion, V. Karjavine, R. Hayano CERN Management is represented by J. Engelen (CSO, Deputy DG), S. Lettow (CFO), [last meeting: M. Metzger (SG)], J. Salicio Diez/ PH, C. Onions/PH (Head of Users’ Office) as Secretary; C. Parrinello/HR and M. Goossens/Staff Association + others as needed

5 Nota Fino al 2003 era presente alle riunioni anche il DG, un direttore della ricerca, il direttore dell’amministrazione (a volte), il responsabile delle relazioni con i MS ACCU rappresenta tutti gli Users, staff e visitatori, appartenenti a tutti i dipartimenti [lo Users’ Office è stato parte delle divisioni NP, EP, PPE, EP e infine del dipartimento PH(-EP), adesso deve farsi carico di tutti gli users (non pagati, UPAS) con personale che invece non cresce]

6 Riunioni Quattro volte l’anno, la settimana prima del FC,Council; ad es. nel 2007: 7 marzo, 13 giugno, 12 settembre, 5 dicembre (tipicamente 9h15 ~ 13h15) Desktop Forum E. Etzion, (C. Onions) Archive Committee CO Accomodation Facilities ex HFC A. Rosanov, FLN, (CO) Groupe de Protection des Biens CO Restaurants’ Supervisory Comm. C. Martinez-Rivero Academic Training Committee FLN Scientific Information Policy Board K. Freudenreich, FLN Rappresentanti degli Users in altri comitati del CERN

7 Agenda della 77a riunione 12 settembre 2007 1.Chairman's remarks 2.Adoption of the agenda 3.Minutes of the previous meeting 4.Matters arising 5.News from the CERN Management 6.Logistics and transport at CERN 7.Car sharing pilot project 8.Reports from ACCU representatives on other Committees –Restaurants’ Supervisory Committee –Scientific Information Policy Board 9.Users' Office news 10.Any Other Business 11.Agenda for the next meeting Action items Rapporto di servizi del CERN include Accomodation Facilities & DTF reports

8 – CERN man.: To ensure sufficient resources to maintain services for users – CERN man.: To ensure that the security at the pits is reinforced by the introduction of guards: sono state installate videocamere, in un caso è stata fatta entrare la polizia per operare un arresto – ACCU del.: various points to be raised at AF meeting about hostels: (riunione su Accomodation Facilities il 10/09) Web booking, rules on block booking, unacceptable delays in (-ve) replies: la situazione è un po’ migliorata col nuovo foyer inaugurato a maggio (104 letti, +25%), nuovo contratto per la gestione del foyer in novembre risposta di ACCU sulle percentuali (Web&block) monitoring of refusals in Oct-Nov to see whether further action is needed (debt will be repaid end of 2008), nel 2004-5 avevamo stimato la necessità di ~200 camere addizionali e adesso il numero di users è in decisa crescita Action items

9 M. NONIS TS/FM – CERN Accomodation Facilities meeting – 10.9.2007 WEB BASED BOOKING SYSTEM (proposal)

10 Reservation type / category Maximum reservation delay 1 Maximum duration for one single stay Maximum duration of stay, within calendar year Maximum number of beds per visitor Acceptation criteria Building Priority over other reservations Single persons 60 days 1 or 2 --- 38, 39, 41 Summer students 60 days 90 days 1 Following list from the HR Dept. 38 Employed members and associates 2 60 days ----- 1 or 2 Concerned Department 38, 39, 41 Students (others) 60 days 1 Request from CERN University’s responsible 38, 39 Selection board candidates 60 days 1 à 2 days ---1 Given from the HR Dept. 38, 39, 41 Council members 12 months 60 days 1 or 2 Via the Council Secretariat 39 Visits 60 days From the day before to the day after the visit ---- 1 or 2 List given by the organiser 38, 39, 41 School groups (official visits) 60 days From the day before to the day after the visit ---- 30 % 3 List given by the school 38 Experimental weeks 4 / workshops 4 / conferences 4 / VIP visits 12 months From the day before to the day after the conference 60 days 30 % 3 List given by the secretariat or the organiser 38, 39, 41 1 – before arrival date 2 – only at beginning of contract 3 – of the total capacity per room type 4 – officially organised by CERN Building 38 :199rooms, 250 beds Building 39 :116rooms, 140 beds Building 41 :98rooms, 104 beds RESERVATION RULES

11 – ACCU del.: DTF representative to follow up the question of Skype: ci sono genuini problemi riguardo alla sicurezza, esistono soluzioni, ma non è chiaro chi ci possa lavorare sopra, il contratto non è stato ancora firmato – other matters arising – (AFC 10/9) prestito (super)agevolato da FIPOI per costruire nuovi uffici: ci sono stati contatti informali del CFO e la richiesta è stata ricevuta favorevolmente: prima di procedere formalmente occorre l’autorizzazione del C/FC – il pre-progetto riguarda l’estensione del Bat. 40 (300 posti per ufficio, la metà chiusi) anche in questo caso ci si aspetta una reazione di ACCU/users – Ombudsperson intiative: la task force ha preparato un rapporto con la proposta di formare un working group che deve essere nominato dal management del CERN Action items (2)

12 Notizie dal management il Council di giugno ha accettato i 240 MCHf addizionali nel 2008- 2011per evitare i problemi con nuove attività (aumento di luminosità, nuova catena di iniezione …), per metà forniti da F/CH, il budget 2008 deve essere negoziato questa settimana – LHC: la nuova schedula prevede collisioni nell’estate 2008; il settore 4-5 è stato raffreddato → alcune perdite; problemi con i plug-in modules, ma “solo” 5 su 500 – la celebrazione ufficiale dello start-up è fissata per il 21 ottobre 2008; ci sarà un Open Day il 5-6 aprile 2008 (sarà ancora possibile scendere nei pozzi), l’ultimo OD 04/10/16 fu un successo di pubblico inaspettato con >> 30 k visitatori – nomina del nuovo DG: short list, ma alcune delegazioni non sono contente della short list, riunione speciale del Council in ottobre

13 Rapporti di servizi del CERN Logistics and transport at CERN (Matti Tiirakari) http://indico.cern.ch/.http://indico.cern.ch/... material management rather complex, i) international organization & ii) INB imply delays; FI dept., ST dept. and various others involved and interconnected (before it was only one div.) → define & adapt services in collaboration with users’ dept., full traceability of operations, centralize the supply chain, harmonize stock management, optimize procurement (with other HEP labs.) Car sharing pilot project (Sascha Schmeling) http://indico.cern.ch/.http://indico.cern.ch/... 140 no-logo PH cars (15 short term loan) → 38 unanswered requests short term (59 long term) – current average usage ~1 h/day; car sharing: market survey, 10-30 cars + GPS etc. would cost 250 k (no cash this year)

14 Rapporti dei rappresentanti nei comitati Restaurant Supervision committee (CMartinezRivero ) http://indico.cern.ch/.http://indico.cern.ch/... il menu del R1 non è ancora sul Web, ma dietro un vetro, è stato aumentato il personale per la cena, i distributori automatici saranno Novae (4 dic.) e ce ne sarà uno nel MB Accomodation Facilities (ARosanov) http://indico.cern.ch/... già presentato negli Action items Scientific Information Policy Board (KFreudenreich) biblioteca, problemi di budget, alcune cancellazioni di abbonamenti di riviste, finanziamento di SCOAP3 (300 k per OA) – a questo proposito il SG osserva che le agenzie sono riluttanti a impegnarsi

15 Notizie UO – http://indico.cern.ch/... http://indico.cern.ch/. – rinnovo del contratto via EDH, è pronta una prima versione, da migliorare → UserContractRenewal (ma non tutti i TL hanno EDH!) – se un TL non è stato nominato entro la scadenza (2 mesi), il team sarà chiuso – PreRegistrationTool, nessun progresso da giugno – l’Attestation de Fonction necessita di essere rinnovata ogni anno, perchè? sarebbe auspicabile la Carte de Legitimation – 8,444 users sono registrati al momento – gli esperimenti durano 10 anni dopo il completamento: questo pone problemi in alcuni casi, eg Chorus Nomad

16 Da fare e da discutere – Soluzioni a breve termine per le foresterie etc.: regole chiare, alcuni miglioramenti (Web booking, ridurre il block booking, migliorare e rendere impersonale il servizio di prenotazione) – Soluzione a lungo termine, valutazione della necessità di ingrandire ulteriormente le foresterie – Spazio per uffici: con 300 posti addizionali, oltre ai 200 circa dati recentemente ad ATLAS-CMS, si dovrebbero coprire le necessità stimate in passato (una ulteriore indagine è/sarà in corso a breve)


Scaricare ppt "Advisory Committee of CERN Users (ACCU) F.-L. Navarria CSN1, Roma, 17 settembre 2007."

Presentazioni simili


Annunci Google